VOLUME VII
Pricing Document
Indore Metro Rail Project
Package IN-09
Volume VII – Financial Package Including BOQ
1. PREAMBLE
1.1 General Requirements
1.1.1 The Pricing Document as contained in this Volume VII, is comprising two parts.
The first part includes Preamble, instructions and conditions. The other part
includes Financial Bid, a bidding sheet in excel file form. The Tenderer shall
complete the Pricing Document in accordance with the instructions given. The
completed Pricing Document including duly signed Preamble (first part) and a true
copy of all documents of Financial Bid (other part) with prices left blank shall be
submitted with the Technical Package. The Financial Bid duly completed and
priced in all respect shall be submitted under Second Cover “FINANCE” only.
1.1.2 This Pricing Document shall be read in conjunction with the Instructions to
Tenderers, General and Particular Conditions of Contract, Notice Inviting Tender,
Employer’s Requirements, Technical Specifications, Material & Workmanship
Specifications, Tender Drawings and any Reference Documents etc., including
annexure, appendix, addendum or corrigendum and any - other documents
forming part of the Tender Documents. If the specifications in the scope of work,
Employer’s Requirement, Technical Specifications and/or Material & Workmanship
Specifications are inferior with respect to relevant codes and standards then
provision of the Codes and Standards shall prevail and vice-versa. The decision of
the Engineer regarding this issue shall be binding on the contractor.
1.1.3 The Pricing Document comprises Bill of Quantities for Indore Metro Rail Project
(Yellow Line & Depot). This Preamble shall serve as a definitive guide to the
measurement of quantities and payment.
1.1.4 This Contract is a re-measurement Contract for “Engineering, Supply, Erection,
Testing and Commissioning of Power Supply Receiving Sub–Station (RSS),
Traction Sub-Station (TSS), Auxiliary Sub-Station (ASS), 750 V DC 3rd Rail and
SCADA System”. The scope also includes Integrated Testing and Commissioning
of 132 KV Receiving Substations, 33 KV Rings, Auxiliary Substations, Traction
Substations, DC Cables, SCADA, Stray current Monitoring system and associated
works. The Contract also involves design and supply of equipment and accessories
for 3rd rail system and erection, testing and commissioning of the 3rd Rail system.
The Contract includes associated civil works (RSS, Depot TSS). The Contract
includes the following but is not limited to:
1.1.4.1 The construction studies and drawings, validation of design, verification of site
data, drawings, programs for execution, schedule of ordering, schedule of receipt
of equipments at site etc.
1.1.4.2 The procurement of the whole equipments including:
a) spare parts,
b) tools, testing equipment,
1.1.4.3 The on-site erection and setting to work of the electrical fixed installations and
technical buildings described in the relevant Basic Design documents,
1.1.4.4 The in-plant testing, and acceptance tests,
Total) of the Financial Bid (excel workbook). In case of any mismatch the prices of
the excel sheet “TT” (Financial Bid: Tender Total) of the Financial Bid (excel
workbook) shall prevail. The excel sheet “BoQ” of the Financial Bid (Financial
Package) excel workbook and comparison generated by eProcurement portal shall
not be considered for determining inter-se position of tenderers.
1.4 Price Variation
1.4.1 Prices quoted by the Tenderer shall be fixed throughout the Tenderer’s
performance of the Contract and not subject to variation on any account except for
items indicated in following clause.
1.4.2 For items manufactured in India and quoted in Indian rupees in the tender the price
variation shall be subject to price variation as per relevant IEEMA formula, given in
Annexure-B at the end of this Volume and prescribed in PC Clause No 13.7 of
Volume-II.
Table 1: Items under Price Variation
1.4.3 The price variation shall be payable on the basis of relevant IEEMA formulas
(website www.ieema.org) for items in above table.
1.4.4 For items manufactured offshore (outside India) and quoted in foreign currency
(USD, EURO) the price variation will be governed by the formula given below. For
“Conductor Rail” [BOQ Bill No. IN-6.1– Item No. A.1], the price adjustment shall be
linked to spot rate of aluminium quoted at London Metal Exchange (LME), and shall
be as under:
Price Adjustment = 0.75 x Accepted Price x [Current Index – Base Index] x f
Base Index
Where;
Current Index is the spot rate cost of aluminium as given on the L.M.E. (London
Metal Exchange) 28 (twenty-eight) days prior to the date of notification to Engineer
/ Employer for inspection of material;
Base Index is the cost of aluminium as given by the L.M.E. (London Metal
Exchange) 28 (twenty-eight) days prior to the latest date of Tender submission;
f = Zo / Z1
Zo is the number of units of the currency of the index which is equivalent to one unit
of bid currency as applicable on 28 (twenty-eight) days prior to the latest date of
Tender submission; and
Z1 is the number of units of the currency of the index which is equivalent to one unit
of bid currency as applicable on 28 (twenty-eight) days prior to the date of
notification for inspection.
Note: The exchange rates to be employed for such conversion shall be the TT
selling rate of State Bank of India at the close of business of the State Bank of India
on the respective date.
1.4.5 The price variation on equipment indicated in clause 1.4.2 and 1.4.4 above shall
be applicable for supply prices only. The erection prices shall be subjected to price
variation as per PC Clause No 13.7 of volume-II.
1.4.6 For items covered under IEEMA price variation clause, the latest date of delivery
for considering price variation shall not be later than 180 (one hundred and eighty)
days before the relevant Key Date for commissioning. However, if the price
variation calculated as per the actual date of delivery is resulting in a price
advantage to the Employer; the actual date of delivery shall be considered for
evaluating the price variation.
1.4.7 For Conductor Rail, the latest date of notification for inspection of material for
considering price variation shall not be later than 60 (sixty) days before that
relevant Key Date for procurement of Third Rails and associated items. However,
if the price variation calculated as per the actual date of notification of inspection is
resulting in a price advantage to the Employer; the actual date of notification shall
be considered for evaluating the price variation.
