Ru = Daya Dukung Ultimate Tiang Pancang

eh 2 Wr Hr Wr + n2 Wp. 1 eh = Faktor efisiensi dari Hammer (0.85 - 1.00) diambil 1


Ru = ----------------- . ------------------ -----
Wr. = Berat Ramp, (ton)
S+K Wr + Wp. SF
Wp. = Berat Tiang Pancang, (ton)
SF = Safety faktor / Angka Keamanan diambil 3 - 4
S = Penurunan Terakhir perpukulan
K = Safety faktor / Angka Keamanan diambil 2.5
35.676 1067
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
1 SBP 74 31/10/2023 31/10/2023 31/10/2023 16/12/2023 12/12/12 36 872 3,5 B 176,0 0,80 0,00 7,1676 2 252,63
2 SBP 75 31/10/2023 31/10/2023 31/10/2023 16/12/2023 12/12/12 36 881 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
3 PPF 02 31/10/2023 31/10/2023 31/10/2023 17/12/2023 12/12/12 36 815 3,5 B 176,0 1,00 0,00 7,1676 2 202,11
4 PPF 01 31/10/2023 31/10/2023 31/10/2023 17/12/2023 12/12/12 36 917 3,5 B 176,0 1,29 0,00 7,1676 2 156,67
5 SBP 65 31/10/2023 31/10/2023 31/10/2023 17/12/2023 12/12/12 36 1051 3,5 B 176,0 1,06 0,00 7,1676 2 190,67
6 LBP 43 31/10/2023 31/10/2023 17/12/2023 12/12 24 254 3,5 B 176,0 2,30 0,00 7,1676 2 87,87
7 SBP 64 31/10/2023 31/10/2023 31/10/2023 17/12/2023 12/12/12 36 896 3,5 B 176,0 1,15 0,00 7,1676 2 175,75
8 SBP 70 31/10/2023 31/10/2023 31/10/2023 17/12/2023 12/12/12 36 865 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
9 SBP 69 31/10/2023 31/10/2023 31/10/2023 17/12/2023 12/12/12 36 771 3,5 B 176,0 1,38 0,00 7,1676 2 146,45
10 SBP 76 31/10/2023 31/10/2023 31/10/2023 17/12/2023 12/12/12 36 866 3,5 B 176,0 1,50 0,00 7,1676 2 134,74
11 PPF 05 31/10/2023 31/10/2023 31/10/2023 18/12/2023 12/12/12 36 792 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
12 PPF 04 31/10/2023 31/10/2023 31/10/2023 18/12/2023 12/12/12 36 1062 3,5 B 176,0 0,85 0,00 7,1676 2 237,77
13 PPF 03 31/10/2023 31/10/2023 31/10/2023 18/12/2023 12/12/12 36 736 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
14 PPF 10 31/10/2023 31/10/2023 31/10/2023 18/12/2023 12/12/12 36 797 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
15 SBP 58 31/10/2023 31/10/2023 31/10/2023 18/12/2023 12/12/12 36 778 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
16 PPF 13 31/10/2023 31/10/2023 31/10/2023 18/12/2023 12/12/12 36 671 3,5 B 176,0 1,79 0,00 7,1676 2 112,91
17 PPF 09 31/10/2023 31/10/2023 31/10/2023 18/12/2023 12/12/12 36 631 3,5 B 176,0 1,80 0,00 7,1676 2 112,28
18 PPF 06 31/10/2023 31/10/2023 31/10/2023 18/12/2023 12/12/12 36 502 3,5 B 176,0 2,70 0,00 7,1676 2 74,85
19 PPF 14 31/10/2023 31/10/2023 31/10/2023 18/12/2023 12/12/12 36 747 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
20 SBP 57 31/10/2023 31/10/2023 31/10/2023 18/12/2023 12/12/12 36 680 3,5 B 176,0 2,00 0,00 7,1676 2 101,05
21 SBP 31 31/10/2023 31/10/2023 31/10/2023 19/12/2023 12/12/12 36 572 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
22 SBP 32 31/10/2023 31/10/2023 31/10/2023 19/12/2023 12/12/12 36 660 3,5 B 176,0 1,50 0,00 7,1676 2 134,74
23 SBP 46 31/10/2023 31/10/2023 31/10/2023 19/12/2023 12/12/12 36 579 3,5 B 176,0 2,15 0,00 7,1676 2 94,00
24 SBP 45 31/10/2023 31/10/2023 31/10/2023 19/12/2023 12/12/12 36 650 3,5 B 176,0 1,40 0,00 7,1676 2 144,36
25 SBP 52 31/10/2023 31/10/2023 31/10/2023 19/12/2023 12/12/12 36 653 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
26 SBP 51 31/10/2023 31/10/2023 31/10/2023 19/12/2023 12/12/12 36 660 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
27 PPF 31/10/2023 31/10/2023 31/10/2023 19/12/2023 12/12/12 36 636 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
28 PPF 31/10/2023 31/10/2023 31/10/2023 19/12/2023 12/12/12 36 657 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
29 LBP 02 31/10/2023 31/10/2023 20/12/2023 12/12 24 241 3,5 B 176,0 2,35 0,00 7,1676 2 86,00
30 LBP 11 31/10/2023 31/10/2023 20/12/2023 12/12 24 126 3,5 B 176,0 2,00 0,00 7,1676 2 101,05

1
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
31 SBP 74
LBP 03 31/10/2023 31/10/2023 20/12/2023 12/12 24 153 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
32 SBP 17 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 793 3,5 B 176,0 1,95 0,00 7,1676 2 103,64
33 LBP 01 31/10/2023 31/10/2023 20/12/2023 12/12 24 220 3,5 B 176,0 4,10 0,00 7,1676 2 49,29
34 SBP 05 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 835 3,5 B 176,0 1,10 0,00 7,1676 2 183,73
35 SBP 06 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 802 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
36 PPF 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 644 3,5 B 176,0 2,60 0,00 7,1676 2 77,73
37 PPF 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 834 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
38 PPF 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 716 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
39 PPF 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 773 3,5 B 176,0 1,30 0,00 7,1676 2 155,47
40 PPF 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 772 3,5 B 176,0 1,80 0,00 7,1676 2 112,28
41 PPF 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 779 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
42 SBP 29 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 492 3,5 B 176,0 2,50 0,00 7,1676 2 80,84
43 SBP 23 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 693 3,5 B 176,0 2,10 0,00 7,1676 2 96,24
44 PPF 31/10/2023 31/10/2023 31/10/2023 20/12/2023 12/12/12 36 632 3,5 B 176,0 1,90 0,00 7,1676 2 106,37
45 PPF 31/10/2023 31/10/2023 31/10/2023 21/12/2023 12/12/12 36 711 3,5 B 176,0 2,15 0,00 7,1676 2 94,00
46 PPF 31/10/2023 31/10/2023 31/10/2023 21/12/2023 12/12/12 36 551 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
47 LBP 21 31/10/2023 31/10/2023 21/12/2023 12/12 24 212 3,5 B 176,0 5,00 0,00 7,1676 2 40,42
48 LBP 26 31/10/2023 31/10/2023 21/12/2023 12/12 24 175 3,5 B 176,0 4,70 0,00 7,1676 2 43,00
49 PPF 31/10/2023 31/10/2023 31/10/2023 21/12/2023 12/12/12 36 704 3,5 B 176,0 1,63 0,00 7,1676 2 123,99
50 PPF 31/10/2023 31/10/2023 31/10/2023 21/12/2023 12/12/12 36 762 3,5 B 176,0 1,23 0,00 7,1676 2 164,31
51 LBP 16 31/10/2023 31/10/2023 21/12/2023 12/12 24 273 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
52 LBP 15 31/10/2023 31/10/2023 21/12/2023 12/12 24 199 3,5 B 176,0 4,75 0,00 7,1676 2 42,55
53 LBP 35 31/10/2023 31/10/2023 22/12/2023 12/12 24 224 3,5 B 176,0 2,95 0,00 7,1676 2 68,51
54 LBP 31 31/10/2023 31/10/2023 22/12/2023 12/12 24 195 3,5 B 176,0 3,65 0,00 7,1676 2 55,37
55 SBP 01 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 658 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
56 SBP 02 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 899 3,5 B 176,0 1,00 0,00 7,1676 2 202,11
57 SBP 08 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 1069 3,5 B 176,0 1,10 0,00 7,1676 2 183,73
58 SBP 07 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 630 3,5 B 176,0 3,50 0,00 7,1676 2 57,74
59 SBP 24 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 627 3,5 B 176,0 2,95 0,00 7,1676 2 68,51
60 LBP 04 31/10/2023 31/10/2023 22/12/2023 12/12 24 193 3,5 B 176,0 5,40 0,00 7,1676 2 37,43
61 LBP 12 31/10/2023 31/10/2023 22/12/2023 12/12 24 155 3,5 B 176,0 4,60 0,00 7,1676 2 43,94
62 SBP 25 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 786 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
63 PPF 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 667 3,5 B 176,0 1,55 0,00 7,1676 2 130,39
64 PPF 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 601 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
65 PPF 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 628 3,5 B 176,0 1,58 0,00 7,1676 2 127,92
66 PPF 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 580 3,5 B 176,0 2,50 0,00 7,1676 2 80,84
67 PPF 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 574 3,5 B 176,0 1,80 0,00 7,1676 2 112,28
68 PPF 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 658 3,5 B 176,0 1,50 0,00 7,1676 2 134,74
69 PPF 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 707 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
70 SBP 33 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 638 3,5 B 176,0 2,00 0,00 7,1676 2 101,05

2
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
71 SBP
PPF74 31/10/2023 31/10/2023 31/10/2023 22/12/2023 12/12/12 36 608 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
72 PPF 31/10/2023 31/10/2023 31/10/2023 23/12/2023 12/12/12 36 523 3,5 B 176,0 2,21 0,00 7,1676 2 91,45
73 PPF 31/10/2023 31/10/2023 31/10/2023 23/12/2023 12/12/12 36 675 3,5 B 176,0 1,95 0,00 7,1676 2 103,64
74 PPF 31/10/2023 31/10/2023 31/10/2023 23/12/2023 12/12/12 36 395 3,5 B 176,0 3,40 0,00 7,1676 2 59,44
75 PPF 31/10/2023 31/10/2023 31/10/2023 23/12/2023 12/12/12 36 398 3,5 B 176,0 4,40 0,00 7,1676 2 45,93
76 PPF 31/10/2023 31/10/2023 31/10/2023 23/12/2023 12/12/12 36 468 3,5 B 176,0 5,00 0,00 7,1676 2 40,42
77 SBP 34 31/10/2023 31/10/2023 31/10/2023 23/12/2023 12/12/12 36 389 3,5 B 176,0 3,80 0,00 7,1676 2 53,19
78 SBP 35 31/10/2023 31/10/2023 31/10/2023 23/12/2023 12/12/12 36 513 3,5 B 176,0 2,80 0,00 7,1676 2 72,18
79 PPF 31/10/2023 31/10/2023 31/10/2023 23/12/2023 12/12/12 36 381 3,5 B 176,0 2,80 0,00 7,1676 2 72,18
80 LBP 32 31/10/2023 31/10/2023 24/12/2023 12/12 24 151 3,5 B 176,0 5,80 0,00 7,1676 2 34,85
81 LBP 23 31/10/2023 31/10/2023 24/12/2023 12/12 24 154 3,5 B 176,0 3,10 0,00 7,1676 2 65,20
82 PPF 31/10/2023 31/10/2023 31/10/2023 24/12/2023 12/12/12 36 538 3,5 B 176,0 3,12 0,00 7,1676 2 64,78
83 PPF 31/10/2023 31/10/2023 31/10/2023 24/12/2023 12/12/12 36 716 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
84 PPF 31/10/2023 31/10/2023 31/10/2023 24/12/2023 12/12/12 36 602 3,5 B 176,0 1,70 0,00 7,1676 2 118,89
85 PPF 31/10/2023 31/10/2023 31/10/2023 24/12/2023 12/12/12 36 687 3,5 B 176,0 1,70 0,00 7,1676 2 118,89
86 PPF 31/10/2023 31/10/2023 31/10/2023 24/12/2023 12/12/12 36 640 3,5 B 176,0 1,95 0,00 7,1676 2 103,64
87 PPF 31/10/2023 31/10/2023 31/10/2023 24/12/2023 12/12/12 36 678 3,5 B 176,0 2,15 0,00 7,1676 2 94,00
88 PPF 31/10/2023 31/10/2023 31/10/2023 24/12/2023 12/12/12 36 517 3,5 B 176,0 3,00 0,00 7,1676 2 67,37
89 PPF 31/10/2023 31/10/2023 31/10/2023 24/12/2023 12/12/12 36 593 3,5 B 176,0 2,00 0,00 7,1676 2 101,05
90 PPF 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 336 3,5 B 176,0 1,60 0,00 7,1676 2 126,32
91 PPF 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 590 3,5 B 176,0 2,85 0,00 7,1676 2 70,91
92 PPF 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 629 3,5 B 176,0 1,78 0,00 7,1676 2 113,54
93 PPF 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 608 3,5 B 176,0 1,82 0,00 7,1676 2 111,05
94 PPF 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 633 3,5 B 176,0 1,77 0,00 7,1676 2 114,18
95 PPF 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 590 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
96 PPF 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 544 3,5 B 176,0 2,55 0,00 7,1676 2 79,26
97 LBP 05 31/10/2023 31/10/2023 25/12/2023 12/12 24 213 3,5 B 176,0 2,75 0,00 7,1676 2 73,49
98 LBP 13 31/10/2023 31/10/2023 25/12/2023 12/12 24 160 3,5 B 176,0 2,25 0,00 7,1676 2 89,83
99 MST 04 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 512 3,5 B 176,0 5,00 0,00 7,1676 2 40,42
100 MST 05 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 463 3,5 B 176,0 6,70 0,00 7,1676 2 30,17
101 MST 09 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 682 3,5 B 176,0 2,80 0,00 7,1676 2 72,18
102 MST 15 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 384 3,5 B 176,0 2,65 0,00 7,1676 2 76,27
103 MST 16 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 834 3,5 B 176,0 0,85 0,00 7,1676 2 237,77
104 MST 19 31/10/2023 31/10/2023 31/10/2023 25/12/2023 12/12/12 36 849 3,5 B 176,0 0,84 0,00 7,1676 2 240,60
105 MST 10 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 846 3,5 B 176,0 1,10 0,00 7,1676 2 183,73
106 MST 18 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 547 3,5 B 176,0 1,91 0,00 7,1676 2 105,82
107 LBP 07 31/10/2023 31/10/2023 26/12/2023 12/12 24 183 3,5 B 176,0 2,55 0,00 7,1676 2 79,26
108 LBP 06 31/10/2023 31/10/2023 26/12/2023 12/12 24 179 3,5 B 176,0 1,55 0,00 7,1676 2 130,39
109 SBP 04 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 490 3,5 B 176,0 3,75 0,00 7,1676 2 53,90
110 SBP 03 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 763 3,5 B 176,0 0,90 0,00 7,1676 2 224,56

