CL

REINFORCEMENT SCHEDULE FOR ONE (1) GIRDER


CONCRETE CONCRETE
STRUCTURE VOLUME STRENGTH
MARK REMARKS
COMPONENT BAR DIMENSIONS (mm) TOTAL UNIT (m³) (mPa)
SIZE SPACING LENGTH PER TOTAL WEIGHT
QTY SHAPE LENGTH WEIGHT
(mm) (mm) BAR (m) (kg)
a b c d e (m) (kg/m)

G1 25 2 A 46000 1000 - - - 5 600 3000 51.00 102.00 3.854 393.108

G2 36 2 B 46000 550 - - - 4 1350 5400 52.50 105.00 7.991 839.055

G3 36 2 B 46000 550 - - - 4 1350 5400 52.50 105.00 7.991 839.055

G4 36 4 C 12000 - - - 100 12.00 48.00 7.991 383.568

G5 32 4 C 9000 - - - 1600 9.00 36.00 6.313 227.268

G6 32 4 C 6000 - - - 2800 6.00 24.00 6.313 151.512

GIRDER G7 36 2 C 10500 - - - 2400 10.50 21.00 7.991 167.811 15.922 27.58

G8 32 2 C 7500 - - - 3950 7.50 15.00 6.313 94.695

G9 16 8 195 C 46000 - - - - 48.50 388.00 1.579 612.652

100, 150
G10 12 260 D 310 1100 90 - - 3.00 780.00 0.888 692.640
250

G11 36 14 2000 A 320 - - - - 0.32 4.48 7.991 35.800

GRADE 40 TOTAL = 1,305.29

GRADE 60 TOTAL = 3,131.87

PREPARED : PROJECT NAME & LOCATION : SHEET CONTENTS : CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

ONE HUNDRED PERCENT "AS-STAKED" PLAN for the


CONSTRUCTION & WIDENING OF PERMANENT BRIDGES
DPWH

REPUBLIC OF THE PHILIPPINES BRIDGE


BELLA C. TIOTANGCO SALOGON BR. (SALUGON FLOODWAY) LORLAINE V. DESAMITO RONALD G. SUPANGA EUGENIO R. KATON ROCHEL D. HERMANO NOEL L. FUENTEBELLA
DEVELOPEMENT (B00121PW) ALONG PUERTO PRINCESA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV-B S 55
CORPORATION OWNER/MANAGER
SOUTH RD PALAWAN 2ND
DISTRICT ENGINEERING OFFICE
PROJECT ENGINEER OIC, CONSTRUCTION SECTION CHIEF, PLANNING AND DESIGN SECTION OIC - OFFICE OF THE
ASSISTANT DISTRICT ENGINEER
DISTRICT ENGINEER

DATE : BROOKE'S POINT, PALAWAN NARRA, PALAWAN DATE : DATE : DATE : DATE : DATE :