1.4.8 The total admissible price variation amount for this Contract shall be subject to a
ceiling of ± 5 % (five percent) of the Contract Price.
1.4.9 Price variation that may accrue during the period from the date of tender
submission will not be considered for Tender evaluation and for deciding inter-se
position of the Tenderers.
1.5 Quantities
1.5.1 For the purpose of this Contract, all unit quantities given in the Bills of Quantities
are the estimated quantities of the Works and are intended in the first instance to
provide a common basis for Tendering and Tender Evaluation. When a contract
has been entered into, the function of priced Bills of Quantities is to provide for the
valuation of the work executed. No alteration of any rate or price shall be allowed
on account of any difference between the quantities billed and the actual quantities
measured from the drawings.
1.5.2 The Tenderer shall make himself completely acquainted with all conditions,
obligations, specifications, drawings, etc. of the Tender Documents before giving
his prices. He shall have no right to claim any price revision on the basis of
ignorance of the Tender Documents or local conditions, or to make any claims as
regards the integrity of the unit prices of the Bills of Quantities.
1.6 Units and Currency
1.6.1 All sizes and quantities entered in the Bills of Quantities are in metric units.
1.6.2 The Tenderer shall fill in each column with unit rate or lump sum, whichever the
case may be, for each bill item of the various Bills, on the basis of the Tender
Documents and pre-tender survey.
1.6.3 The Tenderer, in addition to Indian Rupees, may quote in foreign currencies
(restricted to US, Dollar & Euro).
1.7 Rates & Sums to be for Work Finished Complete
1.7.1 Tenderers shall be deemed to have read the Work’s Requirements and other parts
of the Tender Documents and reviewed the Drawings to ascertain the full scope of
the requirements included in each item prior to filling in the rates and prices. The
entered rates and prices shall be deemed to include the full scope of the Contract,
including overheads and profits and shall bear a proper relationship to the cost of
carrying out the work described.
1.7.2 Notwithstanding any limits that may be implied by the wording of the individual
items and/or the explanations in the Preamble, the rates and prices, which the
Tenderer enters in the Bill of Quantities, shall be for the work finished complete in
every respect.
1.7.3 The Tenderer shall be deemed to have taken full account of all requirements,
liabilities, obligations and risks, whether expressed or implied, and to have priced
the items accordingly. The Items in the Bills of Quantities are the only items against
which payment will be made. The cost of any item of work not specifically described
or measured in the Bills of Quantities but required for the execution of the Contract
shall be included in the rates and prices for the measured items in the Bills of
Quantities. The rates and prices shall therefore include for all incidental and
contingent expenses and risks of every kind necessary to supply, install, test and
commission (including Integrated Testing and Commissioning) complete, and
remedying any defects in the whole of the Works in accordance with the Contract.
1.8 Allowances in Rates and Prices
1.8.1 Full allowance shall be made in the rates and prices against the various items in
the Bills of Quantities for all costs involved in performing the following except to the
extent that work is specifically described and paid for in the Bills of Quantities. The
list below is not exhaustive and the Tenderers are expected to take all costs
involved while quoting the rates and prices that will not be subject to variation on
any account.
a) all setting out and final survey work;
b) temporary access roads and bridges, fencing, watching and security, lighting;
c) paying fees and giving notices to Authorities;
d) payment of all patent rights and royalties;
e) reinstatement of the Site;
f) safety precautions and all measures to prevent erosion and suppress fire and
other hazards;
g) interference to the Works by persons, vehicles, and the like being legitimate
users of the facilities on or in the vicinity of the Site;
h) the protection and safety of MPMRCL trains and services;
i) the protection and safety of Railway trains and services on adjacent tracks;
j) supplying, maintaining and removing on completion, the Contractors own
accommodation, offices, depots, stores, workshops, transport, welfare
services and other facilities including telephones and facsimile machines and
all charges in connection therewith;
k) the supply, inspection, testing, packaging and transportation of materials and
of the Works as specified including the provision and use of equipment and
arrangements for the Engineer's Inspectors and others;
l) maintaining public thoroughfares and footpaths, and maintaining access upon
existing recognised routes;
m) providing, transporting to the Site, setting to work, operating (including all fuel
and consumable stores), maintaining and removing from the Site upon
completion all Construction Plant and Contractor's Equipment necessary for
the execution of the Works and including the cost of all tests and other
requirements in respect of such; plant and equipment;
n) working adjacent to or across existing services and installations;
o) complying with the requirements of the Employer in regard to Safety and
Health, Quality Assurance, Environmental and project implementation plans
and making periodical submissions;
p) co-ordination and interference to the Works by the works of Designated
Contractors and others employed by MPMRCL being legitimate users of the
facilities on or in the vicinity of the Site;
q) remedying of defects and shrinkage, and works of amendment,
reconstruction, replacement of other faults, fair wear and tear excepted,
during Defects Notification Periods;
r) protections to be implemented against Electromagnetic interference effects
following line energization;
s) Insurance, including all risks in supply, erection, storage, transit, third party,
Workmen’s Compensation and others;
t) All tools, and equipment required for all tests prior and after delivery and for
testing and commissioning installed systems;
u) Carrying out all modifications to the given drawings, preparing construction
detailed drawings and supplying originals, copies, and electronic files in
accordance with employer’s requirement.
v) Marine Insurance
w) All risk Insurance after arrival of goods in India
x) Custom clearance / Port Clearance
y) Handling at Port of arrival in India
z) Inland transportation from port of arrival to site of work
aa) Various bank guarantees / warranties/undertakings
1.9 Non-priced Items
1.9.1 Items against which no rate or price is entered by the Tenderer whether quantities
are stated or not, shall be regarded as covered by other rates in the Bills of
Quantities.