3
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
111 74
SBP 10 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 424 3,5 B 176,0 2,50 0,00 7,1676 2 80,84
112 SBP 09 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 614 3,5 B 176,0 2,60 0,00 7,1676 2 77,73
113 MST 17 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 487 3,5 B 176,0 2,4 0,00 7,1676 2 84,21
114 PPF 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 404 3,5 B 176,0 4,9 0,00 7,1676 2 41,25
115 PPF 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 524 3,5 B 176,0 1,8 0,00 7,1676 2 112,28
116 SBP 36 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 518 3,5 B 176,0 2,1 0,00 7,1676 2 96,24
117 PPF 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 497 3,5 B 176,0 6,25 0,00 7,1676 2 32,34
118 PPF 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 523 3,5 B 176,0 2 0,00 7,1676 2 101,05
119 PPF 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 576 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
120 PPF 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 596 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
121 PPF 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 388 3,5 B 176,0 4 0,00 7,1676 2 50,53
122 PPF 31/10/2023 31/10/2023 31/10/2023 26/12/2023 12/12/12 36 581 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
123 PPF 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 528 3,5 B 176,0 1,8 0,00 7,1676 2 112,28
124 PPF 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 612 3,5 B 176,0 1,5 0,00 7,1676 2 134,74
125 PPF 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 748 3,5 B 176,0 1,7 0,00 7,1676 2 118,89
126 PPF 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 742 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
127 PPF 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 651 3,5 B 176,0 2,2 0,00 7,1676 2 91,87
128 PPF 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 681 3,5 B 176,0 2,8 0,00 7,1676 2 72,18
129 PPF 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 613 3,5 B 176,0 1,9 0,00 7,1676 2 106,37
130 PPF 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 689 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
131 MST 13 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 411 3,5 B 176,0 3,2 0,00 7,1676 2 63,16
132 MST 21 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 305 3,5 B 176,0 4,75 0,00 7,1676 2 42,55
133 MST 20 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 369 3,5 B 176,0 3,05 0,00 7,1676 2 66,26
134 LBP 17 31/10/2023 31/10/2023 27/12/2023 12/12 24 198 3,5 B 176,0 5 0,00 7,1676 2 40,42
135 LBP 14 31/10/2023 31/10/2023 27/12/2023 12/12 24 216 3,5 B 176,0 3,78 0,00 7,1676 2 53,47
136 LBP 23 31/10/2023 31/10/2023 27/12/2023 12/12 24 213 3,5 B 176,0 4,75 0,00 7,1676 2 42,55
137 MST 06 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 535 3,5 B 176,0 2,7 0,00 7,1676 2 74,85
138 MST 12 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 484 3,5 B 176,0 2,35 0,00 7,1676 2 86,00
139 MST 11 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 467 3,5 B 176,0 3,16 0,00 7,1676 2 63,96
140 PPF 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 581 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
141 PPF 31/10/2023 31/10/2023 31/10/2023 27/12/2023 12/12/12 36 667 3,5 B 176,0 1,8 0,00 7,1676 2 112,28
142 PPF 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 507 3,5 B 176,0 2,5 0,00 7,1676 2 80,84
143 PPF 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 689 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
144 PPF 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 527 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
145 MST 23 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 575 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
146 PPF 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 516 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
147 PPF 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 587 3,5 B 176,0 2,7 0,00 7,1676 2 74,85
148 PPF 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 727 3,5 B 176,0 1,55 0,00 7,1676 2 130,39
149 PPF 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 652 3,5 B 176,0 2,1 0,00 7,1676 2 96,24
150 MST 14 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 440 3,5 B 176,0 5 0,00 7,1676 2 40,42

4
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
151 SBP 74
MST 07 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 457 3,5 B 176,0 0,65 0,00 7,1676 2 310,93
152 MST 08 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 431 3,5 B 176,0 3,25 0,00 7,1676 2 62,19
153 SBP 18 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 1078 3,5 B 176,0 1,4 0,00 7,1676 2 144,36
154 SBP 11 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 607 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
155 SBP 12 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 634 3,5 B 176,0 3,18 0,00 7,1676 2 63,56
156 SBP 13 31/10/2023 31/10/2023 31/10/2023 28/12/2023 12/12/12 36 395 3,5 B 176,0 3,12 0,00 7,1676 2 64,78
157 LBP 08 31/10/2023 31/10/2023 28/12/2023 12/12 24 381 3,5 B 176,0 3,7 0,00 7,1676 2 54,62
158 PPF 31/10/2023 31/10/2023 31/10/2023 29/12/2023 12/12/12 36 663 3,5 B 176,0 1,76 0,00 7,1676 2 114,83
159 MST 24 31/10/2023 31/10/2023 31/10/2023 29/12/2023 12/12/12 36 674 3,5 B 176,0 1,7 0,00 7,1676 2 118,89
160 PPF 31/10/2023 31/10/2023 31/10/2023 29/12/2023 12/12/12 36 620 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
161 LBP 32 31/10/2023 31/10/2023 29/12/2023 12/12 24 138 3,5 B 176,0 4 0,00 7,1676 2 50,53
162 LBP 37 31/10/2023 31/10/2023 29/12/2023 12/12 24 178 3,5 B 176,0 3 0,00 7,1676 2 67,37
163 LBP 33 31/10/2023 31/10/2023 29/12/2023 12/12 24 133 3,5 B 176,0 4,8 0,00 7,1676 2 42,11
164 LBP 36 31/10/2023 31/10/2023 29/12/2023 12/12 24 155 3,5 B 176,0 6,6 0,00 7,1676 2 30,62
165 LBP 24 31/10/2023 31/10/2023 29/12/2023 12/12 24 201 3,5 B 176,0 4,08 0,00 7,1676 2 49,54
166 LBP 28 31/10/2023 31/10/2023 29/12/2023 12/12 24 197 3,5 B 176,0 6 0,00 7,1676 2 33,68
167 LBP 18 31/10/2023 31/10/2023 29/12/2023 12/12 24 181 3,5 B 176,0 5,8 0,00 7,1676 2 34,85
168 SBP 20 31/10/2023 31/10/2023 31/10/2023 29/12/2023 12/12/12 36 653 3,5 B 176,0 2,1 0,00 7,1676 2 96,24
169 SBP 19 31/10/2023 31/10/2023 31/10/2023 29/12/2023 12/12/12 36 783 3,5 B 176,0 3,43 0,00 7,1676 2 58,92
170 LBP 09 31/10/2023 31/10/2023 29/12/2023 12/12 24 144 3,5 B 176,0 4,7 0,00 7,1676 2 43,00
171 PPF 31/10/2023 31/10/2023 31/10/2023 30/12/2023 12/12/12 36 577 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
172 PPF 31/10/2023 31/10/2023 31/10/2023 30/12/2023 12/12/12 36 522 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
173 PPF 31/10/2023 31/10/2023 31/10/2023 30/12/2023 12/12/12 36 632 3,5 B 176,0 2,15 0,00 7,1676 2 94,00
174 PPF 31/10/2023 31/10/2023 31/10/2023 30/12/2023 12/12/12 36 608 3,5 B 176,0 1,58 0,00 7,1676 2 127,92
175 SBP 42 31/10/2023 31/10/2023 31/10/2023 30/12/2023 12/12/12 36 567 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
176 SBP 14 31/10/2023 31/10/2023 31/10/2023 30/12/2023 12/12/12 36 638 3,5 B 176,0 1,34 0,00 7,1676 2 150,83
177 LBP 20 31/10/2023 31/10/2023 30/12/2023 12/12 24 206 3,5 B 176,0 4,14 0,00 7,1676 2 48,82
178 LBP 19 31/10/2023 31/10/2023 30/12/2023 12/12 24 159 3,5 B 176,0 7,25 0,00 7,1676 2 27,88
179 LBP 25 31/10/2023 31/10/2023 30/12/2023 12/12 24 190 3,5 B 176,0 3,85 0,00 7,1676 2 52,50
180 LBP 29 31/10/2023 31/10/2023 30/12/2023 12/12 24 200 3,5 B 176,0 3,5 0,00 7,1676 2 57,74
181 LBP 30 31/10/2023 31/10/2023 30/12/2023 12/12 24 215 3,5 B 176,0 4,04 0,00 7,1676 2 50,03
182 LBP 34 31/10/2023 31/10/2023 30/12/2023 12/12 24 244 3,5 B 176,0 2,5 0,00 7,1676 2 80,84
183 SBP 27 31/10/2023 31/10/2023 31/10/2023 30/12/2023 12/12/12 36 439 3,5 B 176,0 4,6 0,00 7,1676 2 43,94
184 SBP 26 31/10/2023 31/10/2023 31/10/2023 30/12/2023 12/12/12 36 543 3,5 B 176,0 2,4 0,00 7,1676 2 84,21
185 SBP 43 31/10/2023 31/10/2023 31/10/2023 30/12/2023 12/12/12 36 570 3,5 B 176,0 4,91 0,00 7,1676 2 41,16
186 LBP 10 31/10/2023 31/10/2023 31/12/2023 12/12 24 245 3,5 B 176,0 1,05 0,00 7,1676 2 192,48
187 SBP 15 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 975 3,5 B 176,0 1,82 0,00 7,1676 2 111,05
188 SBP 22 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 662 3,5 B 176,0 2,6 0,00 7,1676 2 77,73
189 SBP 21 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 1072 3,5 B 176,0 2,18 0,00 7,1676 2 92,71
190 SBP 16 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 1072 3,5 B 176,0 1,85 0,00 7,1676 2 109,25

5
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
191 SBP
PPF74 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 654 3,5 B 176,0 1,9 0,00 7,1676 2 106,37
192 PPF 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 718 3,5 B 176,0 1,9 0,00 7,1676 2 106,37
193 SBP 77 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 879 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
194 PPF 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 789 3,5 B 176,0 1,68 0,00 7,1676 2 120,30
195 PPF 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 745 3,5 B 176,0 1,51 0,00 7,1676 2 133,85
196 PPF 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 723 3,5 B 176,0 1,61 0,00 7,1676 2 125,53
197 PPF 31/10/2023 31/10/2023 31/10/2023 31/12/2023 12/12/12 36 983 3,5 B 176,0 1,33 0,00 7,1676 2 151,96
198 PPF 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 732 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
199 SBP 78 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 884 3,5 B 176,0 1,18 0,00 7,1676 2 171,28
200 SBP 80 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 899 3,5 B 176,0 1,2 0,00 7,1676 2 168,42
201 PPF 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 755 3,5 B 176,0 1,61 0,00 7,1676 2 125,53
202 PPF 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 514 3,5 B 176,0 2,6 0,00 7,1676 2 77,73
203 PPF 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 561 3,5 B 176,0 15,8 0,00 7,1676 2 12,79
204 SBP 81 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 868 3,5 B 176,0 1,38 0,00 7,1676 2 146,45
205 SBP 79 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 725 3,5 B 176,0 2,1 0,00 7,1676 2 96,24
206 SBP 44 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 529 3,5 B 176,0 2,6 0,00 7,1676 2 77,73
207 SBP 30 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 515 3,5 B 176,0 2,72 0,00 7,1676 2 74,30
208 SBP 28 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 578 3,5 B 176,0 2,61 0,00 7,1676 2 77,44
209 MST 03 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 647 3,5 B 176,0 4,9 0,00 7,1676 2 41,25
210 MST 01 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 647 3,5 B 176,0 1,55 0,00 7,1676 2 130,39
211 MST 02 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 933 3,5 B 176,0 2,65 0,00 7,1676 2 76,27
212 SBP 50 31/10/2023 31/10/2023 31/10/2023 02/01/2024 12/12/12 36 656 3,5 B 176,0 2,61 0,00 7,1676 2 77,44
213 SBP 83 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 521 3,5 B 176,0 2,38 0,00 7,1676 2 84,92
214 CB 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 752 3,5 B 176,0 2,05 0,00 7,1676 2 98,59
215 PPF 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 752 3,5 B 176,0 1,98 0,00 7,1676 2 102,07
216 CB 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 681 3,5 B 176,0 1,83 0,00 7,1676 2 110,44
217 PPF 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 522 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
218 PPF 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 427 3,5 B 176,0 1,78 0,00 7,1676 2 113,54
219 CB 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 686 3,5 B 176,0 1,86 0,00 7,1676 2 108,66
220 PPF 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 559 3,5 B 176,0 1,97 0,00 7,1676 2 102,59
221 PPF 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 589 3,5 B 176,0 1,76 0,00 7,1676 2 114,83
222 CB 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 843 3,5 B 176,0 1,8 0,00 7,1676 2 112,28
223 SBP 82 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 611 3,5 B 176,0 1,53 0,00 7,1676 2 132,10
224 PPF 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 730 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
225 PPF 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 703 3,5 B 176,0 2,28 0,00 7,1676 2 88,64
226 PPF 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 681 3,5 B 176,0 2,18 0,00 7,1676 2 92,71
227 CB 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 644 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
228 CB 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 698 3,5 B 176,0 1,52 0,00 7,1676 2 132,97
229 CB 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 706 3,5 B 176,0 2,38 0,00 7,1676 2 84,92
230 SBP 63 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 851 3,5 B 176,0 1,81 0,00 7,1676 2 111,66

6
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
231 74
SBP 56 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 828 3,5 B 176,0 1,2 0,00 7,1676 2 168,42
232 SBP 73 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 834 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
233 SBP 85 31/10/2023 31/10/2023 31/10/2023 03/01/2024 12/12/12 36 687 3,5 B 176,0 1,52 0,00 7,1676 2 132,97
234 SBP 71 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 416 3,5 B 176,0 5,16 0,00 7,1676 2 39,17
235 CB 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 620 3,5 B 176,0 3,35 0,00 7,1676 2 60,33
236 CB 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 383 3,5 B 176,0 1,94 0,00 7,1676 2 104,18
237 CB 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 797 3,5 B 176,0 1,54 0,00 7,1676 2 131,24
238 SBP 68 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 788 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
239 CB 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 736 3,5 B 176,0 2,55 0,00 7,1676 2 79,26
240 CB 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 570 3,5 B 176,0 1,14 0,00 7,1676 2 177,29
241 CB 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 578 3,5 B 176,0 1,11 0,00 7,1676 2 182,08
242 SBP 72 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 655 3,5 B 176,0 1,42 0,00 7,1676 2 142,33
243 PPF 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 519 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
244 PPF 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 663 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
245 PPF 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 542 3,5 B 176,0 1,71 0,00 7,1676 2 118,19
246 CB 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 679 3,5 B 176,0 1,05 0,00 7,1676 2 192,48
247 MST 25 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 562 3,5 B 176,0 1,73 0,00 7,1676 2 116,83
248 PPF 31/10/2023 31/10/2023 31/10/2023 04/01/2024 12/12/12 36 719 3,5 B 176,0 1,32 0,00 7,1676 2 153,11
249 CB 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 856 3,5 B 176,0 2,43 0,00 7,1676 2 83,17
250 CB 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 910 3,5 B 176,0 1,38 0,00 7,1676 2 146,45
251 SBP 54 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 738 3,5 B 176,0 2,22 0,00 7,1676 2 91,04
252 SBP 53 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 637 3,5 B 176,0 1,73 0,00 7,1676 2 116,83
253 SBP 41 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 594 3,5 B 176,0 2,4 0,00 7,1676 2 84,21
254 SBP 40 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 547 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
255 SBP 38/39 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 584 3,5 B 176,0 1,8 0,00 7,1676 2 112,28
256 SBP 47 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 394 3,5 B 176,0 3,41 0,00 7,1676 2 59,27
257 SBP 48 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 432 3,5 B 176,0 2,63 0,00 7,1676 2 76,85
258 SBP 66 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 728 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
259 SBP 59 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 721 3,5 B 176,0 1,3 0,00 7,1676 2 155,47
260 CB 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 365 3,5 B 176,0 2,44 0,00 7,1676 2 82,83
261 CB 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 435 3,5 B 176,0 0,812 0,00 7,1676 2 248,90
262 CB 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 486 3,5 B 176,0 2,18 0,00 7,1676 2 92,71
263 SBP 67 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 676 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
264 CB 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 737 3,5 B 176,0 1,79 0,00 7,1676 2 112,91
265 CB 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 338 3,5 B 176,0 0,88 0,00 7,1676 2 229,67
266 SBP 60 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 259 3,5 B 176,0 7,31 0,00 7,1676 2 27,65
267 SBP 37 31/10/2023 31/10/2023 31/10/2023 05/01/2024 12/12/12 36 357 3,5 B 176,0 2,97 0,00 7,1676 2 68,05
268 SBP 84 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 697 3,5 B 176,0 1,62 0,00 7,1676 2 124,76
269 PPF 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 502 3,5 B 176,0 7,16 0,00 7,1676 2 28,23
270 MST 22 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 302 3,5 B 176,0 3,93 0,00 7,1676 2 51,43

