AND OPERATION & MAINTENANCE OF 8.00 MLD CAPACITY STP BASED ON CYCLIC
ACTIVATED SLUDGE PROCESS / SBR TECHNOLOGY
AMOUNT
SR.NO PARTICULAR
(Rs.)
RAW SEWAGE PUMPING STATION (8 MLD
A
CAPACITY)
2 MECHANICAL WORKS 0.00
SUB TOTAL (A) 0.00
1 of 10
NAME OF WORK: DESIGN, CONSTRUCTION, SUPPLY, ERECTION, COMMISSIONING AND OPERATION & MAINTENANCE OF 8.00 MLD CAPACITY STP BASED ON CYCLIC
ACTIVATED SLUDGE PROCESS / SBR TECHNOLOGY
TOTAL COST
UNIT RATE WITH
TOTAL SUPPLY ERECTION GST ON
SL INCLUDING SUB TOTAL CONTRACTOR'
DESCRIPTION W S T UNIT COST @ 5% ERECTION
NO P&F, F&I & GST (Rs.) S PROFIT @
(Rs.) (Rs.) INR
(Rs.) 15%
(Rs.)
REMARKS
TOTAL COST
UNIT RATE
TOTAL SUPPLY ERECTION GST ON WITH
SL INCLUDING SUB TOTAL
DESCRIPTION W S T UNIT COST @ 5% ERECTION CONTRACTOR'S REMARKS
NO P&F, F&I GST (Rs.)
(Rs.) (Rs.) INR PROFIT @ 15%
(Rs.)
(Rs.)
3 RAS Pumps with Motor 85 m3/hr @ 4 MWC, CI Body 2 0 2 No. 0.00 0.00 0.00 0.00 0.00
& SS Internals, Sumbersible
75 m3/hr @ 10 MWC, CI
4 SAS Pumps with Motor Body & SS Internals, 2 0 2 No. 0.00 0.00 0.00 0.00 0.00
Sumbersible
TECHNOLOGY COMPONENTS
1 Decanters Moving Weir Type, SS 304 2 0 2 No. 0.00 0.00 0.00 0.00 0.00
TOTAL COST
UNIT RATE
TOTAL SUPPLY ERECTION GST ON WITH
SL INCLUDING SUB TOTAL
DESCRIPTION W S T UNIT COST @ 5% ERECTION CONTRACTOR'S REMARKS
NO P&F, F&I GST (Rs.)
(Rs.) (Rs.) INR PROFIT @ 15%
(Rs.)
(Rs.)
3 Centrifuges with Motors 12m3/hr, Solid Bowl Type, SS 1 1 2 No. 0.00 0.00 0.00 0.00 0.00
304 Wetted Parts Market Rate as per
Vendor's Quotation
Chain Electric Hoists with
4 3 Ton, 6 m Lift 1 0 1 No. 0.00 0.00 0.00 0.00 0.00
Electric Trolley for above
Polyelectrolyte Dosing
5 80 LPH, Metering, PP 1 1 2 No. 0.00 0.00 0.00 0.00 0.00
Pumps with Motors
Agitators for Polyelectrolyte 1.00 HP/100 RPM, Slow
6 2 0 2 No. 0.00 0.00 0.00 0.00 0.00
Dosing Tanks with Motors Speed, SS 304
E OTHERS
1 Lab Equipments 1 0 1 No. 0.00 0.00 0.00 0.00 0.00 Market Rate as per
Vendor's Quotation
Total (Rs.) 0.00 0.00
say 0.00
NAME OF WORK: DESIGN, CONSTRUCTION, SUPPLY, ERECTION, COMMISSIONING AND OPERATION & MAINTENANCE OF 8.00 MLD CAPACITY STP BASED ON CYCLIC
ACTIVATED SLUDGE PROCESS / SBR TECHNOLOGY
TOTAL COST
UNIT RATE
TOTAL SUPPLY ERECTION GST ON WITH
SL INCLUDING SUB TOTAL
DESCRIPTION SIZE / DIMENSION W S T UNIT COST @ 5% ERECTION CONTRACTOR'S REMARKS
NO P&F, F&I & (Rs.)
(Rs.) (Rs.) INR PROFIT @ 15%
GST (Rs.)
(Rs.)
TOTAL COST
UNIT RATE WITH
TOTAL SUPPLY ERECTION GST ON
INCLUDING SUB TOTAL CONTRACTOR'
SL NO DESCRIPTION W S T UNIT COST @ 5% ERECTION REMARKS
P&F, F&I GST (Rs.) S PROFIT @
(Rs.) (Rs.) INR
(Rs.) 15%
(Rs.)