1.10 Tender Pricing
1.10.1 The Tenderer shall take regard of the actual site conditions and the estimated
quantities entered in the various bills. The Tenderer shall price his tender
accordingly and the rates and prices entered against a bill line item shall be the full
and only price paid for all work performed against that item except as described in
6. IN-6.1, A.1, A.2, A.3, A.4, A.5, A.6, A.7, A.8, A.9.
B.1, B.2, B.3, B.4, B.5, B.6, B.7
C.1, C.2, C.3
8. IN-8.1, A.1, A.2, A.3, A.4, A.5, A.6, A.7, A.8, A.9,
A.10, A.11, A.12, A.13.
B.1, B.2, B.3, B.4, B.5, B.6, B.7.
C.1, C.2, C.3, C.4, C.5, C.6.
D.1, D.2, D.3, D.4, D.5, D.6, D.7, D.8, D.9.
E.1, E.2, E.3, E.4, E.5, E.6, E.7, E.8, E.9.
F.1, F.2, F.3, F.4, F.5, F.6, F.7, F.8, F.9.
G.
1.11.7 Compensation for items covered in Clause 1.11.6 above & Bill No. IN-10, shall
include for all costs incurred in procurement/manufacture, factory testing,
inspection, shipping, hauling, off-loading, storing at site in Indore. Payment will be
made for the items delivered and stored in a place and manner approved by the
Engineer. Payment shall be made on the basis of 80% of the supply price quoted
in the bid on delivery to the Contractor’s respective storage place in Indore and
balance 20% of the supply price after installation, testing, and commissioning in
the depot and/or on the section as certified by the Engineer. Payment on delivery
will be made against the submission of following documents:
a. Certificate of type tests;
b. Certification of Factory Acceptance Tests;
c. Certificate of inspection by the Engineer;
d. Provision of Safe Custody Bank Guarantee;
e. Proof of insurance; and
f. Technical literature and equipment manual.
g. Packing list
1.11.8 NOT USED
1.11.9 Prices so assigned in the BOQ, for erection and commissioning portion of items of
materials, plant and equipment shall be for the full compensation for the installation
/ erection, testing and commissioning of material, plant and equipment in
accordance with the drawings and specifications. Compensation shall include for
all costs incurred for transporting to location, off-loading and moving to point of
installation/erection; provision of specified foundations; preparing for installation /
erection and mounting on foundations; supply of left out items, aligning, fastenings
and securing devices; adjusting as necessary, making good and clearing the
location on completion, all to the approval of the Engineer. Payment for erection
and commissioning shall be made for 80% of the item on completion of Partial
Acceptance Test of the system. Balance payment of 20% towards erection and
commissioning shall be made when the plant, equipment is tested and
commissioned and become eligible for payment under Clause 1.11.10 below.
1.11.10 Prices for Testing and Commissioning shall be full compensation for the testing
and commissioning of plant and equipment supplied under the Contract in
accordance with the drawings and specifications including integrated testing and
commissioning. Testing and commissioning shall include for all testing and putting-
to-work of all equipment, sub-systems, and systems; re-testing, fault finding,
adjustments and reworking as necessary; submittal of all test reports and other
documents all to the approval of the Engineer. Payment will be made after
certification by the Contractor and acceptance by the Engineer that the sub-
systems and systems, including all equipment have successfully completed the
test procedures, and have been set-to-work and that all test results and other
documentation, as described in the specifications, have been approved by the
Engineer.
1.11.11 Items covered under Civil and Building Works including Electrification [Bill Nos. IN-
10] shall be operated on plinth area pro rata basis. Civil and Building works shall
include but not limited to land and buildings associated with Receiving Sub-Station,
power supply works and other works necessitated by the works under the Contract
and as described in the drawings and specifications. Compensation shall include
for transporting to site; all clearing and grubbing; excavation and removal offsite to
spoil; levelling; local excavation and backfilling to foundations; structural,
architectural, and sundry building works; roof and surface drainage, transformer
drainage, septic tank and effluent filtration system; road works; excavating,
providing and installing cable troughs; excavating and subsequent backfilling of
cable trenches; internal utility services such as water supply, water closets and
wash facilities with outlet connections to septic tank, electrical and communication
systems in each building; landscaping; perimeter fencing and gates; and clearing
the site on completion, all to the approval of the Engineer. Compensation shall
include all necessary attendance upon other trades working in buildings, drilling,
fixing, securing, etc.; sundry excavation and concreting, and generally making
good after other trades. Partial payments will be made for work completed in place
to provide progressive payments as approved by the Engineer.
1.11.12 Prices for training of Employer’s staff shall be pro-rata compensation for the
training of Employer’s staff in different disciplines including training in Metros in
India in accordance with the specifications. Compensation shall include for
preparation, submittal and revisions as required by the Engineer of training
manuals and curricula, employment of approved training staff and all associated
costs and travel costs; provision of all manuals for each training course; provision
and maintenance of training facilities. Payment shall be made at the quoted man-
week rate for each attendee on completion of training. Payment shall be made in
no more than four stages.
1.11.13 Prices for Manuals and Drawings shall be full compensation for documents and the
like in accordance with the specifications. Compensation shall include for the
preparation, submission, and all subsequent revisions, changes required and re-
submittals as necessary as required by the specifications until accepted by the
Engineer.
a) Review of design and preparation of drawings: Shall include but not be limited
to review of design, documents, drawings, calculations as issued by the
Employer to the Contractor, other drawings to be prepared by the Contractor
as specified in the Particular specification for approval of the Engineer as
required by construction at site. This will also include shop drawings
containing the information related to Permanent Works.
b) Operation and Maintenance Manuals: Shall include but not be limited to
preparation and revision of Operation and Maintenance Manuals as specified
in Employer requirements (Vol-III) & Technical specifications (Vol-IV)
pertaining to all equipments / systems / subsystems which have been used /
deployed in the Project.
c) As built drawings: Shall include but not be limited to supply of as built drawings
of all equipments / systems / subsystems in the Permanent Work constructed
under this Contract. Payment shall be made when all the As-Built drawings
for each discipline have been reviewed and accepted by the Engineer.