7
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
271 SBP
PPF74 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 368 3,5 B 176,0 2,97 0,00 7,1676 2 68,05
272 PPF 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 339 3,5 B 176,0 2,94 0,00 7,1676 2 68,74
273 PPF 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 348 3,5 B 176,0 2,87 0,00 7,1676 2 70,42
274 PPF 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 484 3,5 B 176,0 1,86 0,00 7,1676 2 108,66
275 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 366 3,5 B 176,0 1,15 0,00 7,1676 2 175,75
276 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 563 3,5 B 176,0 2,91 0,00 7,1676 2 69,45
277 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 390 3,5 B 176,0 5,56 0,00 7,1676 2 36,35
278 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 303 3,5 B 176,0 5,5 0,00 7,1676 2 36,75
279 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 345 3,5 B 176,0 6,37 0,00 7,1676 2 31,73
280 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 776 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
281 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 771 3,5 B 176,0 2,16 0,00 7,1676 2 93,57
282 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 534 3,5 B 176,0 1,24 0,00 7,1676 2 162,99
283 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 641 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
284 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 814 3,5 B 176,0 1,63 0,00 7,1676 2 123,99
285 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 522 3,5 B 176,0 3,05 0,00 7,1676 2 66,26
286 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 748 3,5 B 176,0 2,35 0,00 7,1676 2 86,00
287 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 790 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
288 CB 31/10/2023 31/10/2023 31/10/2023 06/01/2024 12/12/12 36 786 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
289 CB 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 636 3,5 B 176,0 1,67 0,00 7,1676 2 121,02
290 CB 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 719 3,5 B 176,0 1,74 0,00 7,1676 2 116,15
291 MST 28 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 430 3,5 B 176,0 1,94 0,00 7,1676 2 104,18
292 MST 30 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 430 3,5 B 176,0 2,64 0,00 7,1676 2 76,56
293 MST 29 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 298 3,5 B 176,0 6 0,00 7,1676 2 33,68
294 CB 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 560 3,5 B 176,0 3,75 0,00 7,1676 2 53,90
295 MST 26 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 362 3,5 B 176,0 4,41 0,00 7,1676 2 45,83
296 SBP 61 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 440 3,5 B 176,0 6,62 0,00 7,1676 2 30,53
297 MST 27 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 394 3,5 B 176,0 4,46 0,00 7,1676 2 45,32
298 PPF 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 364 3,5 B 176,0 2,19 0,00 7,1676 2 92,29
299 PPF 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 399 3,5 B 176,0 2,53 0,00 7,1676 2 79,88
300 PPF 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 414 3,5 B 176,0 2,61 0,00 7,1676 2 77,44
301 PPF 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 359 3,5 B 176,0 3,12 0,00 7,1676 2 64,78
302 PPF 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 655 3,5 B 176,0 1,92 0,00 7,1676 2 105,26
303 PPF 31/10/2023 31/10/2023 31/10/2023 07/01/2024 12/12/12 36 921 3,5 B 176,0 1,94 0,00 7,1676 2 104,18
304 PPF 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 602 3,5 B 176,0 3,58 0,00 7,1676 2 56,45
305 PPF 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 327 3,5 B 176,0 6,12 0,00 7,1676 2 33,02
306 PPF 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 695 3,5 B 176,0 1,38 0,00 7,1676 2 146,45
307 PPF 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 717 3,5 B 176,0 1,58 0,00 7,1676 2 127,92
308 PPF 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 531 3,5 B 176,0 1,44 0,00 7,1676 2 140,35
309 PPF 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 647 3,5 B 176,0 2,37 0,00 7,1676 2 85,28
310 PPF 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 699 3,5 B 176,0 1,66 0,00 7,1676 2 121,75

8
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
311 SBP(BE)
PPF 74 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 403 3,5 B 176,0 1,42 0,00 7,1676 2 142,33
312 CB 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 285 3,5 B 176,0 1,53 0,00 7,1676 2 132,10
313 CB 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 863 3,5 B 176,0 1,55 0,00 7,1676 2 130,39
314 CB 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 336 3,5 B 176,0 1,08 0,00 7,1676 2 187,14
315 MST 34 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 417 3,5 B 176,0 2,95 0,00 7,1676 2 68,51
316 CB 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 736 3,5 B 176,0 1,46 0,00 7,1676 2 138,43
317 MST 32 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 349 3,5 B 176,0 4,17 0,00 7,1676 2 48,47
318 WB 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 1273 3,5 B 176,0 0,65 0,00 7,1676 2 310,93
319 WB 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 1189 3,5 B 176,0 0,98 0,00 7,1676 2 206,23
320 WB 31/10/2023 31/10/2023 31/10/2023 08/01/2024 12/12/12 36 1160 3,5 B 176,0 0,73 0,00 7,1676 2 276,86
321 FPPL 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 975 3,5 B 176,0 1,55 0,00 7,1676 2 130,39
322 FPPL 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 799 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
323 FPPB 31/10/2023 31/10/2023 09/01/2024 12/12 24 156 3,5 B 176,0 3,86 0,00 7,1676 2 52,36
324 FPPL 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 749 3,5 B 176,0 1,63 0,00 7,1676 2 123,99
325 FPPL 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 777 3,5 B 176,0 1,78 0,00 7,1676 2 113,54
326 FPPL 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 722 3,5 B 176,0 2,96 0,00 7,1676 2 68,28
327 FPPB 31/10/2023 31/10/2023 09/01/2024 12/12 24 171 3,5 B 176,0 3,86 0,00 7,1676 2 52,36
328 FPPB 31/10/2023 31/10/2023 09/01/2024 12/12 24 201 3,5 B 176,0 3,38 0,00 7,1676 2 59,80
329 FPPB 31/10/2023 31/10/2023 09/01/2024 12/12 24 201 3,5 B 176,0 5,37 0,00 7,1676 2 37,64
330 FPPL 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 747 3,5 B 176,0 1,78 0,00 7,1676 2 113,54
331 FPPB 31/10/2023 31/10/2023 09/01/2024 12/12 24 201 3,5 B 176,0 6,87 0,00 7,1676 2 29,42
332 WB 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 1373 3,5 B 176,0 1,31 0,00 7,1676 2 154,28
333 WB 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 1105 3,5 B 176,0 1,1 0,00 7,1676 2 183,73
334 WB 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 1112 3,5 B 176,0 0,97 0,00 7,1676 2 208,36
335 WB 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 1239 3,5 B 176,0 0,59 0,00 7,1676 2 342,55
336 WB 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 1161 3,5 B 176,0 2,11 0,00 7,1676 2 95,79
337 WB 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 1185 3,5 B 176,0 1,42 0,00 7,1676 2 142,33
338 WB 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 659 3,5 B 176,0 3,41 0,00 7,1676 2 59,27
339 WB 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 824 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
340 SBP 62 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 408 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
341 LBP 42 31/10/2023 31/10/2023 09/01/2024 12/12 24 145 3,5 B 176,0 6,45 0,00 7,1676 2 31,33
342 LBP 41 31/10/2023 31/10/2023 09/01/2024 12/12 24 199 3,5 B 176,0 6,42 0,00 7,1676 2 31,48
343 SBP 55 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 550 3,5 B 176,0 4,15 0,00 7,1676 2 48,70
344 LBP 40 31/10/2023 31/10/2023 09/01/2024 12/12 24 220 3,5 B 176,0 4,46 0,00 7,1676 2 45,32
345 LBP 39 31/10/2023 31/10/2023 09/01/2024 12/12 24 220 3,5 B 176,0 7,46 0,00 7,1676 2 27,09
346 SBP 49 31/10/2023 31/10/2023 31/10/2023 09/01/2024 12/12/12 36 408 3,5 B 176,0 1,53 0,00 7,1676 2 132,10
347 FPPL 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 881 3,5 B 176,0 1,39 0,00 7,1676 2 145,40
348 FPPB 31/10/2023 31/10/2023 10/01/2024 12/12 24 177 3,5 B 176,0 5,1 0,00 7,1676 2 39,63
349 FPPL 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 737 3,5 B 176,0 1,4 0,00 7,1676 2 144,36
350 FPPL 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 698 3,5 B 176,0 1,61 0,00 7,1676 2 125,53

9
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
351 SBP 74
FPPL 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 1307 3,5 B 176,0 1,05 0,00 7,1676 2 192,48
352 FPPL 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 1143 3,5 B 176,0 1,49 0,00 7,1676 2 135,64
353 FPPB 31/10/2023 31/10/2023 10/01/2024 12/12 24 213 3,5 B 176,0 2,7 0,00 7,1676 2 74,85
354 FPPL 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 792 3,5 B 176,0 1,49 0,00 7,1676 2 135,64
355 FPPL 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 930 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
356 FPPL 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 945 3,5 B 176,0 1,28 0,00 7,1676 2 157,90
357 FPPL 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 1322 3,5 B 176,0 1 0,00 7,1676 2 202,11
358 FPPB 31/10/2023 31/10/2023 10/01/2024 12/12 24 193 3,5 B 176,0 2,2 0,00 7,1676 2 91,87
359 WB 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 714 3,5 B 176,0 1,47 0,00 7,1676 2 137,49
360 WB 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 916 3,5 B 176,0 0,98 0,00 7,1676 2 206,23
361 WB 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 872 3,5 B 176,0 2,78 0,00 7,1676 2 72,70
362 WB 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 626 3,5 B 176,0 3,12 0,00 7,1676 2 64,78
363 WB 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 717 3,5 B 176,0 2,22 0,00 7,1676 2 91,04
364 WB 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 1811 3,5 B 176,0 0,64 0,00 7,1676 2 315,79
365 WB 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 1226 3,5 B 176,0 1,1 0,00 7,1676 2 183,73
366 WB 31/10/2023 31/10/2023 31/10/2023 10/01/2024 12/12/12 36 1183 3,5 B 176,0 1,28 0,00 7,1676 2 157,90
367 FPPB 31/10/2023 31/10/2023 11/01/2024 12/12 24 228 3,5 B 176,0 2,16 0,00 7,1676 2 93,57
368 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 2060 3,5 B 176,0 0,72 0,00 7,1676 2 280,70
369 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 2433 3,5 B 176,0 0,6 0,00 7,1676 2 336,85
370 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1548 3,5 B 176,0 1,04 0,00 7,1676 2 194,33
371 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1134 3,5 B 176,0 1,51 0,00 7,1676 2 133,85
372 FPPB 31/10/2023 31/10/2023 11/01/2024 12/12 24 230 3,5 B 176,0 2,18 0,00 7,1676 2 92,71
373 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1134 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
374 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1675 3,5 B 176,0 0,77 0,00 7,1676 2 262,48
375 FPPB 31/10/2023 31/10/2023 11/01/2024 12/12 24 167 3,5 B 176,0 4,87 0,00 7,1676 2 41,50
376 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 794 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
377 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 888 3,5 B 176,0 1,68 0,00 7,1676 2 120,30
378 FPPB 31/10/2023 31/10/2023 11/01/2024 12/12 24 314 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
379 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1145 3,5 B 176,0 1 0,00 7,1676 2 202,11
380 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1142 3,5 B 176,0 1,27 0,00 7,1676 2 159,14
381 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1246 3,5 B 176,0 0,89 0,00 7,1676 2 227,09
382 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 843 3,5 B 176,0 1,89 0,00 7,1676 2 106,94
383 FPPL 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 864 3,5 B 176,0 1,46 0,00 7,1676 2 138,43
384 WB 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 716 3,5 B 176,0 1,4 0,00 7,1676 2 144,36
385 WB 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 924 3,5 B 176,0 2,85 0,00 7,1676 2 70,91
386 WB 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1661 3,5 B 176,0 0,28 0,00 7,1676 2 721,81
387 WB 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1568 3,5 B 176,0 1,9 0,00 7,1676 2 106,37
388 WB 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1351 3,5 B 176,0 1,16 0,00 7,1676 2 174,23
389 WB 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1167 3,5 B 176,0 1,73 0,00 7,1676 2 116,83
390 WB 31/10/2023 31/10/2023 31/10/2023 11/01/2024 12/12/12 36 1134 3,5 B 176,0 0,65 0,00 7,1676 2 310,93

10
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
391 SBP
WB74 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1473 3,5 B 176,0 0,87 0,00 7,1676 2 232,31
392 WB 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 947 3,5 B 176,0 2,45 0,00 7,1676 2 82,49
393 FPPB 01 31/10/2023 31/10/2023 12/01/2024 12/12 24 305 3,5 B 176,0 2,53 0,00 7,1676 2 79,88
394 FPPB 19 31/10/2023 31/10/2023 12/01/2024 12/12 24 289 3,5 B 176,0 1,68 0,00 7,1676 2 120,30
395 FPPB 20 31/10/2023 31/10/2023 12/01/2024 12/12 24 200 3,5 B 176,0 2,41 0,00 7,1676 2 83,86
396 FPPB 02 31/10/2023 31/10/2023 12/01/2024 12/12 24 235 3,5 B 176,0 2,42 0,00 7,1676 2 83,52
397 FPPB 03 31/10/2023 31/10/2023 12/01/2024 12/12 24 258 3,5 B 176,0 5,44 0,00 7,1676 2 37,15
398 FPPL 01 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 962 3,5 B 176,0 0,82 0,00 7,1676 2 246,47
399 FPPL 24 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1906 3,5 B 176,0 0,57 0,00 7,1676 2 354,57
400 FPPL 02 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1960 3,5 B 176,0 0,54 0,00 7,1676 2 374,27
401 FPPL 32 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1390 3,5 B 176,0 1,11 0,00 7,1676 2 182,08
402 FPPL 09 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 758 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
403 FPPB 07 31/10/2023 31/10/2023 12/01/2024 12/12 24 209 3,5 B 176,0 0,98 0,00 7,1676 2 206,23
404 FPPL 33 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 791 3,5 B 176,0 2 0,00 7,1676 2 101,05
405 FPPL 10 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 756 3,5 B 176,0 1,36 0,00 7,1676 2 148,61
406 FPPB 08 31/10/2023 31/10/2023 12/01/2024 12/12 24 216 3,5 B 176,0 0,68 0,00 7,1676 2 297,22
407 FPPL 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1481 3,5 B 176,0 0,64 0,00 7,1676 2 315,79
408 FPPL 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1120 3,5 B 176,0 1,61 0,00 7,1676 2 125,53
409 FPPL 15 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1135 3,5 B 176,0 2,92 0,00 7,1676 2 69,21
410 FPPL 39 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1187 3,5 B 176,0 1,4 0,00 7,1676 2 144,36
411 FPPL 62 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 994 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
412 FPPL 83 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 993 3,5 B 176,0 0,12 0,00 7,1676 2 1684,23
413 FPPL 60 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1175 3,5 B 176,0 0,64 0,00 7,1676 2 315,79
414 FPPL 38 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1160 3,5 B 176,0 1,68 0,00 7,1676 2 120,30
415 FPPL 61 31/10/2023 31/10/2023 31/10/2023 12/01/2024 12/12/12 36 1344 3,5 B 176,0 0,88 0,00 7,1676 2 229,67
416 FPPL 25 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1529 3,5 B 176,0 0,78 0,00 7,1676 2 259,11
417 FPPL 03 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1399 3,5 B 176,0 0,69 0,00 7,1676 2 292,91
418 FPPB 04 31/10/2023 31/10/2023 13/01/2024 12/12 24 233 3,5 B 176,0 1,32 0,00 7,1676 2 153,11
419 FPPL 04 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1311 3,5 B 176,0 1,18 0,00 7,1676 2 171,28
420 FPPL 05 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1347 3,5 B 176,0 1,1 0,00 7,1676 2 183,73
421 FPPL 28 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1555 3,5 B 176,0 1,41 0,00 7,1676 2 143,34
422 FPPL 27 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1098 3,5 B 176,0 0,75 0,00 7,1676 2 269,48
423 FPPL 50 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1926 3,5 B 176,0 0,95 0,00 7,1676 2 212,74
424 FPPL 107 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1050 3,5 B 176,0 1,19 0,00 7,1676 2 169,84
425 FPPL 85 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 910 3,5 B 176,0 1,61 0,00 7,1676 2 125,53
426 FPPL 86 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1344 3,5 B 176,0 0,69 0,00 7,1676 2 292,91
427 FPPB 39 31/10/2023 31/10/2023 13/01/2024 12/12 24 273 3,5 B 176,0 1,1 0,00 7,1676 2 183,73
428 FPPL 109 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1221 3,5 B 176,0 1,03 0,00 7,1676 2 196,22
429 FPPL 84 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1132 3,5 B 176,0 1,14 0,00 7,1676 2 177,29
430 FPPB 38 31/10/2023 31/10/2023 13/01/2024 12/12 24 173 3,5 B 176,0 3,56 0,00 7,1676 2 56,77

