HAZARD IDENTIFICATION & RISK ASSESMENT (HIRA)

OHS‐PR‐02‐03‐F07 JOB SAFE PROCEDURE

Department / Division: Dammam Electricity Dept. / EOA. Date: 08-03-2024 Job/Task Type: 13.8kV Cable Splicing Works.
JSP No.: SGCC - JSP - COA - 003 Compiled by: Tareq Mohammed, Muhammad Abdul Javeed, Mahmoud Al-Tabbakh, Nawaf Al-Zanbaqi. Date:08-03-2024
Approved by SGCC
Zheng Xianzhao Date: 08-03-2024
Project Manager:
Head: Required Eye/Face: Required Feet: Required Clothing: Required Respiratory: Required
P.P.E. Required for Task:
Ear Protection: Required Safety Harness: Required Hands: Required Arc Flash PPE: Required Other - Specify:

Notes: Assuming That All Required Primary & Secondary Work Permits are Obtained, Lock Out Tag Out (LOTO) is Applied & All Equipment are Tested for No Existing Voltage.

Job Safe Procedure Analysis

HAZARDS DANGERS
Step No. List All Steps in Performing This Task In Each Step: What Could Cause (Injuries, Damage, Illness, Preventative Controls Required to Minimize /
(In Sequence) Injuries, Losses, Damages, Pollution, etc) Eliminate Hazards
Interruptions, or Pollution?

1- PPE (Slip Resistant Safety Shoes,


Perform Visual Inspection of the Location: Goggles, Hat, Working Gloves,
 Ensure the Surrounding Location is Safe and Mask).
01 Clean. Slip/Trip/Fall Injuries 2- Safety Workshop.
 Ensure there is Enough Clearance Around the 3- Supervisory Control.
Cables to Perform the Task Safely. 4- First Aid Kit.
5- Emergency Response Plan (ERP).
1- PPE (Slip Resistant Safety Shoes,
Goggles, Hat, Working Gloves,
Physical Injuries
Ergonomics Mask).
(Back Pain, etc.)
2- Ergonomics Safety Workshop.
3- Emergency Response Plan (ERP).
Prepare the Container, Van or Tent Equipped with Air
02 Conditioning Unit for the Cable Splicing Operation. 6- PPE (Slip Resistant Safety Shoes,
Goggles, Hat, Working Gloves,
(If Required)
Mask).
Slip/Trip/Fall Injuries 7- Safety Workshop.
8- Supervisory Control.
9- First Aid Kit.
10- Emergency Response Plan (ERP).
1- Toolbox Talk (TBT).
03 Prepare all Cables for Splicing: Electrical Electrocution 2- PPE (CAT2 Arc Flash Suit, Slip
Resistant Safety Shoes, Goggles,

Page 1 of 4 Rev. 01 [May ‐ 2020] Approved Document


HAZARD IDENTIFICATION & RISK ASSESMENT (HIRA)
OHS‐PR‐02‐03‐F07 JOB SAFE PROCEDURE

 Cut Cables, Expose Conductors, Clean Cables, Hat, Insulated Electrical Gloves,
etc. Mask, etc.).
 Install Initial Marking on All Cables. 3- First Aid Kit.
4- Fire Extinguisher.
5- Safety Workshop.
6- Emergency Response Plan (ERP).
1- Toolbox Talk (TBT).
2- PPE (Slip Resistant Safety Shoes,
Goggles, Hat, Working Gloves,
Mask).
Cutting Tools 3- Authorized Person. (Installation of
Injuries
Power Cable Joint and Termination
(Cable Cutter & Knife) (Hand Cut, etc.)
- 13.8 KV Training).
4- Splicing JSP Training.
5- First Aid Kit.
6- Suitable and enough lighting.
7- Emergency Response Plan (ERP).
1- PPE (Slip Resistant Safety Shoes,
Goggles, Hat, Working Gloves,
Physical Injuries
Ergonomics Mask).
(Back Pain, etc.)
2- Ergonomics Safety Workshop.
3- Emergency Response Plan (ERP).
1- PPE (Slip Resistant Safety Shoes,
Goggles, Hat, Working Gloves,
Mask).
Slip/Trip/Fall Injuries 2- Safety Workshop.
3- Supervisory Control.
4- First Aid Kit.
5- Emergency Response Plan (ERP).
1- Toolbox Talk (TBT).
2- PPE (Slip Resistant Safety Shoes,
Goggles, Hat, Working Gloves,
Burns, Injuries, Mask).
04 Cable Splicing Fire (Use of Torch) 3- Warning Signs, Warning Tapes,
Material Damage
Safety Mesh or Barriers Around the
Working Area.
4- Authorized Person. (Installation of
Power Cable Joint and Termination

Page 2 of 4 Rev. 01 [May ‐ 2020] Approved Document


HAZARD IDENTIFICATION & RISK ASSESMENT (HIRA)
OHS‐PR‐02‐03‐F07 JOB SAFE PROCEDURE

- 13.8 KV Training).
5- Periodic Cylinder Inspection &
Proper Storing & Handling.
6- First Aid Kit.
7- Fire Extinguisher.
8- Emergency Response Plan (ERP).
1- Toolbox Talk (TBT).
2- PPE (CAT2 Arc Flash Suit, Slip
Resistant Safety Shoes, Goggles,
Hat, Working Gloves, Mask).
Cutting Tools Injuries 3- Authorized Person. (Installation of
(Cable Cutter & Knife) (Hand Cut, etc.) Power Cable Jointer and Terminator
- 13.8 KV Training).
4- Termination JSP Training.
5- First Aid Kit.
6- Emergency Response Plan (ERP).
1- Toolbox Talk (TBT).
2- PPE (Slip Resistant Safety Shoes,
Goggles, Hat, Working Gloves,
Mask).
Injuries 3- Authorized Person. (Installation of
Crimping Machine
(Hand Cut, etc.) Power Cable Joint and Termination
- 13.8 KV Training).
4- Termination JSP Training.
5- First Aid Kit.
6- Emergency Response Plan (ERP).
1- PPE (Slip Resistant Safety Shoes,
Goggles, Hat, Working Gloves,
Physical Injuries
Ergonomics Mask).
(Back Pain, etc.)
2- Ergonomics Safety Workshop.
3- Emergency Response Plan (ERP).
Housekeeping 1- PPE (Slip Resistant Safety Shoes,
05
Goggles, Hat, Working Gloves,
Mask).
Slip/Trip/Fall Injuries 2- Safety Workshop.
3- Supervisory Control.
4- First Aid Kit.
5- Emergency Response Plan (ERP).

Page 3 of 4 Rev. 01 [May ‐ 2020] Approved Document


HAZARD IDENTIFICATION & RISK ASSESMENT (HIRA)
OHS‐PR‐02‐03‐F07 JOB SAFE PROCEDURE

Page 4 of 4 Rev. 01 [May ‐ 2020] Approved Document