1.11.14 Prices for Maintenance Supervision during Defect Notification Period (DNP) shall
be pro-rata compensation for the supervision by the Contractor of the Employer’s
maintenance staff in different disciplines in accordance with the specifications.
Compensation shall include for the approval of the supervisors and replacement
as required by the Employer, employment of approved staff including salaries,
overtime, airfares, lodging allowances, their office expenditure, telephones / mobile
bills, local travel costs to and from site, training materials, income tax and other
taxes deducted at source. Payment shall be made at the quoted man-month rate
for each approved supervisor who is at site. Payment shall be made in no more
than four stages.
1.11.15 Prices for Integrated Testing and Commissioning shall be full compensation for the
integrated testing and commissioning of plant and equipment supplied under the
Contract in accordance with the drawings and specifications. Compensation shall
include for preparation, submittal, and revisions as required by the Engineer of
testing plans and procedures; co-ordination with other Designated Contractors;
conduct of approved tests as directed by the Engineer on equipment, sub-systems,
and systems; revisions, re-testing, fault finding, adjustments and reworking as
necessary; submittal of all test reports and other documents all to the approval of
the Engineer. 80% Payment will be made for each Section (refer to Table 1.3 of
Chapter-1 of TS, Vol-IV) after certification by the Contractor and acceptance of the
Engineer that the sub-systems and systems, including all equipment have
successfully completed the test procedures, and have been set-to-work and
submission of all test results and other documentation, as described in the
specifications. Balance 20% of each Section shall be released after completion of
all Sections and integration of the entire Works under this Contract.
1.11.16 Prices for Tools and Plant shall be full compensation for supplying all tools, special
tools and special test instruments and equipment in accordance with the
specifications as per supply schedule described in Chapter-9 of TS. Compensation
shall include provision of tools etc., as required by the specifications, complete in
every respect with operating instructions as necessary. Payment shall be made
when all tools have been delivered to the Employer and accepted by the Engineer.
Full payment shall be made on completion of supply for each stage.
1.11.17 Prices for spares shall be full compensation for supplying the spare parts for the
equipment, sub-systems, and systems provided under the Contract in accordance
with the specifications as per supply schedule described in Chapter-9 of TS.
Compensation shall include provision of spare parts and lists as required by the
specifications, complete in every respect, fully catalogued and marked for
identification purposes for each discipline and to the approval of the Engineer.
Payment shall be made when all spare parts and associated documentation have
been delivered to the Employer and accepted by the Engineer. Full payment shall
be made on completion of supply for each stage.
1.11.18 Compensation for Employer’s Facilities shall include all costs incurred in provision
of Principal Office, site office, furniture, office equipment and support staff as
described in Chapter-5 of TS. Payment shall be made on the basis of 60% on
delivery of all these facilities and balance 40% after the completion of Defect
Notification Period.
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
o Testing & commissioning of all above
equipment’s
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
disconnectors with grounding switch,SF6 gas
monitoring system for complete bay, LCC,
Accessories with GIS etc,
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
including all accessories
o Current transformer for tank protection
o Mounting rails and oil retaining materials and
equipment
o RTCC Panel including Automatic voltage
regulator
o Fittings & other components for completion of
Power Transformer
Erection & Commissioning:
o Erection of all above equipment
o Laying power and control cable
o Testing & commissioning of all above
equipment’s including oil filtration
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
o Laying of earth mat as per approved design
o Laying of earth risers as per approved design
o Laying of interconnections, welding/brazing
etc.
o Testing & commissioning of earth mat
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
commissioning of circuit breaker
ACDB
o Copper bus bar as per specification
o Protection circuit breakers
o Outgoing feeders with MCBs
o Locks, interlocks and other components for
completion of job
Erection & Commissioning:
o Erection of above equipment’s
o Testing & commissioning of above
equipment’s
BOQ Item
Item No. Explanation BOQ Bill Nos.
Description
o Locks, and other components for completion
of job
Erection & Commissioning:
o Installation & placement of above
equipment’s
o Testing & commissioning of above
equipment’s if required
2.3 33 kV Cables
2.3.1 The Bill of Quantity for Yellow Line of 33 KV HT Cables is presented in BOQ Bill
Nos. IN-2.1. For detailed specifications chapter 13 of TS Vol-IV shall be referred
to.
2.3.2 Following notes are explanation of the items under these Bill Nos.:
Explanation
Item No. BOQ Item Description
BOQ Bill Nos. IN -2.1,
A 33 KV CABLES
Explanation
Item No. BOQ Item Description
BOQ Bill Nos. IN -2.1,
Switchgear interlocking including glands and copper
lugs
o Straight Through Joint kit for all phases
o Termination kit for all phases
o HDPE/GI Pipe, Sand, RCC slabs, warning
tape
o Route markers, warning tapes and boards
o Any mounting arrangement, G I Structures
o HDPE Pipe and clamps
o Other components like Cables Brackets,
Channel, angles etc. for completion of Job
Erection & Commissioning:
o Construction of open trenches, trenchless
drilling, laying of HDPE pipes and other
activities required for laying of cables
o Laying of cable, erection of accessories
and all components as indicated above
o Appropriate sealing of cutout as per
specifications and drawings
o Testing & commissioning of cable &
accessories
Explanation
Item No. BOQ Item Description
BOQ Bill Nos. IN -2.1,
lugs.
o Heat shrinkable Termination kit for all
phases
o Heat Shrinkable Straight Through Joints for
all phases
o Barricades, bridges over nallah
o HDPE/GI Pipe, Sand, RCC slabs, warning
tape
o Route markers, warning tape and boards
o Mounting arrangement on panel end
o Other components like Trefoil clamps,
Heavy duty lugs, Cable Brackets on
Viaduct and Platform, Anchor Fasteners,
Channel, angles, phase marking/Tags etc.