11
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
431 SBP 106
FPPL 74 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 980 3,5 B 176,0 1,13 0,00 7,1676 2 178,86
432 FPPL 108 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 893 3,5 B 176,0 1,38 0,00 7,1676 2 146,45
433 FPPB 06 31/10/2023 31/10/2023 13/01/2024 12/12 24 195 3,5 B 176,0 1,15 0,00 7,1676 2 175,75
434 FPPL 08 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 873 3,5 B 176,0 1,3 0,00 7,1676 2 155,47
435 FPPL 31 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1132 3,5 B 176,0 1,05 0,00 7,1676 2 192,48
436 FPPB 05 31/10/2023 31/10/2023 13/01/2024 12/12 24 195 3,5 B 176,0 1,04 0,00 7,1676 2 194,33
437 FPPL 06 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1108 3,5 B 176,0 1,19 0,00 7,1676 2 169,84
438 FPPL 07 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1021 3,5 B 176,0 1,29 0,00 7,1676 2 156,67
439 FPPL 29 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 845 3,5 B 176,0 1,55 0,00 7,1676 2 130,39
440 FPPL 30 31/10/2023 31/10/2023 31/10/2023 13/01/2024 12/12/12 36 1308 3,5 B 176,0 0,81 0,00 7,1676 2 249,52
441 FPPB 40 31/10/2023 31/10/2023 14/01/2024 12/12 24 212 3,5 B 176,0 1,34 0,00 7,1676 2 150,83
442 FPPL 110 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 995 3,5 B 176,0 1,2 0,00 7,1676 2 168,42
443 FPPL 87 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1011 3,5 B 176,0 1,36 0,00 7,1676 2 148,61
444 FPPL 88 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1094 3,5 B 176,0 1,4 0,00 7,1676 2 144,36
445 FPPL 111 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 943 3,5 B 176,0 1,39 0,00 7,1676 2 145,40
446 FPPL 52 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1047 3,5 B 176,0 1,58 0,00 7,1676 2 127,92
447 FPPL 76 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1277 3,5 B 176,0 0,73 0,00 7,1676 2 276,86
448 FPPL 53 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1233 3,5 B 176,0 1,01 0,00 7,1676 2 200,11
449 FPPL 75 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1080 3,5 B 176,0 0,91 0,00 7,1676 2 222,10
450 FPPL 74 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1202 3,5 B 176,0 0,72 0,00 7,1676 2 280,70
451 FPPL 26 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1440 3,5 B 176,0 1,06 0,00 7,1676 2 190,67
452 FPPL 49 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1026 3,5 B 176,0 1,16 0,00 7,1676 2 174,23
453 FPPL 73 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1314 3,5 B 176,0 0,87 0,00 7,1676 2 232,31
454 FPPL 73 31/10/2023 31/10/2023 31/10/2023 14/01/2024 12/12/12 36 1272 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
455 FPPL 71 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 1422 3,5 B 176,0 1,14 0,00 7,1676 2 177,29
456 FPPL 47 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 1310 3,5 B 176,0 1,31 0,00 7,1676 2 154,28
457 FPPL 70 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 1233 3,5 B 176,0 1,11 0,00 7,1676 2 182,08
458 FPPB 54 31/10/2023 31/10/2023 15/01/2024 12/12 24 226 3,5 B 176,0 2,61 0,00 7,1676 2 77,44
459 FPPB 22 31/10/2023 31/10/2023 15/01/2024 12/12 24 182 3,5 B 176,0 2,91 0,00 7,1676 2 69,45
460 FPPL 77 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 1105 3,5 B 176,0 1,07 0,00 7,1676 2 188,89
461 FPPL 55 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 1404 3,5 B 176,0 0,81 0,00 7,1676 2 249,52
462 FPPB 27 31/10/2023 31/10/2023 15/01/2024 12/12 24 151 3,5 B 176,0 2,34 0,00 7,1676 2 86,37
463 FPPB 41 31/10/2023 31/10/2023 15/01/2024 12/12 24 151 3,5 B 176,0 2,75 0,00 7,1676 2 73,49
464 FPPL 55 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 1404 3,5 B 176,0 0,81 0,00 7,1676 2 249,52
465 FPPL 112 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 843 3,5 B 176,0 8,8 0,00 7,1676 2 22,97
466 FPPL 89 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 1025 3,5 B 176,0 1 0,00 7,1676 2 202,11
467 FPPL 113 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 736 3,5 B 176,0 1,5 0,00 7,1676 2 134,74
468 FPPL 90 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 758 3,5 B 176,0 1,73 0,00 7,1676 2 116,83
469 FPPB 26 31/10/2023 31/10/2023 15/01/2024 12/12 24 204 3,5 B 176,0 2,75 0,00 7,1676 2 73,49
470 FPPB 42 31/10/2023 31/10/2023 15/01/2024 12/12 24 128 3,5 B 176,0 3,28 0,00 7,1676 2 61,62

12
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
471 SBP 74
FPPB 25 31/10/2023 31/10/2023 15/01/2024 12/12 24 138 3,5 B 176,0 3,75 0,00 7,1676 2 53,90
472 FPPB 44 31/10/2023 31/10/2023 15/01/2024 12/12 24 161 3,5 B 176,0 3,06 0,00 7,1676 2 66,05
473 FPPL 92 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 748 3,5 B 176,0 1,66 0,00 7,1676 2 121,75
474 FPPL 96 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 1140 3,5 B 176,0 0,83 0,00 7,1676 2 243,50
475 FPPL 95 31/10/2023 31/10/2023 31/10/2023 15/01/2024 12/12/12 36 1153 3,5 B 176,0 0,48 0,00 7,1676 2 421,06
476 FPPB 29 31/10/2023 31/10/2023 24/01/2024 12/12 24 281 3,5 B 176,0 2,37 0,00 7,1676 2 85,28
477 FPPL 93 31/10/2023 31/10/2023 31/10/2023 24/01/2024 12/12/12 36 1439 3,5 B 176,0 0,98 0,00 7,1676 2 206,23
478 FPPL 94 31/10/2023 31/10/2023 31/10/2023 24/01/2024 12/12/12 36 1170 3,5 B 176,0 1,17 0,00 7,1676 2 172,74
479 FPPB 28 31/10/2023 31/10/2023 24/01/2024 12/12 24 228 3,5 B 176,0 3,76 0,00 7,1676 2 53,75
480 FPPL 78 31/10/2023 31/10/2023 31/10/2023 24/01/2024 12/12/12 36 1453 3,5 B 176,0 0,79 0,00 7,1676 2 255,83
481 FPPL 56 31/10/2023 31/10/2023 31/10/2023 24/01/2024 12/12/12 36 1272 3,5 B 176,0 0,95 0,00 7,1676 2 212,74
482 FPPL 79 31/10/2023 31/10/2023 31/10/2023 24/01/2024 12/12/12 36 1875 3,5 B 176,0 0,59 0,00 7,1676 2 342,55
483 FPPL 57 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1700 3,5 B 176,0 0,83 0,00 7,1676 2 243,50
484 FPPL 80 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1669 3,5 B 176,0 0,2 0,00 7,1676 2 1010,54
485 FPPL 81 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1802 3,5 B 176,0 0,14 0,00 7,1676 2 1443,62
486 FPPL 82 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1375 3,5 B 176,0 0,23 0,00 7,1676 2 878,73
487 FPPL 59 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1710 3,5 B 176,0 0,9 0,00 7,1676 2 224,56
488 FPPL 58 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1444 3,5 B 176,0 0,48 0,00 7,1676 2 421,06
489 FPPL 95 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1626 3,5 B 176,0 0,89 0,00 7,1676 2 227,09
490 FPPL 98 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1757 3,5 B 176,0 0,76 0,00 7,1676 2 265,93
491 FPPL 97 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1578 3,5 B 176,0 0,94 0,00 7,1676 2 215,01
492 FPPL 96 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1868 3,5 B 176,0 0,85 0,00 7,1676 2 237,77
493 FPPB 31 31/10/2023 31/10/2023 25/01/2024 12/12 24 239 3,5 B 176,0 0,85 2,41 7,1676 2 62,00
494 FPPB 30 31/10/2023 31/10/2023 25/01/2024 12/12 24 249 3,5 B 176,0 1,55 2,41 7,1676 2 51,04
495 FPPL 91 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 753 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
496 FPPL 115 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1209 3,5 B 176,0 1,71 0,00 7,1676 2 118,19
497 FPPL 115 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1329 3,5 B 176,0 1,64 0,00 7,1676 2 123,24
498 FPPB 43 31/10/2023 31/10/2023 25/01/2024 12/12 24 278 3,5 B 176,0 3,41 0,00 7,1676 2 59,27
499 SC 1 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 941 3,5 B 176,0 1,74 0,00 7,1676 2 116,15
500 SC 2 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 1058 3,5 B 176,0 1,56 0,00 7,1676 2 129,56
501 SC 2 31/10/2023 31/10/2023 31/10/2023 25/01/2024 12/12/12 36 811 3,5 B 176,0 1,36 0,00 7,1676 2 148,61
502 FPPL 103 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 787 3,5 B 176,0 0,69 0,00 7,1676 2 292,91
503 FPPL 102 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 861 3,5 B 176,0 0,88 0,00 7,1676 2 229,67
504 FPPL 104 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 945 3,5 B 176,0 0,74 0,00 7,1676 2 273,12
505 SC 4 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 882 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
506 SC 5 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 597 3,5 B 176,0 4,66 0,00 7,1676 2 43,37
507 SC 6 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 747 3,5 B 176,0 1,28 0,00 7,1676 2 157,90
508 SC 7 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 808 3,5 B 176,0 1,53 0,00 7,1676 2 132,10
509 SC 8 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 606 3,5 B 176,0 2,5 0,00 7,1676 2 80,84
510 SC 9 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 1021 3,5 B 176,0 2,53 0,00 7,1676 2 79,88

13
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
511 SBP 74
SC 10 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 693 3,5 B 176,0 1,84 0,00 7,1676 2 109,84
512 RMPL 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 1915 3,5 B 176,0 0,63 0,00 7,1676 2 320,81
513 RMPL 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 1271 3,5 B 176,0 1,18 0,00 7,1676 2 171,28
514 RMPL 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 1510 3,5 B 176,0 1,34 0,00 7,1676 2 150,83
515 RMPL 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 1685 3,5 B 176,0 0,85 0,00 7,1676 2 237,77
516 RMPL 31/10/2023 31/10/2023 31/10/2023 26/01/2024 12/12/12 36 1203 3,5 B 176,0 1,19 0,00 7,1676 2 169,84
517 RMPB 31/10/2023 31/10/2023 26/01/2024 12/12 24 262 3,5 B 176,0 3,35 0,00 7,1676 2 60,33
518 RMPB 31/10/2023 31/10/2023 26/01/2024 12/12 24 251 3,5 B 176,0 1,49 0,00 7,1676 2 135,64
519 RMPB 31/10/2023 31/10/2023 26/01/2024 12/12 24 448 3,5 B 176,0 1,11 0,00 7,1676 2 182,08
520 RMPB 31/10/2023 31/10/2023 26/01/2024 12/12 24 402 3,5 B 176,0 1,71 0,00 7,1676 2 118,19
521 FPPB 34 31/10/2023 31/10/2023 27/01/2024 12/12 24 365 3,5 B 176,0 0,75 0,00 7,1676 2 269,48
522 FPPB 33 31/10/2023 31/10/2023 27/01/2024 12/12 24 372 3,5 B 176,0 0,84 0,00 7,1676 2 240,60
523 FPPB 33 31/10/2023 31/10/2023 27/01/2024 12/12 24 353 3,5 B 176,0 1,13 0,00 7,1676 2 178,86
524 FPPL 100 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 1467 3,5 B 176,0 0,74 0,00 7,1676 2 273,12
525 FPPL 101 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 1464 3,5 B 176,0 1,03 0,00 7,1676 2 196,22
526 FPPB 35 31/10/2023 31/10/2023 27/01/2024 12/12 24 1575 3,5 B 176,0 0,54 0,00 7,1676 2 374,27
527 FPPL 104 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 1256 3,5 B 176,0 1 0,00 7,1676 2 202,11
528 FPPB 36 31/10/2023 31/10/2023 27/01/2024 12/12 24 1575 3,5 B 176,0 0,54 0,00 7,1676 2 374,27
529 FPPL 105 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 1269 3,5 B 176,0 0,53 0,00 7,1676 2 381,33
530 FPPB 37 31/10/2023 31/10/2023 27/01/2024 12/12 24 129 3,5 B 176,0 2,21 0,00 7,1676 2 91,45
531 RMPB 31/10/2023 31/10/2023 27/01/2024 12/12/12 24 588 3,5 B 176,0 1,1 0,00 7,1676 2 183,73
532 RMPL 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 1793 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
533 RMPL 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 1573 3,5 B 176,0 1,23 0,00 7,1676 2 164,31
534 RMPB 31/10/2023 31/10/2023 27/01/2024 12/12 24 374 3,5 B 176,0 2,75 0,00 7,1676 2 73,49
535 RMPL 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 2395 3,5 B 176,0 0,83 0,00 7,1676 2 243,50
536 RMPL 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 779 3,5 B 176,0 1,14 0,00 7,1676 2 177,29
537 RMPL 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 1189 3,5 B 176,0 1,11 0,00 7,1676 2 182,08
538 RMPB 31/10/2023 31/10/2023 27/01/2024 12/12 24 377 3,5 B 176,0 1,12 0,00 7,1676 2 180,45
539 RMPL 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 862 3,5 B 176,0 2,53 0,00 7,1676 2 79,88
540 RMPL 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 1556 3,5 B 176,0 0,81 0,00 7,1676 2 249,52
541 RMPL 130 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 828 3,5 B 176,0 1,31 0,00 7,1676 2 154,28
542 RMPB 01 31/10/2023 31/10/2023 27/01/2024 12/12 24 225 3,5 B 176,0 4,01 0,00 7,1676 2 50,40
543 RMPL 115 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 902 3,5 B 176,0 3,41 0,00 7,1676 2 59,27
544 RMPB 02 31/10/2023 31/10/2023 27/01/2024 12/12 24 206 3,5 B 176,0 1,52 0,00 7,1676 2 132,97
545 RMPB 42 31/10/2023 31/10/2023 27/01/2024 12/12 24 287 3,5 B 176,0 2,45 0,00 7,1676 2 82,49
546 RMPL 136 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 1046 3,5 B 176,0 0,85 0,00 7,1676 2 237,77
547 RMPB 41 31/10/2023 31/10/2023 27/01/2024 12/12 24 341 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
548 RMPL 114 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 990 3,5 B 176,0 1,39 0,00 7,1676 2 145,40
549 RMPL 137 31/10/2023 31/10/2023 31/10/2023 27/01/2024 12/12/12 36 953 3,5 B 176,0 1,65 0,00 7,1676 2 122,49
550 RMPL 134 31/10/2023 31/10/2023 31/10/2023 28/01/2024 12/12/12 36 774 3,5 B 176,0 2,46 0,00 7,1676 2 82,16

