Two Week Look Ahead

Location: PS 5

AREA Qty

20.96
PIC rebar and concrete

27.03
SSB BUILDING rebar and concrete

4.76
GATEHOUSE rebar and concrete

500
parking shade parking shade near the PIC building compaction

12.16
holding tank WATER HOLDING TANK near pic building

12.16
holding tank water holding tank near ssb building

Access road east 250


side leveling grading compaction and backfilling

outer patrol road 280


south side leveling grading compaction and backfilling

outer patrol road 120


north side leveling grading compaction and backfilling
500
demolation parking shade east side
Current
DWG
Completion Remaining Engineering Dependencies Documents
Reference
status
UOM
XA-
CuM 0 20.96 951422-
001

XA-
CuM 0 27.03 951428-
001

XA-
CuM 0 4.76 951428-
001

XA-
SQM 25.37 474.63
951362003

XA-
CuM 7.46 4.7 951362- CONFINE SPACE
003

XA-
CuM 7.46 4.7 951362- CONFINE SPACE
003

XA-
CuM 0 250 951247-
002

XA-
CuM 0 280 951248-
005

XA-
CuM 0 120 951248-
001
XA-
SQM 0 500 951269-
001
Fri

Resources Material Start Date End Date Duration 26-Jan-24

HAND TOOLS

HAND TOOLS

HAND TOOLS 3-Feb-24 8-Feb-24 5

31-Jan-24 1-Feb-24 2

30-Jan-24 2-Feb-24 3

30-Jan-24 1-Feb-24 3

28-Jan-24 30-Jan-24 3

29-Jan-24 31-Jan-24 3

30-Jan-24 1-Feb-24 3

SCAFFOLDING
SUPERVISOR
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon

27-Jan-24 28-Jan-24 29-Jan-24 30-Jan-24 31-Jan-24 1-Feb-24 2-Feb-24 3-Feb-24 4-Feb-24 5-Feb-24
Tue Wed Thu Fri

6-Feb-24 7-Feb-24 8-Feb-24 9-Feb-24