for completion of Job
Erection & Commissioning:
o Laying of cable, erection of accessories
and all other components as indicated
above
o Cable sealing arrangement as per
specification
o Appropriate sealing of cutout as per
specifications and drawings
o Testing & commissioning of cable &
accessories
Explanation
Item No. BOQ Item Description
BOQ Bill Nos. IN -2.1,
o Control cables for protection and
interlocking including glands and copper
lugs.
o Heat shrinkable Termination kit for all
phases
o Heat Shrinkable Straight Through Joints for
all phases
o Mounting arrangement on panel end
o Other components like Trefoil clamps,
Heavy duty lugs, Cable Brackets on
Viaduct and Platform, Anchor Fasteners,
Channel, angles, phase marking/Tags etc.
for completion of Job
Erection & Commissioning:
o Laying of cable, erection of accessories
and all other components as indicated
above
o Appropriate sealing of cutout as per
specifications and drawings
o Testing & commissioning of cable &
accessories
A.3.2 Supply, laying, testing Same as above item except that cables and
and commissioning of joint / termination kits shall be FRLSOH type
33 kV Cables and for underground sections instead of FRLS
connections for type
ASS/TSS for
underground sections
Explanation
Item No. BOQ Item Description
BOQ Bill Nos. IN -2.1,
o 33KV Cable as per specification for
connection from 33 KV CB to Traction
Transformer in TSS
o 33 KV Cable consists of 3 cables for one
circuit
o Termination kit for all phases.
o Mounting arrangement on CB end and
transformer end
o Cable support arrangements, GI Structures
o Other components like Cables Brackets,
Channel, angles etc. for completion of Job
Erection & Commissioning:
o Laying of cable, erection of accessories
and all components as indicated above
o Testing & commissioning of cable &
accessories
A.4.2 Supply, laying, testing Same as above item except that cables and
and commissioning of joint / termination kits shall be FRLSOH type
33kV Cables and for underground sections instead of FRLS
connections from 33 kV type.
CB to Transformer for
underground sections
Explanation 33 kV Switchgear
Item No. BOQ Item Description
BOQ Bill Nos. IN -3.1
A.1.1 Supply and erection Supply and erection including testing and
including testing and commissioning of Three panel boards of
commissioning of a set Vacuum CBs
of three panel boards Supply:
o 3 panels, 3 pole 33 kV switchboard
Explanation 33 kV Switchgear
Item No. BOQ Item Description
BOQ Bill Nos. IN -3.1
consisting of one incoming, one outgoing
and one Aux. Transformer feeder Vacuum
circuit breaker
o Protection relays as per specification
o CTs, PTs as per specifications
o Mounting channels/Support, if required
o Fire protection system as per Specifications
o Padlocks, Fittings & other components for
completion of Job
o CB withdrawal Trolley two numbers.
Erection:
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
A.1.2 Supply and erection Supply and erection including testing and
including testing and commissioning of four panel boards of
commissioning of a set Vacuum CBs
of four panel boards
Supply:
o 4Panels, 3 pole 33 kV switchboard
consisting of one incoming, one outgoing
and two Aux. Transformer feeder Vacuum
circuit breaker
o Protection relays as per specification
o CTs, PTs as per specifications
o Mounting channels if required
o Fire protection system as per Specifications
o Padlocks, Fittings & other components for
completion of Job
o CB withdrawal Trolley two numbers
Erection:
Explanation 33 kV Switchgear
Item No. BOQ Item Description
BOQ Bill Nos. IN -3.1
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
A.1.3 Supply and erection Supply and erection including testing and
including testing and commissioning of Six panel boards of Vacuum
commissioning of a set CBs
of Six panel boards
Supply:
o 6 panels, 3 pole 33 kV switchboard
consisting of one incoming, Two outgoing,
for other ASS/TSS on the station and three
Transformer feeder Vacuum circuit breaker
o Protection relays as per specification
o CTs, PTs as per specifications
o Mounting channels if required
o Fire protection system as per Specifications
o Padlocks, Fittings & other components for
completion of Job
o CB withdrawal Trolley two numbers
Erection:
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
A.1.4 Supply and erection Supply and erection including testing and
including testing and commissioning of nine panel boards of
commissioning of a set Vacuum CBs
of Nine panel boards
Supply:
o 9 panels, 3 pole 33 kV switchboard
consisting of two incoming, two outgoing,
two Aux. Transformer feeder, two traction
transformer and one bus coupler Vacuum
circuit breaker
o Protection relays as per specification
o CTs, PTs as per specifications
Explanation 33 kV Switchgear
Item No. BOQ Item Description
BOQ Bill Nos. IN -3.1
o Mounting channels if required
o Fire protection system as per Specifications
o Padlocks, Fittings & other components for
completion of Job
o CB withdrawal Trolley two numbers
Erection:
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
A.1.5 Supply and erection Supply and erection including testing and
including testing and commissioning of Eleven panel boards of
commissioning of a set Vacuum CBs
of Eleven panel boards
Supply:
o 11 panels, 3 pole 33 kV switchboard
consisting of Two incomer from RSS, two
incoming, two outgoing for ring circuit, two
Aux. Transformer feeder, two future CBs
and one bus coupler Vacuum circuit breaker
o Protection relays as per specification
o CTs, PTs as per specifications
o Mounting channels if required
o Fire protection system as per Specifications
o Padlocks, Fittings & other components for
completion of Job
o CB withdrawal Trolley two numbers
Erection:
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
A.1.6 Supply and erection Supply and erection including testing and
including testing and commissioning of one panel boards of
commissioning of a set Vacuum CBs
of One panel board
Supply:
between Inverter
Explanation 33 kV Switchgear
Item No. BOQ Item Description
BOQ Bill Nos. IN -3.1
transformer to 33KV o 1 panel, 3 pole 33 kV VCB
Supply
o Protection relays as per specification
o CTs, PTs as per specifications
o Mounting channels if required
o Fire protection system as per Specifications
o Padlocks, Fittings & other components for
completion of Job
o CB withdrawal Trolley two numbers
Erection:
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
A.1.1 Supply and erection Supply and erection including testing and
including testing and commissioning of 33kV/415V, 500kVA Dry Type
commissioning of Transformers
33kV/415V, 500kVA
Supply:
Dry Type
Transformers o Auxiliary transformer along with enclosure
o Neutral CT
o Mounting rails
o Temperature sensor, alarm and trip modules
o Fire protection system as per Specifications
o Fittings & other components for completion of
job
A.1.2 Supply and erection Supply and erection including testing and
including testing and commissioning of 33kV/415V, 2500 kVA Dry
commissioning of Type Transformers
33kV/415V, 2500 kVA
Supply:
Dry Type
Transformers o Auxiliary transformer along with enclosure
o Neutral CT
o Mounting rails
o Temperature sensor, alarm and trip modules
o Fire protection system as per Specifications
o Fittings & other components for completion of
job
Erection:
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
A.1.3 Supply and erection Supply and erection including testing and
including testing and commissioning of 33kV/415V, 2000kVA Dry
commissioning of Type Transformers with forced Ventilation.