14
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
551 SBP 74
RMPB 40 31/10/2023 31/10/2023 28/01/2024 12/12 24 335 3,5 B 176,0 2 0,00 7,1676 2 101,05
552 RMPL 119 31/10/2023 31/10/2023 31/10/2023 28/01/2024 12/12/12 36 906 3,5 B 176,0 1,77 0,00 7,1676 2 114,18
553 RMPL 135 31/10/2023 31/10/2023 31/10/2023 28/01/2024 12/12/12 36 928 3,5 B 176,0 1,7 0,00 7,1676 2 118,89
554 RMPL 112 31/10/2023 31/10/2023 31/10/2023 28/01/2024 12/12/12 36 973 3,5 B 176,0 1,15 0,00 7,1676 2 175,75
555 RMPL 111 31/10/2023 31/10/2023 31/10/2023 28/01/2024 12/12/12 36 967 3,5 B 176,0 1,36 0,00 7,1676 2 148,61
556 RMPB 31/10/2023 31/10/2023 28/01/2024 12/12 24 573 3,5 B 176,0 1,31 0,00 7,1676 2 154,28
557 RMPL 31/10/2023 31/10/2023 31/10/2023 28/01/2024 12/12/12 36 2092 3,5 B 176,0 0,92 0,00 7,1676 2 219,68
558 RMPL 31/10/2023 31/10/2023 31/10/2023 28/01/2024 12/12/12 36 1594 3,5 B 176,0 1,02 0,00 7,1676 2 198,14
559 RMPL 31/10/2023 31/10/2023 31/10/2023 28/01/2024 12/12/12 36 1802 3,5 B 176,0 1,14 0,00 7,1676 2 177,29
560 RMPL 31/10/2023 31/10/2023 31/10/2023 28/01/2024 12/12/12 36 1435 3,5 B 176,0 1,13 0,00 7,1676 2 178,86
561 RMPB 39 31/10/2023 31/10/2023 29/01/2024 12/12 24 309 3,5 B 176,0 1,02 0,00 7,1676 2 198,14
562 RMPL 133 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 966 3,5 B 176,0 1,21 0,00 7,1676 2 167,03
563 RMPL 120 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 631 3,5 B 176,0 3,86 0,00 7,1676 2 52,36
564 RMPB 38 31/10/2023 31/10/2023 29/01/2024 12/12 24 199 3,5 B 176,0 2,32 0,00 7,1676 2 87,12
565 RMPL 109 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 860 3,5 B 176,0 1,09 0,00 7,1676 2 185,42
566 RMPL 131 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 712 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
567 RMPL 132 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 886 3,5 B 176,0 1,38 0,00 7,1676 2 146,45
568 RMPB 36 31/10/2023 31/10/2023 29/01/2024 12/12 24 273 3,5 B 176,0 1,69 0,00 7,1676 2 119,59
569 RMPL 130 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 867 3,5 B 176,0 1,41 0,00 7,1676 2 143,34
570 RMPB 36 31/10/2023 31/10/2023 29/01/2024 12/12 24 202 3,5 B 176,0 3,25 0,00 7,1676 2 62,19
571 RMPL 107 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 811 3,5 B 176,0 1,58 0,00 7,1676 2 127,92
572 RMPL 108 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 883 3,5 B 176,0 1,91 0,00 7,1676 2 105,82
573 RMPL 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 2250 3,5 B 176,0 0,69 0,00 7,1676 2 292,91
574 RMPL 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 2295 3,5 B 176,0 1,14 0,00 7,1676 2 177,29
575 RMPB 31/10/2023 31/10/2023 29/01/2024 12/12 24 536 3,5 B 176,0 2,83 0,00 7,1676 2 71,42
576 RMPL 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 2159 3,5 B 176,0 0,58 0,00 7,1676 2 348,46
577 RMPL 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 1925 3,5 B 176,0 0,99 0,00 7,1676 2 204,15
578 RMPL 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 1680 3,5 B 176,0 0,94 0,00 7,1676 2 215,01
579 RMPL 31/10/2023 31/10/2023 31/10/2023 29/01/2024 12/12/12 36 1303 3,5 B 176,0 1,58 0,00 7,1676 2 127,92
580 PPF 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 749 3,5 B 176,0 1,41 0,00 7,1676 2 143,34
581 PPF 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 738 3,5 B 176,0 2,44 0,00 7,1676 2 82,83
582 RMPL 58 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 1087 3,5 B 176,0 1,47 0,00 7,1676 2 137,49
583 RMPL 103 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 1121 3,5 B 176,0 1,31 0,00 7,1676 2 154,28
584 RMPL 128 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 804 3,5 B 176,0 1,17 0,00 7,1676 2 172,74
585 RMPL 129 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 738 3,5 B 176,0 1,22 0,00 7,1676 2 165,66
586 RMPB 35 31/10/2023 31/10/2023 30/01/2024 12/12 24 190 3,5 B 176,0 2,25 0,00 7,1676 2 89,83
587 RMPB 34 31/10/2023 31/10/2023 30/01/2024 12/12 24 231 3,5 B 176,0 0,79 0,00 7,1676 2 255,83
588 RMPL 127 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 946 3,5 B 176,0 1,48 0,00 7,1676 2 136,56
589 RMPL 126 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 791 3,5 B 176,0 1,49 0,00 7,1676 2 135,64
590 RMPL 104 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 786 3,5 B 176,0 2,01 0,00 7,1676 2 100,55

15
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
591 SBP 74
RMPL 106 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 1028 3,5 B 176,0 1,11 0,00 7,1676 2 182,08
592 RMPL 105 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 1052 3,5 B 176,0 1,09 0,00 7,1676 2 185,42
593 RMPL 35 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 909 3,5 B 176,0 2,03 0,00 7,1676 2 99,56
594 RMPL 81 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 1041 3,5 B 176,0 1,47 0,00 7,1676 2 137,49
595 RMPL 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 2086 3,5 B 176,0 0,71 0,00 7,1676 2 284,66
596 RMPL 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 1907 3,5 B 176,0 0,79 0,00 7,1676 2 255,83
597 RMPB 31/10/2023 31/10/2023 30/01/2024 12/12 24 364 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
598 RMPL 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 2629 3,5 B 176,0 0,51 0,00 7,1676 2 396,29
599 RMPL 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 2133 3,5 B 176,0 0,8 0,00 7,1676 2 252,63
600 RMPL 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 1622 3,5 B 176,0 1,21 0,00 7,1676 2 167,03
601 RMPL 31/10/2023 31/10/2023 31/10/2023 30/01/2024 12/12/12 36 1420 3,5 B 176,0 0,89 0,00 7,1676 2 227,09
602 RMPB 31/10/2023 31/10/2023 30/01/2024 12/12 24 348 3,5 B 176,0 2,45 0,00 7,1676 2 82,49
603 RMPL 78 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1102 3,5 B 176,0 1,31 0,00 7,1676 2 154,28
604 RMPL 84 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 913 3,5 B 176,0 1,66 0,00 7,1676 2 121,75
605 RMPL 101 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1401 3,5 B 176,0 1,15 0,00 7,1676 2 175,75
606 RMPL 60 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1253 3,5 B 176,0 1,11 0,00 7,1676 2 182,08
607 RMPL 124 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 823 3,5 B 176,0 1,5 0,00 7,1676 2 134,74
608 RMPB 33 31/10/2023 31/10/2023 31/01/2024 12/12 24 292 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
609 RMPL 37 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1152 3,5 B 176,0 1,4 0,00 7,1676 2 144,36
610 RMPB 32 31/10/2023 31/10/2023 31/01/2024 12/12 24 330 3,5 B 176,0 1,75 0,00 7,1676 2 115,49
611 RMPL 79 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1193 3,5 B 176,0 1,55 0,00 7,1676 2 130,39
612 RMPL 83 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 972 3,5 B 176,0 1,84 0,00 7,1676 2 109,84
613 RMPL 102 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 646 3,5 B 176,0 2,05 0,00 7,1676 2 98,59
614 RMPL 59 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 876 3,5 B 176,0 2,15 0,00 7,1676 2 94,00
615 RMPL 125 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 979 3,5 B 176,0 1,67 0,00 7,1676 2 121,02
616 RMPL 36 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1009 3,5 B 176,0 1,62 0,00 7,1676 2 124,76
617 RMPL 82 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 946 3,5 B 176,0 1,32 0,00 7,1676 2 153,11
618 RMPL 80 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1315 3,5 B 176,0 1,15 0,00 7,1676 2 175,75
619 RMPL 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1704 3,5 B 176,0 0,84 0,00 7,1676 2 240,60
620 RMPL 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1453 3,5 B 176,0 1,01 0,00 7,1676 2 200,11
621 RMPL 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1594 3,5 B 176,0 1,05 0,00 7,1676 2 192,48
622 RMPL 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 2593 3,5 B 176,0 1,08 0,00 7,1676 2 187,14
623 RMPL 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 2050 3,5 B 176,0 0,74 0,00 7,1676 2 273,12
624 RMPL 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1637 3,5 B 176,0 0,99 0,00 7,1676 2 204,15
625 RMPL 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1409 3,5 B 176,0 1,11 0,00 7,1676 2 182,08
626 RMPL 31/10/2023 31/10/2023 31/10/2023 31/01/2024 12/12/12 36 1438 3,5 B 176,0 1,2 0,00 7,1676 2 168,42
627 RMPL 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 1221 3,5 B 176,0 1,47 0,00 7,1676 2 137,49
628 RMPL 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 1232 3,5 B 176,0 0,67 0,00 7,1676 2 301,65
629 RMPL 99 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 1420 3,5 B 176,0 1,21 0,00 7,1676 2 167,03
630 RMPL 62 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 1106 3,5 B 176,0 1,25 0,00 7,1676 2 161,69

16
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
631 SBP 74
RMPL 122 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 1385 3,5 B 176,0 0,75 0,00 7,1676 2 269,48
632 RMPL 39 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 993 3,5 B 176,0 1,24 0,00 7,1676 2 162,99
633 RMPL 77 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 850 3,5 B 176,0 1,8 0,00 7,1676 2 112,28
634 RMPL 40 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 718 3,5 B 176,0 3,125 0,00 7,1676 2 64,67
635 RMPL 86 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 887 3,5 B 176,0 1,58 0,00 7,1676 2 127,92
636 RMPB 31 31/10/2023 31/10/2023 01/02/2024 12/12 24 353 3,5 B 176,0 1,23 0,00 7,1676 2 164,31
637 RMPL 86 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 993 3,5 B 176,0 1,1 0,00 7,1676 2 183,73
638 RMPL 38 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 1152 3,5 B 176,0 1,36 0,00 7,1676 2 148,61
639 RMPL 61 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 1123 3,5 B 176,0 1,4 0,00 7,1676 2 144,36
640 RMPL 123 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 1186 3,5 B 176,0 1,11 0,00 7,1676 2 182,08
641 RMPL 100 31/10/2023 31/10/2023 31/10/2023 01/02/2024 12/12/12 36 634 3,5 B 176,0 2,22 0,00 7,1676 2 91,04
642 RMPL 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 2589 3,5 B 176,0 0,38 0,00 7,1676 2 531,86
643 RMPL 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1834 3,5 B 176,0 0,95 0,00 7,1676 2 212,74
644 RMPL 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1866 3,5 B 176,0 0,56 0,00 7,1676 2 360,91
645 RMPL 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1499 3,5 B 176,0 1,28 0,00 7,1676 2 157,90
646 RMPL 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1247 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
647 RMPL 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1291 3,5 B 176,0 1,44 0,00 7,1676 2 140,35
648 RMPL 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1148 3,5 B 176,0 1,12 0,00 7,1676 2 180,45
649 RMPL 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1141 3,5 B 176,0 2,35 0,00 7,1676 2 86,00
650 RMPL 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1122 3,5 B 176,0 1,89 0,00 7,1676 2 106,94
651 RMPL 97 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1640 3,5 B 176,0 1,23 0,00 7,1676 2 164,31
652 RMPL 88 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 981 3,5 B 176,0 0,98 0,00 7,1676 2 206,23
653 RMPL 98 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1576 3,5 B 176,0 0,89 0,00 7,1676 2 227,09
654 RMPL 64 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 996 3,5 B 176,0 0,94 0,00 7,1676 2 215,01
655 RMPL 41 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 915 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
656 RMPL 121 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1343 3,5 B 176,0 1,02 0,00 7,1676 2 198,14
657 RMPL 87 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 804 3,5 B 176,0 1,49 0,00 7,1676 2 135,64
658 RMPL 63 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 827 3,5 B 176,0 1,78 0,00 7,1676 2 113,54
659 RMPL 63 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 947 3,5 B 176,0 1,19 0,00 7,1676 2 169,84
660 RMPB 30 31/10/2023 31/10/2023 02/02/2024 12/12 24 331 3,5 B 176,0 1,69 0,00 7,1676 2 119,59
661 RMPL 75 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1145 3,5 B 176,0 1,3 0,00 7,1676 2 155,47
662 RMPL 42 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1223 3,5 B 176,0 0,99 0,00 7,1676 2 204,15
663 RMPL 120 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1064 3,5 B 176,0 0,81 0,00 7,1676 2 249,52
664 RMPL 65 31/10/2023 31/10/2023 31/10/2023 02/02/2024 12/12/12 36 1003 3,5 B 176,0 1,44 0,00 7,1676 2 140,35
665 RMPL 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 2524 3,5 B 176,0 0,15 0,00 7,1676 2 1347,38
666 RMPL 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 1666 3,5 B 176,0 1,05 0,00 7,1676 2 192,48
667 RMPL 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 1015 3,5 B 176,0 1,27 0,00 7,1676 2 159,14
668 RMPL 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 1517 3,5 B 176,0 1,2 0,00 7,1676 2 168,42
669 RMPL 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 1262 3,5 B 176,0 0,93 0,00 7,1676 2 217,32
670 RMPL 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 1126 3,5 B 176,0 1,15 0,00 7,1676 2 175,75

17
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
671 SBP 74
RMPL 91 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 1312 3,5 B 176,0 1,38 0,00 7,1676 2 146,45
672 RMPL 90 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 953 3,5 B 176,0 1,53 0,00 7,1676 2 132,10
673 RMPL 119 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 1413 3,5 B 176,0 1,02 0,00 7,1676 2 198,14
674 RMPL 66 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 745 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
675 RMPL 67 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 916 3,5 B 176,0 2,43 0,00 7,1676 2 83,17
676 RMPB 28 31/10/2023 31/10/2023 03/02/2024 12/12 24 386 3,5 B 176,0 1,15 0,00 7,1676 2 175,75
677 RMPL 45 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 639 3,5 B 176,0 1,9 0,00 7,1676 2 106,37
678 RMPL 73 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 1103 3,5 B 176,0 0,9 0,00 7,1676 2 224,56
679 RMPL 96 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 978 3,5 B 176,0 0,91 0,00 7,1676 2 222,10
680 RMPL 44 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 481 3,5 B 176,0 1,3 0,00 7,1676 2 155,47
681 RMPL 89 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 856 3,5 B 176,0 1,18 0,00 7,1676 2 171,28
682 RMPL 74 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 1031 3,5 B 176,0 1,78 0,00 7,1676 2 113,54
683 RMPB 29 31/10/2023 31/10/2023 03/02/2024 12/12 24 322 3,5 B 176,0 1,95 0,00 7,1676 2 103,64
684 RMPL 43 31/10/2023 31/10/2023 31/10/2023 03/02/2024 12/12/12 36 1033 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
685 RMPL 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 884 3,5 B 176,0 27,5 0,00 7,1676 2 7,35
686 RMPL 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 725 3,5 B 176,0 1,55 0,00 7,1676 2 130,39
687 RMPL 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 730 3,5 B 176,0 1,9 0,00 7,1676 2 106,37
688 RMPL 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 996 3,5 B 176,0 1,15 0,00 7,1676 2 175,75
689 RMPL 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 524 3,5 B 176,0 3,78 0,00 7,1676 2 53,47
690 RMPL 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 1870 3,5 B 176,0 0,72 0,00 7,1676 2 280,70
691 RMPL 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 1275 3,5 B 176,0 1,07 0,00 7,1676 2 188,89
692 RMPL 92 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 689 3,5 B 176,0 1,42 0,00 7,1676 2 142,33
693 RMPL 118 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 690 3,5 B 176,0 3,57 0,00 7,1676 2 56,61
694 RMPL 68 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 951 3,5 B 176,0 1,61 0,00 7,1676 2 125,53
695 RMPL 46 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 739 3,5 B 176,0 1,07 0,00 7,1676 2 188,89
696 RMPL 72 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 789 3,5 B 176,0 1,12 0,00 7,1676 2 180,45
697 RMPL 95 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 1208 3,5 B 176,0 0,65 0,00 7,1676 2 310,93
698 RMPL 69 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 1046 3,5 B 176,0 1,42 0,00 7,1676 2 142,33
699 RMPL 23 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 480 3,5 B 176,0 2,38 0,00 7,1676 2 84,92
700 RMPL 94 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 1140 3,5 B 176,0 1,08 0,00 7,1676 2 187,14
701 RMPL 117 31/10/2023 31/10/2023 31/10/2023 04/02/2024 12/12/12 36 1391 3,5 B 176,0 1,16 0,00 7,1676 2 174,23
702 RMPB 06 31/10/2023 31/10/2023 04/02/2024 12/12 24 233 3,5 B 176,0 5,75 0,00 7,1676 2 35,15
703 RMPB 03 31/10/2023 31/10/2023 04/02/2024 12/12 24 249 3,5 B 176,0 2,23 0,00 7,1676 2 90,63
704 RMPB 04 31/10/2023 31/10/2023 04/02/2024 12/12 24 414 3,5 B 176,0 7,13 0,00 7,1676 2 28,35
705 RMPB 05 31/10/2023 31/10/2023 04/02/2024 12/12 24 169 3,5 B 176,0 3,28 0,00 7,1676 2 61,62
706 RMPL 17 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 787 3,5 B 176,0 1,38 0,00 7,1676 2 146,45
707 RMPL 18 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 960 3,5 B 176,0 1,39 0,00 7,1676 2 145,40
708 RMPL 70 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 1645 3,5 B 176,0 0,31 0,00 7,1676 2 651,96
709 RMPL 19 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 656 3,5 B 176,0 3,78 0,00 7,1676 2 53,47
710 RMPL 93 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 701 3,5 B 176,0 1,49 0,00 7,1676 2 135,64

18
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
711 SBP 74
RMPL 71 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 926 3,5 B 176,0 1,48 0,00 7,1676 2 136,56
712 RMPL 116 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 744 3,5 B 176,0 2,44 0,00 7,1676 2 82,83
713 RMPL 20 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 1080 3,5 B 176,0 0,89 0,00 7,1676 2 227,09
714 RMPL 21 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 1294 3,5 B 176,0 0,88 0,00 7,1676 2 229,67
715 RMPL 22 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 613 3,5 B 176,0 2,17 0,00 7,1676 2 93,14
716 RMPL 16 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 1139 3,5 B 176,0 1,79 0,00 7,1676 2 112,91
717 RMPB 07 31/10/2023 31/10/2023 05/02/2024 12/12 24 335 3,5 B 176,0 3,78 0,00 7,1676 2 53,47
718 RMPB 27 31/10/2023 31/10/2023 05/02/2024 12/12 24 227 3,5 B 176,0 1,39 0,00 7,1676 2 145,40
719 RMPB 08 31/10/2023 31/10/2023 05/02/2024 12/12 24 407 3,5 B 176,0 1,47 0,00 7,1676 2 137,49
720 RMPB 09 31/10/2023 31/10/2023 05/02/2024 12/12 24 331 3,5 B 176,0 2,3 0,00 7,1676 2 87,87
721 RMPB 10 31/10/2023 31/10/2023 05/02/2024 12/12 24 303 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
722 RMPB 31/10/2023 31/10/2023 05/02/2024 12/12 24 247 3,5 B 176,0 2,04 0,00 7,1676 2 99,07
723 RMPB 31/10/2023 31/10/2023 05/02/2024 12/12 24 217 3,5 B 176,0 3,95 0,00 7,1676 2 51,17
724 RMPB 31/10/2023 31/10/2023 05/02/2024 12/12 24 247 3,5 B 176,0 3,88 0,00 7,1676 2 52,09
725 RMPB 31/10/2023 31/10/2023 05/02/2024 12/12 24 205 3,5 B 176,0 4 0,00 7,1676 2 50,53
726 RMPB 31/10/2023 31/10/2023 05/02/2024 12/12 24 370 3,5 B 176,0 2,07 0,00 7,1676 2 97,64
727 RMPL 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 964 3,5 B 176,0 1,71 0,00 7,1676 2 118,19
728 RMPL 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 644 3,5 B 176,0 1,76 0,00 7,1676 2 114,83
729 RMPL 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 1540 3,5 B 176,0 1,17 0,00 7,1676 2 172,74
730 RMPL 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 1338 3,5 B 176,0 1,12 0,00 7,1676 2 180,45
731 RMPL 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 787 3,5 B 176,0 1,98 0,00 7,1676 2 102,07
732 RMPL 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 924 3,5 B 176,0 2,09 0,00 7,1676 2 96,70
733 RMPL 31/10/2023 31/10/2023 31/10/2023 05/02/2024 12/12/12 36 1298 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
734 RMPL 11 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 1104 3,5 B 176,0 1,79 0,00 7,1676 2 112,91
735 RMPL 12 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 1052 3,5 B 176,0 2,92 0,00 7,1676 2 69,21
736 RMPL 13 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 899 3,5 B 176,0 3,01 0,00 7,1676 2 67,15
737 RMPL 14 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 1081 3,5 B 176,0 2,7 0,00 7,1676 2 74,85
738 RMPL 15 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 1181 3,5 B 176,0 1,8 0,00 7,1676 2 112,28
739 RMPB 11 31/10/2023 31/10/2023 06/02/2024 12/12 24 429 3,5 B 176,0 2,33 0,00 7,1676 2 86,74
740 RMPB 12 31/10/2023 31/10/2023 06/02/2024 12/12 24 382 3,5 B 176,0 2,03 0,00 7,1676 2 99,56
741 RMPB 13 31/10/2023 31/10/2023 06/02/2024 12/12 24 475 3,5 B 176,0 1,43 0,00 7,1676 2 141,33
742 RMPB 14 31/10/2023 31/10/2023 06/02/2024 12/12 24 329 3,5 B 176,0 1,87 0,00 7,1676 2 108,08
743 RMPB 15 31/10/2023 31/10/2023 06/02/2024 12/12 24 350 3,5 B 176,0 3,01 0,00 7,1676 2 67,15
744 RMPB 31/10/2023 31/10/2023 06/02/2024 12/12 24 564 3,5 B 176,0 1,19 0,00 7,1676 2 169,84
745 RMPB 31/10/2023 31/10/2023 06/02/2024 12/12 24 324 3,5 B 176,0 1,3 0,00 7,1676 2 155,47
746 RMPB 31/10/2023 31/10/2023 06/02/2024 12/12 24 349 3,5 B 176,0 2,46 0,00 7,1676 2 82,16
747 RMPB 31/10/2023 31/10/2023 06/02/2024 12/12 24 464 3,5 B 176,0 1,1 0,00 7,1676 2 183,73
748 RMPL 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 1118 3,5 B 176,0 1,16 0,00 7,1676 2 174,23
749 RMPL 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 629 3,5 B 176,0 2,75 0,00 7,1676 2 73,49
750 RMPL 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 745 3,5 B 176,0 5,2 0,00 7,1676 2 38,87

19
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
751 SBP
RMPL74 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 1312 3,5 B 176,0 0,98 0,00 7,1676 2 206,23
752 RMPL 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 1802 3,5 B 176,0 0,75 0,00 7,1676 2 269,48
753 RMPL 31/10/2023 31/10/2023 31/10/2023 06/02/2024 12/12/12 36 1190 3,5 B 176,0 1,04 0,00 7,1676 2 194,33
754 RMPL 34 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 799 3,5 B 176,0 2,91 0,00 7,1676 2 69,45
755 RMPL 57 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 435 3,5 B 176,0 3,62 0,00 7,1676 2 55,83
756 RMPL 10 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 975 3,5 B 176,0 2,68 0,00 7,1676 2 75,41
757 RMPL 56 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 936 3,5 B 176,0 2,45 0,00 7,1676 2 82,49
758 RMPL 33 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 1146 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
759 RMPL 55 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 836 3,5 B 176,0 1,68 0,00 7,1676 2 120,30
760 RMPL 32 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 908 3,5 B 176,0 2,1 0,00 7,1676 2 96,24
761 RMPL 54 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 958 3,5 B 176,0 1,86 0,00 7,1676 2 108,66
762 RMPL 9 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 834 3,5 B 176,0 1,5 0,00 7,1676 2 134,74
763 RMPL 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 1248 3,5 B 176,0 0,5 0,00 7,1676 2 404,21
764 RMPL 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 1434 3,5 B 176,0 1,37 0,00 7,1676 2 147,52
765 RMPL 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 1323 3,5 B 176,0 1,38 0,00 7,1676 2 146,45
766 RMPL 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 1322 3,5 B 176,0 1,53 0,00 7,1676 2 132,10
767 RMPL 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 1163 3,5 B 176,0 1,32 0,00 7,1676 2 153,11
768 RMPL 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 823 3,5 B 176,0 1,8 0,00 7,1676 2 112,28
769 RMPL 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 738 3,5 B 176,0 2,3 0,00 7,1676 2 87,87
770 RMPB 31/10/2023 31/10/2023 07/02/2024 12/12 24 468 3,5 B 176,0 1,4 0,00 7,1676 2 144,36
771 RMPL 31/10/2023 31/10/2023 31/10/2023 07/02/2024 12/12/12 36 621 3,5 B 176,0 1,95 0,00 7,1676 2 103,64
772 RMPB 31/10/2023 31/10/2023 07/02/2024 12/12 24 508 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
773 RMPL 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 1517 3,5 B 176,0 0,42 0,00 7,1676 2 481,21
774 RMPL 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 1060 3,5 B 176,0 1,83 0,00 7,1676 2 110,44
775 RMPL 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 1471 3,5 B 176,0 0,96 0,00 7,1676 2 210,53
776 RMPL 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 2014 3,5 B 176,0 0,65 0,00 7,1676 2 310,93
777 RMPL 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 1478 3,5 B 176,0 0,88 0,00 7,1676 2 229,67
778 RMPB 31/10/2023 31/10/2023 08/02/2024 12/12 24 499 3,5 B 176,0 2,06 0,00 7,1676 2 98,11
779 RMPL 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 1328 3,5 B 176,0 1,71 0,00 7,1676 2 118,19
780 RMPB 31/10/2023 31/10/2023 08/02/2024 12/12 24 285 3,5 B 176,0 2,45 0,00 7,1676 2 82,49
781 RMPB 31/10/2023 31/10/2023 08/02/2024 12/12 24 321 3,5 B 176,0 2,5 0,00 7,1676 2 80,84
782 RMPL 06 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 986 3,5 B 176,0 2,44 0,00 7,1676 2 82,83
783 RMPL 29 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 896 3,5 B 176,0 2,45 0,00 7,1676 2 82,49
784 RMPL 08 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 881 3,5 B 176,0 2,3 0,00 7,1676 2 87,87
785 RMPL 31 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 795 3,5 B 176,0 2,2 0,00 7,1676 2 91,87
786 RMPL 07 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 766 3,5 B 176,0 2,33 0,00 7,1676 2 86,74
787 RMPL 30 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 951 3,5 B 176,0 0,99 0,00 7,1676 2 204,15
788 RMPL 53 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 641 3,5 B 176,0 1,54 0,00 7,1676 2 131,24
789 RMPL 52 31/10/2023 31/10/2023 31/10/2023 08/02/2024 12/12/12 36 994 3,5 B 176,0 1,59 0,00 7,1676 2 127,11
790 RMPB 17 31/10/2023 31/10/2023 08/02/2024 12/12 24 348 3,5 B 176,0 2,38 0,00 7,1676 2 84,92