33kV/415V, 2000 kVA
Supply:
Dry Type
Transformers in Depot o Auxiliary transformer along with enclosure
ASS1. o Neutral CT
o Mounting rails
o Temperature sensor, alarm and trip modules
o Fire protection system as per Specifications
o Fittings & other components for completion of
job
Erection:
o Erection of all above equipment
B AUXILIARIES
B.2 ACDB
B.3 DCDB
C CABLES
D SS MANNING
Explanation TSS
Item No. BOQ Item Description
BOQ Bill Nos. IN-5.1
A.2 RECTIFIER
Explanation TSS
Item No. BOQ Item Description
BOQ Bill Nos. IN-5.1
A.3 HSCB
Explanation TSS
Item No. BOQ Item Description
BOQ Bill Nos. IN-5.1
including testing and o 8 panel, 1 pole 900 V DC switchboard
commissioning of Eight consisting of two incomer circuit breaker, four
panel boards HSCB third rail feeding circuit breaker, two stinger
including two incomers feeding circuit breaker
and six outgoing
o Current and Voltage sensor per specifications
feeders
o Elevated platform structure for mounting of
Switches
o Fire protection system as per Specifications
o Padlocks, Fittings & other components for
completion of Job
Erection & Commissioning:
o Construction of raised platform for mounting of
switchboard in at grade/elevated corridor
stations
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
Explanation TSS
Item No. BOQ Item Description
BOQ Bill Nos. IN-5.1
equipment’s
A.5 Over voltage protection device (OVPD), Portable SCD, VD & 4 Pole
Motorized SCD.
Explanation TSS
Item No. BOQ Item Description
BOQ Bill Nos. IN-5.1
A.5.3 Voltage Detector Supply of Voltage detector suitable for 3rd Rail
Voltage detection for each station and Depot.
A.5.4 4 Pole Motorized SCD o Four pole motorized short circuit and earthing
panel along with all necessary accessories as
per specifications.
o All necessary cable along with terminations
(Power & Control) shall we consider (FRLS for
Elevated/At-Grade and FRLSOH for
Underground Stations)
o Fittings and other components for completion
of job as per specifications.
o Floor and insulation mats of appropriate voltage
rating for placement of DC Equipments
Erection & Commissioning:
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
Explanation TSS
Item No. BOQ Item Description
BOQ Bill Nos. IN-5.1
A.8 INVERTER
Explanation TSS
Item No. BOQ Item Description
BOQ Bill Nos. IN-5.1
o Fittings & other components for completion of
job
Erection & Commissioning:
o Erection of all above equipment
o Testing & commissioning of all above
equipment’s
Explanation TSS
Item No. BOQ Item Description
BOQ Bill Nos. IN-5.1
o Mounting arrangement at HSCB, rectifier
o Other components for completion of Job
Erection & Commissioning:
o Laying of cable, erection of accessories and all
components as indicated above
o Appropriate sealing of cutout as per
specifications and drawings
o Testing & commissioning of cable &
accessories
B.2.2 Supply, laying, Same as above item except that cables and joint
termination, testing and / termination kits shall be FRLSOH type for
commissioning of underground sections instead of FRLS type.
1Cx400 sqmm
FRLSOH unarmoured
DC Cable for DC feeder
circuit in the
underground stations &
tunnel
Explanation TSS
Item No. BOQ Item Description
BOQ Bill Nos. IN-5.1
o Testing & commissioning of cable &
accessories
B.3.2 Supply, laying, testing Same as above item except that cables and joint
and commissioning of / termination kits shall be FRLSOH type for
1Cx400sqmm DC underground sections instead of FRLS type.
negative cable and
connection for DC
return circuit in the
underground sections
and stations.
B.4.2 Supply, laying, testing Same as above item except that cables and joint
and commissioning of / termination kits shall be FRLSOH type for
1Cx400sq.mm Cables underground sections instead of FRLS type.
for interconnection of
casings / frame etc. of
HSCB panel, NR panel,
bypass panel, frame
leakage relay etc. for
underground TSSs
Explanation TSS
Item No. BOQ Item Description
BOQ Bill Nos. IN-5.1
B.5.2 Supply, laying, testing Same as above item except that cables and joint
and commissioning of 1 / termination kits shall be FRLSOH type for
x 1C x 630 sqmm XLPE underground sections instead of FRLS type.
FRLSOH Al Cables for
parallel track feeder
connected to track
every 250 m, including
two cross bonds every
250 m between rails &
Track
A THIRD RAIL
B STINGER SYSTEM
C Floating Depot
2.9 SCADA
2.9.1 The Bill of Quantity for Yellow Line of SCADA is presented in BOQ Bill Nos. IN-8.1.
For detailed specifications, Chapter 18 of TS Vol-IV shall be referred to.