20
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
791 SBP 74
RMPB 16 31/10/2023 31/10/2023 08/02/2024 12/12 24 327 3,5 B 176,0 3,4 0,00 7,1676 2 59,44
792 RMPB 31/10/2023 31/10/2023 09/02/2024 12/12 24 205 3,5 B 176,0 4,86 0,00 7,1676 2 41,59
793 RMPB 31/10/2023 31/10/2023 09/02/2024 12/12 24 214 3,5 B 176,0 3,47 0,00 7,1676 2 58,24
794 RMPB 31/10/2023 31/10/2023 09/02/2024 12/12 24 322 3,5 B 176,0 4,2 0,00 7,1676 2 48,12
795 RMPB 31/10/2023 31/10/2023 09/02/2024 12/12 24 201 3,5 B 176,0 4,1 0,00 7,1676 2 49,29
796 RMPL 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 1190 3,5 B 176,0 1,9 0,00 7,1676 2 106,37
797 RMPL 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 1034 3,5 B 176,0 0,8 0,00 7,1676 2 252,63
798 RMPL 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 1595 3,5 B 176,0 1,02 0,00 7,1676 2 198,14
799 RMPL 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 1456 3,5 B 176,0 1,72 0,00 7,1676 2 117,50
800 RMPL 27 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 828 3,5 B 176,0 2,24 0,00 7,1676 2 90,23
801 RMPL 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 1395 3,5 B 176,0 0,64 0,00 7,1676 2 315,79
802 RMPL 50 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 919 3,5 B 176,0 1,3 0,00 7,1676 2 155,47
803 RMPL 04 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 878 3,5 B 176,0 2,66 0,00 7,1676 2 75,98
804 RMPL 28 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 1019 3,5 B 176,0 1,95 0,00 7,1676 2 103,64
805 RMPL 51 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 1012 3,5 B 176,0 1,49 0,00 7,1676 2 135,64
806 RMPL 05 31/10/2023 31/10/2023 31/10/2023 09/02/2024 12/12/12 36 816 3,5 B 176,0 1,74 0,00 7,1676 2 116,15
807 RMPB 19 31/10/2023 31/10/2023 09/02/2024 12/12 24 273 3,5 B 176,0 2,05 0,00 7,1676 2 98,59
808 RMPB 18 31/10/2023 31/10/2023 09/02/2024 12/12 24 368 3,5 B 176,0 2,05 0,00 7,1676 2 98,59
809 RMPL 31/10/2023 31/10/2023 31/10/2023 10/02/2024 12/12/12 36 1143 3,5 B 176,0 1,25 0,00 7,1676 2 161,69
810 RMPL 31/10/2023 31/10/2023 31/10/2023 10/02/2024 12/12/12 36 925 3,5 B 176,0 3 0,00 7,1676 2 67,37
811 RMPL 31/10/2023 31/10/2023 31/10/2023 10/02/2024 12/12/12 36 432 3,5 B 176,0 3,83 0,00 7,1676 2 52,77
812 RMPL 31/10/2023 31/10/2023 31/10/2023 10/02/2024 12/12/12 36 1019 3,5 B 176,0 1,43 0,00 7,1676 2 141,33
813 RMPL 31/10/2023 31/10/2023 31/10/2023 10/02/2024 12/12/12 36 1057 3,5 B 176,0 0,62 0,00 7,1676 2 325,98
814 RMPL 31/10/2023 31/10/2023 31/10/2023 10/02/2024 12/12/12 36 966 3,5 B 176,0 1,45 0,00 7,1676 2 139,38
815 RMPL 31/10/2023 31/10/2023 31/10/2023 10/02/2024 12/12/12 36 707 3,5 B 176,0 1,42 0,00 7,1676 2 142,33
816 RMPL 31/10/2023 31/10/2023 31/10/2023 10/02/2024 12/12/12 36 867 3,5 B 176,0 2,93 0,00 7,1676 2 68,98
817 RMPL 31/10/2023 31/10/2023 31/10/2023 11/02/2024 12/12/12 36 1182 3,5 B 176,0 3,12 0,00 7,1676 2 64,78
818 RMPL 31/10/2023 31/10/2023 31/10/2023 11/02/2024 12/12/12 36 1335 3,5 B 176,0 1,11 0,00 7,1676 2 182,08
819 RMPL 31/10/2023 31/10/2023 31/10/2023 11/02/2024 12/12/12 36 1547 3,5 B 176,0 1,39 0,00 7,1676 2 145,40
820 RMPL 31/10/2023 31/10/2023 31/10/2023 11/02/2024 12/12/12 36 880 3,5 B 176,0 0,88 0,00 7,1676 2 229,67
821 RMPL 31/10/2023 31/10/2023 31/10/2023 11/02/2024 12/12/12 36 1613 3,5 B 176,0 1,14 0,00 7,1676 2 177,29
822 RMPL 31/10/2023 31/10/2023 31/10/2023 11/02/2024 12/12/12 36 915 3,5 B 176,0 0,85 0,00 7,1676 2 237,77
823 RMPL 31/10/2023 31/10/2023 31/10/2023 11/02/2024 12/12/12 36 981 3,5 B 176,0 0,98 0,00 7,1676 2 206,23
824 RMPL 31/10/2023 31/10/2023 31/10/2023 11/02/2024 12/12/12 36 568 3,5 B 176,0 1,74 0,00 7,1676 2 116,15
825 RMPL 31/10/2023 31/10/2023 31/10/2023 12/02/2024 12/12/12 36 1150 3,5 B 176,0 0,71 0,00 7,1676 2 284,66
826 RMPL 31/10/2023 31/10/2023 31/10/2023 12/02/2024 12/12/12 36 1047 3,5 B 176,0 0,93 0,00 7,1676 2 217,32
827 RMPL 31/10/2023 31/10/2023 31/10/2023 12/02/2024 12/12/12 36 1093 3,5 B 176,0 0,75 0,00 7,1676 2 269,48
828 RMPL 31/10/2023 31/10/2023 31/10/2023 12/02/2024 12/12/12 36 1605 3,5 B 176,0 0,86 0,00 7,1676 2 235,01
829 RMPB 31/10/2023 31/10/2023 12/02/2024 12/12 24 400 3,5 B 176,0 1,51 0,00 7,1676 2 133,85
830 RMPL 31/10/2023 31/10/2023 31/10/2023 12/02/2024 12/12/12 36 1232 3,5 B 176,0 1,02 0,00 7,1676 2 198,14

21
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
831 SBP
RMPL74 31/10/2023 31/10/2023 31/10/2023 12/02/2024 12/12/12 36 1581 3,5 B 176,0 0,78 0,00 7,1676 2 259,11
832 RMPL 31/10/2023 31/10/2023 31/10/2023 12/02/2024 12/12/12 36 1581 3,5 B 176,0 3,12 0,00 7,1676 2 64,78
833 RMPB 31/10/2023 31/10/2023 12/02/2024 12/12 24 395 3,5 B 176,0 2,94 0,00 7,1676 2 68,74
834 RMPL 31/10/2023 31/10/2023 31/10/2023 13/02/2024 12/12/12 36 1081 3,5 B 176,0 1,2 0,00 7,1676 2 168,42
835 RMPB 31/10/2023 31/10/2023 13/02/2024 12/12 24 217 3,5 B 176,0 5,8 0,00 7,1676 2 34,85
836 RMPB 31/10/2023 31/10/2023 31/10/2023 13/02/2024 12/12/12 36 719 3,5 B 176,0 1,8 0,00 7,1676 2 112,28
837 RMPB 31/10/2023 31/10/2023 13/02/2024 12/12 24 313 3,5 B 176,0 3,2 0,00 7,1676 2 63,16
838 RMPL 31/10/2023 31/10/2023 31/10/2023 13/02/2024 12/12/12 36 1224 3,5 B 176,0 0,9 0,00 7,1676 2 224,56
839 RMPL 31/10/2023 31/10/2023 31/10/2023 13/02/2024 12/12/12 36 1139 3,5 B 176,0 0,7 0,00 7,1676 2 288,72
840 RMPB 31/10/2023 31/10/2023 13/02/2024 12/12 24 308 3,5 B 176,0 3,5 0,00 7,1676 2 57,74
841 RMPL 31/10/2023 31/10/2023 31/10/2023 13/02/2024 12/12/12 36 962 3,5 B 176,0 1 0,00 7,1676 2 202,11
842 RMPL 31/10/2023 31/10/2023 31/10/2023 13/02/2024 12/12/12 36 728 3,5 B 176,0 2,2 0,00 7,1676 2 91,87
843 RMPL 31/10/2023 31/10/2023 31/10/2023 15/02/2024 12/12/12 36 1310 3,5 B 176,0 0,9 0,00 7,1676 2 224,56
844 RMPL 31/10/2023 31/10/2023 31/10/2023 15/02/2024 12/12/12 36 988 3,5 B 176,0 0,8 0,00 7,1676 2 252,63
845 RMPB 31/10/2023 31/10/2023 15/02/2024 12/12 24 195 3,5 B 176,0 3,2 0,00 7,1676 2 63,16
846 RMPL 31/10/2023 31/10/2023 31/10/2023 15/02/2024 12/12/12 36 898 3,5 B 176,0 1,8 0,00 7,1676 2 112,28
847 RMPL 31/10/2023 31/10/2023 31/10/2023 15/02/2024 12/12/12 36 1053 3,5 B 176,0 0,7 0,00 7,1676 2 288,72
848 RMPL 31/10/2023 31/10/2023 31/10/2023 15/02/2024 12/12/12 36 1079 3,5 B 176,0 1,5 0,00 7,1676 2 134,74
849 OLP 31/10/2023 31/10/2023 31/10/2023 15/02/2024 12/12/12 36 765 3,5 B 176,0 2 0,00 7,1676 2 101,05
850 OLP 31/10/2023 31/10/2023 31/10/2023 15/02/2024 12/12/12 36 696 3,5 B 176,0 3,5 0,00 7,1676 2 57,74
851 RMPL 31/10/2023 31/10/2023 31/10/2023 15/02/2024 12/12/12 36 1411 3,5 B 176,0 1,08 0,00 7,1676 2 187,14
852 RMPL 31/10/2023 31/10/2023 31/10/2023 15/02/2024 12/12/12 36 1400 3,5 B 176,0 0,64 0,00 7,1676 2 315,79
853 RMPB 31/10/2023 31/10/2023 15/02/2024 12/12 24 233 3,5 B 176,0 1,93 0,00 7,1676 2 104,72
854 RMPB 31/10/2023 31/10/2023 15/02/2024 12/12 24 234 3,5 B 176,0 3,2 0,00 7,1676 2 63,16
855 RMPL 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 1474 3,5 B 176,0 0,73 0,00 7,1676 2 276,86
856 RMPL 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 1248 3,5 B 176,0 0,6 0,00 7,1676 2 336,85
857 RMPB 31/10/2023 31/10/2023 16/02/2024 12/12 24 228 3,5 B 176,0 2,78 0,00 7,1676 2 72,70
858 RMPB 31/10/2023 31/10/2023 16/02/2024 12/12 24 214 3,5 B 176,0 3,2 0,00 7,1676 2 63,16
859 RMPL 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 941 3,5 B 176,0 0,84 0,00 7,1676 2 240,60
860 RMPL 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 925 3,5 B 176,0 1 0,00 7,1676 2 202,11
861 RMPL 01 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 1057 3,5 B 176,0 1,39 0,00 7,1676 2 145,40
862 RMPL 24 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 607 3,5 B 176,0 2,03 0,00 7,1676 2 99,56
863 RMPL 25 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 937 3,5 B 176,0 1,61 0,00 7,1676 2 125,53
864 RMPL 02 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 977 3,5 B 176,0 1,43 0,00 7,1676 2 141,33
865 RMPL 40 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 796 3,5 B 176,0 1,13 0,00 7,1676 2 178,86
866 RMPB 21 31/10/2023 31/10/2023 16/02/2024 12/12 24 230 3,5 B 176,0 2,14 0,00 7,1676 2 94,44
867 RMPL 03 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 1000 3,5 B 176,0 1,34 0,00 7,1676 2 150,83
868 OLP 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 942 3,5 B 176,0 1,01 0,00 7,1676 2 200,11
869 OLP 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 847 3,5 B 176,0 0,93 0,00 7,1676 2 217,32
870 OLP 31/10/2023 31/10/2023 31/10/2023 16/02/2024 12/12/12 36 1178 3,5 B 176,0 1,17 0,00 7,1676 2 172,74

22
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
871 SBP
RMPL74 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 1672 3,5 B 176,0 0,48 0,00 7,1676 2 421,06
872 RMPL 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 1369 3,5 B 176,0 0,68 0,00 7,1676 2 297,22
873 RMPB 31/10/2023 31/10/2023 17/02/2024 12/12 24 279 3,5 B 176,0 2,22 0,00 7,1676 2 91,04
874 RMPL 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 1188 3,5 B 176,0 0,99 0,00 7,1676 2 204,15
875 RMPL 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 1409 3,5 B 176,0 1,01 0,00 7,1676 2 200,11
876 RMPB 31/10/2023 31/10/2023 17/02/2024 12/12 24 127 3,5 B 176,0 5,33 0,00 7,1676 2 37,92
877 RMPB 31/10/2023 31/10/2023 17/02/2024 12/12 24 203 3,5 B 176,0 3,9 0,00 7,1676 2 51,82
878 RMPB 31/10/2023 31/10/2023 17/02/2024 12/12 24 179 3,5 B 176,0 3,91 0,00 7,1676 2 51,69
879 RMPL 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 971 3,5 B 176,0 1,15 0,00 7,1676 2 175,75
880 RMPB 31/10/2023 31/10/2023 17/02/2024 12/12 24 305 3,5 B 176,0 1,79 0,00 7,1676 2 112,91
881 RMPB 31/10/2023 31/10/2023 17/02/2024 12/12 24 270 3,5 B 176,0 1,85 0,00 7,1676 2 109,25
882 OLP 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 955 3,5 B 176,0 1,5 0,00 7,1676 2 134,74
883 OLP 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 730 3,5 B 176,0 2,72 0,00 7,1676 2 74,30
884 OLP 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 1015 3,5 B 176,0 1,59 0,00 7,1676 2 127,11
885 OLP 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 1592 3,5 B 176,0 1,12 0,00 7,1676 2 180,45
886 OLP 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 883 3,5 B 176,0 1,28 0,00 7,1676 2 157,90
887 OLP 31/10/2023 31/10/2023 31/10/2023 17/02/2024 12/12/12 36 979 3,5 B 176,0 1,49 0,00 7,1676 2 135,64
888 OLS 31/10/2023 31/10/2023 18/02/2024 12/12 24 223 3,5 B 176,0 0,78 0,00 7,1676 2 259,11
889 OLS 31/10/2023 31/10/2023 18/02/2024 12/12 24 231 3,5 B 176,0 0,94 0,00 7,1676 2 215,01
890 OLP 31/10/2023 31/10/2023 31/10/2023 18/02/2024 12/12/12 36 1037 3,5 B 176,0 1,07 0,00 7,1676 2 188,89
891 RMPL 31/10/2023 31/10/2023 31/10/2023 18/02/2024 12/12/12 36 733 3,5 B 176,0 1,23 0,00 7,1676 2 164,31
892 RMPB 31/10/2023 31/10/2023 18/02/2024 12/12 24 167 3,5 B 176,0 2,15 0,00 7,1676 2 94,00
893 RMPL 31/10/2023 31/10/2023 31/10/2023 18/02/2024 12/12/12 36 706 3,5 B 176,0 2,18 0,00 7,1676 2 92,71
894 RMPL 31/10/2023 31/10/2023 31/10/2023 18/02/2024 12/12/12 36 1031 3,5 B 176,0 1,15 0,00 7,1676 2 175,75
895 RMPL 31/10/2023 31/10/2023 31/10/2023 18/02/2024 12/12/12 36 1009 3,5 B 176,0 1,95 0,00 7,1676 2 103,64
896 RMPL 31/10/2023 31/10/2023 31/10/2023 18/02/2024 12/12/12 36 951 3,5 B 176,0 1,61 0,00 7,1676 2 125,53
897 RMPB 31/10/2023 31/10/2023 18/02/2024 12/12 24 314 3,5 B 176,0 1,62 0,00 7,1676 2 124,76
898 PPF 31/10/2023 31/10/2023 31/10/2023 19/02/2024 12/12/12 36 430 3,5 B 176,0 4,06 0,00 7,1676 2 49,78
899 PPF 31/10/2023 31/10/2023 31/10/2023 19/02/2024 12/12/12 36 393 3,5 B 176,0 5 0,00 7,1676 2 40,42
900 RMPB 31/10/2023 31/10/2023 19/02/2024 12/12 24 135 3,5 B 176,0 4,5 0,00 7,1676 2 44,91
901 RMPB 31/10/2023 31/10/2023 19/02/2024 12/12 24 85 3,5 B 176,0 6,5 0,00 7,1676 2 31,09
902 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 244 3,5 B 176,0 1,47 0,00 7,1676 2 137,49
903 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 238 3,5 B 176,0 2,15 0,00 7,1676 2 94,00
904 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 243 3,5 B 176,0 1,35 0,00 7,1676 2 149,71
905 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 234 3,5 B 176,0 1,95 0,00 7,1676 2 103,64
906 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 296 3,5 B 176,0 1,22 0,00 7,1676 2 165,66
907 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 270 3,5 B 176,0 2,09 0,00 7,1676 2 96,70
908 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 246 3,5 B 176,0 2,71 0,00 7,1676 2 74,58
909 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 144 3,5 B 176,0 2,93 0,00 7,1676 2 68,98
910 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 264 3,5 B 176,0 2,08 0,00 7,1676 2 97,17

23
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
911 SBP
WSHE74 31/10/2023 31/10/2023 21/02/2024 12/12 24 212 3,5 B 176,0 2,25 0,00 7,1676 2 89,83
912 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 222 3,5 B 176,0 2,39 0,00 7,1676 2 84,56
913 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 239 3,5 B 176,0 3,64 0,00 7,1676 2 55,52
914 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 272 3,5 B 176,0 1,82 0,00 7,1676 2 111,05
915 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 147 3,5 B 176,0 4,3 0,00 7,1676 2 47,00
916 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 275 3,5 B 176,0 2,35 0,00 7,1676 2 86,00
917 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 292 3,5 B 176,0 2,34 0,00 7,1676 2 86,37
918 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 230 3,5 B 176,0 1,93 0,00 7,1676 2 104,72
919 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 292 3,5 B 176,0 2,06 0,00 7,1676 2 98,11
920 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 293 3,5 B 176,0 1,89 0,00 7,1676 2 106,94
921 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 178 3,5 B 176,0 0,89 0,00 7,1676 2 227,09
922 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 237 3,5 B 176,0 1,29 0,00 7,1676 2 156,67
923 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 205 3,5 B 176,0 6 0,00 7,1676 2 33,68
924 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 198 3,5 B 176,0 5 0,00 7,1676 2 40,42
925 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 329 3,5 B 176,0 2,62 0,00 7,1676 2 77,14
926 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 233 3,5 B 176,0 1,68 0,00 7,1676 2 120,30
927 WSHE 31/10/2023 31/10/2023 21/02/2024 12/12 24 219 3,5 B 176,0 1,79 0,00 7,1676 2 112,91
928 TANKI 31/10/2023 31/10/2023 31/10/2023 21/02/2024 12/12/12 36 729 3,5 B 176,0 3,02 0,00 7,1676 2 66,92
929 TANKI 31/10/2023 31/10/2023 31/10/2023 22/02/2024 12/12/12 36 599 3,5 B 176,0 1,27 0,00 7,1676 2 159,14
930 TANKI 31/10/2023 31/10/2023 31/10/2023 22/02/2024 12/12/12 36 308 3,5 B 176,0 4,5 0,00 7,1676 2 44,91

24
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
931 SBP 74
TANKI 31/10/2023 31/10/2023 31/10/2023 22/02/2024 12/12/12 36 407 3,5 B 176,0 5,55 0,00 7,1676 2 36,42
932 TANKI 31/10/2023 31/10/2023 31/10/2023 22/02/2024 12/12/12 36 448 3,5 B 176,0 2,02 0,00 7,1676 2 100,05
933 TANKI 31/10/2023 31/10/2023 31/10/2023 22/02/2024 12/12/12 36 754 3,5 B 176,0 1,36 0,00 7,1676 2 148,61
934 TANKI 31/10/2023 31/10/2023 31/10/2023 22/02/2024 12/12/12 36 621 3,5 B 176,0 1,39 0,00 7,1676 2 145,40
935 TANKI 31/10/2023 31/10/2023 31/10/2023 22/02/2024 12/12/12 36 564 3,5 B 176,0 2,28 0,00 7,1676 2 88,64
936 TANKI 31/10/2023 31/10/2023 31/10/2023 22/02/2024 12/12/12 36 559 3,5 B 176,0 1,88 0,00 7,1676 2 107,50
937 TANKI 31/10/2023 31/10/2023 31/10/2023 22/02/2024 12/12/12 36 631 3,5 B 176,0 2,36 0,00 7,1676 2 85,64
938 TANKI 31/10/2023 31/10/2023 31/10/2023 22/02/2024 12/12/12 36 481 3,5 B 176,0 2,35 0,00 7,1676 2 86,00
939 WBNEW 31/10/2023 31/10/2023 31/10/2023 23/02/2024 12/12 24 391 3,5 B 176,0 1,6 0,00 7,1676 2 126,32
940 WBNEW 31/10/2023 31/10/2023 31/10/2023 23/02/2024 12/12 24 258 3,5 B 176,0 2,15 0,00 7,1676 2 94,00
941 WBNEW 31/10/2023 31/10/2023 31/10/2023 23/02/2024 12/12 24 229 3,5 B 176,0 3,14 0,00 7,1676 2 64,37
942 WBNEW 31/10/2023 31/10/2023 31/10/2023 23/02/2024 12/12 24 194 3,5 B 176,0 2,48 0,00 7,1676 2 81,49
943 WBNEW 31/10/2023 31/10/2023 31/10/2023 23/02/2024 12/12 24 240 3,5 B 176,0 2,64 0,00 7,1676 2 76,56
944 WBNEW 31/10/2023 31/10/2023 31/10/2023 23/02/2024 12/12 24 249 3,5 B 176,0 1,2 0,00 7,1676 2 168,42
945 WBNEW 31/10/2023 31/10/2023 31/10/2023 23/02/2024 12/12 24 257 3,5 B 176,0 1,69 0,00 7,1676 2 119,59
946 WBNEW 31/10/2023 31/10/2023 31/10/2023 23/02/2024 12/12 24 186 3,5 B 176,0 2,08 0,00 7,1676 2 97,17
947 RMPB 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12 24 116 3,5 B 176,0 22,8 0,00 7,1676 2 8,86
948 RMPB 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12 24 149 3,5 B 176,0 19,9 0,00 7,1676 2 10,16
949 RMPL 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12 24 1501 3,5 B 176,0 25 0,00 7,1676 2 8,08
950 RMPL 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12/12 36 291 3,5 B 176,0 22,1 0,00 7,1676 2 9,15
951 RMPL 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12/12 36 584 3,5 B 176,0 11,8 0,00 7,1676 2 17,13
952 RMPB 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12 24 122 3,5 B 176,0 21,2 0,00 7,1676 2 9,53
953 RMPL 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12/12 36 561 3,5 B 176,0 21 0,00 7,1676 2 9,62
954 RMPL 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12/12 36 397 3,5 B 176,0 26,5 0,00 7,1676 2 7,63
955 RMPL 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12/12 36 643 3,5 B 176,0 22 0,00 7,1676 2 9,19
956 RMPL 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12/12 36 736 3,5 B 176,0 9,8 0,00 7,1676 2 20,62
957 RMPB 31/10/2023 31/10/2023 31/10/2023 25/03/2024 12/12 24 114 3,5 B 176,0 23,3 0,00 7,1676 2 8,67
958 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 805 3,5 B 176,0 18,5 0,00 7,1676 2 10,92
959 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 780 3,5 B 176,0 23 0,00 7,1676 2 8,79
960 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 674 3,5 B 176,0 20 0,00 7,1676 2 10,11
961 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 694 3,5 B 176,0 23 0,00 7,1676 2 8,79
962 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 454 3,5 B 176,0 22,5 0,00 7,1676 2 8,98
963 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 587 3,5 B 176,0 23,5 0,00 7,1676 2 8,60
964 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 418 3,5 B 176,0 20,5 0,00 7,1676 2 9,86
965 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 575 3,5 B 176,0 23 0,00 7,1676 2 8,79
966 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 544 3,5 B 176,0 19,1 0,00 7,1676 2 10,58

25
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
967 SBP
RMPL74 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 673 3,5 B 176,0 23,5 0,00 7,1676 2 8,60
968 RMPB 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12 24 141 3,5 B 176,0 23,3 0,00 7,1676 2 8,67
969 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 686 3,5 B 176,0 17,4 0,00 7,1676 2 11,62
970 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 703 3,5 B 176,0 18,7 0,00 7,1676 2 10,81
971 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 672 3,5 B 176,0 16 0,00 7,1676 2 12,63
972 RMPB 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12 24 121 3,5 B 176,0 12 0,00 7,1676 2 16,84
973 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 790 3,5 B 176,0 21 0,00 7,1676 2 9,62
974 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 625 3,5 B 176,0 17,8 0,00 7,1676 2 11,35
975 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 538 3,5 B 176,0 25 0,00 7,1676 2 8,08
976 RMPL 31/10/2023 31/10/2023 31/10/2023 26/03/2024 12/12/12 36 766 3,5 B 176,0 23 0,00 7,1676 2 8,79
977 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 606 3,5 B 176,0 11,1 0,00 7,1676 2 18,21
978 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 450 3,5 B 176,0 10,5 0,00 7,1676 2 19,25
979 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 607 3,5 B 176,0 23,6 0,00 7,1676 2 8,56
980 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 242 3,5 B 176,0 11 0,00 7,1676 2 18,37
981 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 307 3,5 B 176,0 22 0,00 7,1676 2 9,19
982 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 825 3,5 B 176,0 17,5 0,00 7,1676 2 11,55
983 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 368 3,5 B 176,0 24,5 0,00 7,1676 2 8,25
984 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 636 3,5 B 176,0 18,8 0,00 7,1676 2 10,75
985 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 545 3,5 B 176,0 22 0,00 7,1676 2 9,19
986 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 775 3,5 B 176,0 19,2 0,00 7,1676 2 10,53
987 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 337 3,5 B 176,0 26,9 0,00 7,1676 2 7,51
988 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 568 3,5 B 176,0 22,8 0,00 7,1676 2 8,86
989 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 495 3,5 B 176,0 22,8 0,00 7,1676 2 8,86
990 RMPB 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12 24 195 3,5 B 176,0 21,5 0,00 7,1676 2 9,40
991 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 376 3,5 B 176,0 21,5 0,00 7,1676 2 9,40
992 RMPB 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12 24 209 3,5 B 176,0 11 0,00 7,1676 2 18,37
993 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 634 3,5 B 176,0 17,9 0,00 7,1676 2 11,29
994 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 175 3,5 B 176,0 17 0,00 7,1676 2 11,89
995 RMPB 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12 24 208 3,5 B 176,0 23 0,00 7,1676 2 8,79
996 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 758 3,5 B 176,0 13,8 0,00 7,1676 2 14,65
997 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 485 3,5 B 176,0 21,1 0,00 7,1676 2 9,58
998 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 720 3,5 B 176,0 14,8 0,00 7,1676 2 13,66
999 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 865 3,5 B 176,0 14,2 0,00 7,1676 2 14,23
1000 RMPB 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12 24 137 3,5 B 176,0 13 0,00 7,1676 2 15,55
1001 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 773 3,5 B 176,0 15 0,00 7,1676 2 13,47
1002 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 772 3,5 B 176,0 20 0,00 7,1676 2 10,11
1003 RMPB 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12 24 773 3,5 B 176,0 21,5 0,00 7,1676 2 9,40
1004 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12 36 759 3,5 B 176,0 19,7 0,00 7,1676 2 10,26
1005 RMPL 31/10/2023 31/10/2023 31/10/2023 27/03/2024 12/12/12 36 757 3,5 B 176,0 9,9 0,00 7,1676 2 20,41
1006 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 1757 3,5 B 176,0 9,9 0,00 7,1676 2 20,41

26
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
1007 SBP
RMPL74 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/13 36 1528 3,5 B 176,0 7,8 0,00 7,1676 2 25,91
1008 RMPB 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12 24 294 3,5 B 176,0 23,1 0,00 7,1676 2 8,75
1009 RMPB 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12 24 224 3,5 B 176,0 24,5 0,00 7,1676 2 8,25
1010 RMPB 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12 24 195 3,5 B 176,0 24,5 0,00 7,1676 2 8,25
1011 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 702 3,5 B 176,0 14,2 0,00 7,1676 2 14,23
1012 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 849 3,5 B 176,0 11 0,00 7,1676 2 18,37
1013 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 799 3,5 B 176,0 10,3 0,00 7,1676 2 19,62
1014 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 991 3,5 B 176,0 17,9 0,00 7,1676 2 11,29
1015 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 708 4,5 B 176,0 17,9 0,00 7,1676 2 17,06
1016 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 620 5,5 B 176,0 17,9 0,00 7,1676 2 23,48
1017 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 1118 6,5 B 176,0 17,9 0,00 7,1676 2 30,39
1018 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 367 7,5 B 176,0 17,9 0,00 7,1676 2 37,71
1019 RMPB 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12 36 266 8,5 B 176,0 17,9 0,00 7,1676 2 45,34
1020 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 726 9,5 B 176,0 17,9 0,00 7,1676 2 53,24
1021 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 428 10,5 B 176,0 17,9 0,00 7,1676 2 61,36
1022 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 724 11,5 B 176,0 17,9 0,00 7,1676 2 69,66
1023 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 730 12,5 B 176,0 17,9 0,00 7,1676 2 78,11
1024 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 718 13,5 B 176,0 17,9 0,00 7,1676 2 86,70
1025 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 430 14,5 B 176,0 17,9 0,00 7,1676 2 95,41
1026 RMPB 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12 36 242 15,5 B 176,0 17,9 0,00 7,1676 2 104,21
1027 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 640 16,5 B 176,0 17,9 0,00 7,1676 2 113,10
1028 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 720 17,5 B 176,0 17,9 0,00 7,1676 2 122,07
1029 RMPL 31/10/2023 31/10/2023 31/10/2023 28/03/2024 12/12/12 36 956 18,5 B 176,0 17,9 0,00 7,1676 2 131,10
1030 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 713 15,5 B 176,0 17,9 0,00 7,1676 2 104,21
1031 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 523 18,3 B 176,0 17,9 0,00 7,1676 2 129,29
1032 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 539 19,3 B 176,0 17,9 0,00 7,1676 2 138,38
1033 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 674 24,4 B 176,0 17,9 0,00 7,1676 2 185,44
1034 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 641 23,5 B 176,0 17,9 0,00 7,1676 2 177,06
1035 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 565 15,5 B 176,0 17,9 0,00 7,1676 2 104,21
1036 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 307 24,5 B 176,0 17,9 0,00 7,1676 2 186,37
1037 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 388 23 B 176,0 17,9 0,00 7,1676 2 172,41
1038 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 994 13,5 B 176,0 17,9 0,00 7,1676 2 86,70
1039 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 1184 7,3 B 176,0 17,9 0,00 7,1676 2 36,22
1040 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 991 21,7 B 176,0 17,9 0,00 7,1676 2 160,39
1041 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 712 14,8 B 176,0 17,9 0,00 7,1676 2 98,04
1042 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 1003 11,5 B 176,0 17,9 0,00 7,1676 2 69,66
1043 RMPB 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12 24 276 22,8 B 176,0 17,9 0,00 7,1676 2 170,56
1044 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 800 19,9 B 176,0 17,9 0,00 7,1676 2 143,85
1045 RMPB 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12 24 277 15,5 B 176,0 17,9 0,00 7,1676 2 104,21
1046 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 777 21,1 B 176,0 17,9 0,00 7,1676 2 154,86

27
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Middle Middle (up) Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
1047 SBP
RMPL74 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 941 16,2 B 176,0 17,9 0,00 7,1676 2 110,43
1048 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 270 18,8 B 176,0 17,9 0,00 7,1676 2 133,83
1049 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 1121 5,3 B 176,0 17,9 0,00 7,1676 2 22,15
1050 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 842 17,7 B 176,0 17,9 0,00 7,1676 2 123,87
1051 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 955 11,7 B 176,0 17,9 0,00 7,1676 2 71,34
1052 RMPL 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12/12 36 844 23,5 B 176,0 17,9 0,00 7,1676 2 177,06
1053 RMPB 31/10/2023 31/10/2023 31/10/2023 29/03/2024 12/12 24 317 25 B 176,0 17,9 0,00 7,1676 2 191,04
1054 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 825 13,2 B 176,0 17,9 0,00 7,1676 2 84,11
1055 RMPB 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12 24 182 20,8 B 176,0 17,9 0,00 7,1676 2 152,10
1056 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 560 2,2 B 176,0 17,9 0,00 7,1676 2 5,08
1057 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 573 19,4 B 176,0 17,9 0,00 7,1676 2 139,29
1058 RMPB 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12 24 159 26,6 B 176,0 17,9 0,00 7,1676 2 206,03
1059 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 679 20,5 B 176,0 17,9 0,00 7,1676 2 149,35
1060 RMPB 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12 24 206 22,2 B 176,0 17,9 0,00 7,1676 2 165,01
1061 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 539 22,5 B 176,0 17,9 0,00 7,1676 2 167,78
1062 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 746 11,5 B 176,0 17,9 0,00 7,1676 2 69,66
1063 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 1025 11,6 B 176,0 17,9 0,00 7,1676 2 70,50
1064 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 539 24,5 B 176,0 17,9 0,00 7,1676 2 186,37
1065 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 939 16,9 B 176,0 17,9 0,00 7,1676 2 116,68
1066 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 1739 15,5 B 176,0 17,9 0,00 7,1676 2 104,21
1067 RMPL 31/10/2023 31/10/2023 31/10/2023 30/03/2024 12/12/12 36 891 20,4 B 176,0 17,9 0,00 7,1676 2 148,43