2.9.2 Following notes are explanation of the items under these Bill Nos.:
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
A.1 Servers
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
One Set of this item shall essentially
include but not limited to the following:
o Two SCADA Communication
Servers (one main & one standby)
o Basic Software’s (OS, All Drivers,
MS office etc.)
o Antivirus software with 5 years of
license subscription from the date
of commissioning
o 1 No. 24" LED Monitor with
Keyboard and Mouse for each set
of servers
o 1 No. KVM switch with cables &
connectors for Monitor, Mouse &
Keyboard interface for each set of
servers.
o Any other
components/accessories required
for completion of the works.
Erection/Installation: -
o Installation of Servers and
Powering-up
o Installation of all Software’s,
updates & patches
o Network Connectivity &
Network configuration/setup
o Communication interface of
Servers over OFC backbone with
RTUs
Testing & Commissioning: -
o Testing & commissioning of
above equipment’s
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Professional, Antivirus Software redundant configuration needed for
& External Bulk Storage for Data storage & handling the complete
and Software Back-up System) database & for the control &
monitoring of electrical installations
included in the scope of work, from
the OCC.
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
updates & patches
o Network Connectivity &
Network configuration/setup
Testing & Commissioning
o Testing & commissioning of
above equipment’s
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
One Set of this item shall essentially
include but not limited to the following:
o One SCADA Server
Erection/Installation: -
o Installation of Server and
Powering-up
o Installation of all Software’s,
updates & patches
o Network Connectivity &
Network configuration/setup
Testing & Commissioning: -
o Testing & commissioning of
above equipment’s
A.2 Workstations
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
2. Disturbance Recorder
3. workstation for Depot control
center
One Set of this item shall essentially
include but not limited to the following:
o One Workstation Computer
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Telecom OFC backbone.
o Patch Cables RJ 45 / FO
o Any other
components/accessories required
for completion of the works.
Erection
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
o Installation of all networking
devices and Powering-up
o Laying and connection of
communication cables
o Network Connectivity & network
configuration.
o FO cable testing for connectivity
of SCADA communications
equipment’s with OFC backbone
Testing & Commissioning: -
o Testing & commissioning of
above equipment
o Any other
components/accessories required
for completion of the works.
Erection: -
o Installation of all networking
devices and Powering-up
o Network Connectivity &
configuration of Firewall
Testing & Commissioning: -
o Testing &commissioning of
above equipment
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
o 19” Server Rack
o Any other
components/accessories required
for completion of the works
Erection & Commissioning: -
o Roller chairs
o Any other
components/accessories required
for completion of the works.
Erection & Commissioning: -
o Installation of furniture
A.6 Printers
o Any other
components/accessories required
for completion of the works.
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Erection & Commissioning: -
o Installation of printer and
powering up
LaserJet Colour A4/A3
A.6.2 Supply: -
This item shall include, but not
limited to the following:
o A4/A3 LaserJet printer – 1 No.
o Any other
components/accessories required
for completion of the works.
Erection & Commissioning: -
o Installation of printer and
powering up
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
license subscription from the date
of commissioning
o SCADA Training Simulator
Software with license for One no.
Trainer, Three nos. Trainee’s and
One no. Training RTU.
o Any other
components/accessories
required for completion of the
works.
Erection & Commissioning: -
o Installation of server, workstation,
monitor, network equipment &
Training RTU and Powering-up
o Installation of all Software,
updates & patches
o Installation of software in Training
Simulator server & workstations
o Training Simulator software
configuration, Engineering and
Development
o Network Connectivity &
configuration/setup
o Earthing of Training RTU with
MET
o Laying of input power supply
cables up to RTU and other
communication cables
o RTU Programming, Development
of database, HMI, logics, events,
alarms, interlockings and any
other functional requirement
under the technical specification
etc. as per Training Simulator
system requirements.
o Testing & commissioning of
Training Simulator setup.
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
and testing and commissioning
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
limited to the following:
o 1 No. Central Evaluation System
o Any other
components/accessories required
for completion of the works
Erection/Installation: -
• Installation of Central Evaluation
System and Powering-up
o Installation of all Software’s,
updates & patches
o Network Connectivity &
configuration/setup
o SCMS Software configuration,
Engineering and development
o Shall engage specialist to perform
the rail resistance measurement
as well as the track to structure
conductance measurement as
given in EN 50122-2-2010.
Testing & Commissioning: -
o Testing and commissioning of the
system
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
o Any other
components/accessories required
for completion of the works.
Erection/Installation: -
o Installation of software in all
servers, workstations and video
wall controllers
o SCADA software
configuration, Engineering and
Development
Testing & Commissioning: -
o I/O signals testing and
commissioning with field
equipment’s
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
reporting.
This item essentially includes but not
limited to the following:
o Complete set of software with
licenses for the concerned Line
Main OCC
o Any other
components/accessories required
for completion of the works
B.1 Servers
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Server
o Basic Software’s (OS, All Drivers,
MS office etc.)
o Antivirus software with 5 years of
license subscription from the date
of commissioning
o 1 No. 24" LED Monitor with
Keyboard and Mouse
o Any other
components/accessories required
for completion of the works.
Erection/Installation: -
o Installation of Server and
Powering-up
o Installation of all Software’s,
updates & patches
o Network Connectivity &
Network configuration/setup
o Communication interface of
Server over OFC backbone with
RTUs
Testing & Commissioning: -
o Testing & commissioning of
above equipment’s
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Application Server
o Basic Software’s (OS, All Drivers,
MS office etc.)
o RDBMS Software
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
o Patch Cables RJ 45 / FO
o Any other
components/accessories required
for completion of the works.
Erection/Installation: -
o Installation of all networking
devices and Powering-up
o Laying and connection of
communication cables
o Network Connectivity & network
configuration.
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
o FO cable testing for connectivity
of SCADA communications
equipment with OFC backbone
Testing & Commissioning: -
o Testing & commissioning of
above equipment
o Any other
components/accessories required
for completion of the works.
Erection /Installation: -
o Installation of all networking
devices and Powering-up
o Network Connectivity &
configuration of Firewall
Testing & Commissioning: -
o Any other
components/accessories required
for completion of the works.
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Erection & Commissioning: -
o Installation of server rack
o Roller chairs
o Any other
components/accessories required
for completion of the works.
Erection & Commissioning: -
o Installation of furniture
B.5 Printers
LaserJet Colour A4/A3
B.5.1 Supply: -
This item shall include, but not
limited to the following:
o A4/A3 LaserJet printer – 1 No.
o Any other
components/accessories required
for completion of the works.
Erection & Commissioning: -
o Installation of printer and
powering up
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
equipment and shall essentially
include and but not limited to the
following:
o Supply of power cables
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Development
Testing & Commissioning: -
o I/O signals testing and
commissioning with field
equipment
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Erection/Installation: -
o Installation of RTU
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
subsequent distribution inside
panel
o Redundant OFC communication
cables and accessories (Switches
LIU, FO Patch chords etc.) for
linking RTU to TER.
o Communication cables for
interconnection with Relays (at
designated port in switchgear
panel), Energy meters.
o 20% spare I/O signals capacity or
min. 1spare card shall be
provided for each type of module.
o Any other
components/accessories required
for completion of the works.
Erection /Installation: -
o Installation of RTU
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
testing with OCC/BCC.
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
to TER
o Laying of communication cables
for interconnection with relays,
Energy meters
o RTU Programming, Development
of database, HMI, logics, events,
alarms, interlockings and any
other functional requirement
under the technical specification
etc. for the power installation &
integration with OCC/BCC
Testing & Commissioning: -
o I/O signals testing and
commissioning with power supply
equipment’s and integrated
testing with OCC/BCC
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
interconnection with Relays (at
designated port in switchgear
panel), Energy meters
o 20% spare I/O signals capacity or
min. 1 spare card shall be
provided for each type of module.
o Any other
components/accessories required
for completion of the works.
Erection /Installation-
o Installation of RTU
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
drawing.
o Processor/CPU Card, Power
Supply Card, Communication
cards etc. all in redundant Hot-
Standby configuration
o All applicable Input-Output
modules & Transducers etc.
o Power Supply Converter &
subsequent distribution inside
panel
o Redundant OFC communication
cables and accessories
(Switches, LIU, FO Patch chords
etc.) for linking RTU to TER.
o Communication cables for
interconnection with Relays (at
designated port in switchgear
panel), Energy meters
o 20% spare I/O signals capacity or
min. 1 spare card shall be
provided for each type of module.
o Any other
components/accessories required
for completion of the works.
Erection /Installation-
o Installation of RTU
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
other functional requirement
under the technical specification
etc. for the power installation &
integration with OCC/BCC
Testing & Commissioning: -
I/O signals testing and commissioning
with power supply equipment’s and
integrated testing with OCC/BCC
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
for completion of the works.
Erection/Installation: -
o Installation of RTU
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
o One Workstation Computer
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
o One Workstation Computer
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
Engineering and Development
Testing & Commissioning: -
o I/O signals testing and
commissioning with field
equipment’s at RSS level
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
o Roller chairs
o Any other
components/accessories required
for completion of the works.
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
with Engineer in-charge for the design
and material to be used.
o Any other
components/accessories required
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
for completion of the works
Erection & Commissioning: -
Installation of printer and powering up
following:
o A4/A3 LaserJet printer – 1 No.
o Any other
components/accessories required
for completion of the works
Erection & Commissioning: -
o Installation of printer and
powering up
o Any other
components/accessories required
for completion of the works.
Erection: -
o Installationof all networking
devices and Powering-up
o Network Connectivity &
configuration of Firewall
Testing & Commissioning: -
Testing &commissioning of
above equipment
G Design, supply, installation, This item includes the price for Design,
testing and commissioning of supply, installation, testing and
communication equipment’s commissioning of communication
(Ethernet switches, Patch cable, equipment’s (Ethernet switches, Patch
Lan cable, routers, firewall for cable, Lan cable, routers, firewall for
Explanation SCADA
Item No. BOQ Item Description
BOQ Bill No. IN-8.1
secure wireless communication secure wireless communication if
if required) / servers/ gateway/ required) / servers/ gateway/
workstations/ required for workstations/ required for control and
control and monitoring. monitoring from OCC.
2.10 General
2.10.1 The Bill of Quantity for General Requirement is presented in BOQ Bill Nos. IN-9.1.
2.10.2 Following notes are explanation of the items under these Bill Nos.:
B.1 Review of Designs and o This items shall cover the cost of review
preparation of shop of designs of Employer
drawings
o The price shall include the cost of other
drawings to be prepared by the
contractor as specified in Chapter 6 of
TS Vol-IV
F.1 SPARES
G.1 Employer’s facility o The price under this item shall include
H.1 Viaduct Lighting o This item shall cover the viaduct lighting
as specified in Chapter 11 of TS Vol-IV
of Employer’s requirement
o The price under this item shall include
the cost of supply and erection of light
fittings including all accessories
o The price shall also include the cost of
supplying and erection of Cables and
cable connection/ termination kit from
the appropriate station panel, suitable
for carrying the current required by the
Lighting arrangement.
2.11 Civil and Building Works including Electrifications Works for RSS & TSS
2.11.1 The Bill of Quantity for RSS Civil & Electrification works is presented in BOQ Bill
No.IN-10. Chapter 12 of RSS to be referred to. Following notes are explanation of
the items under the Bill No. IN-10.
2.11.2 For civil works, the scale layout drawings of respective RSS may be referred to, as
provided in Tender Drawings Vol-VI.
IN-10.1 Architectural Works for Design, Supply & construction work in all
RSS respect related to the following as per
&
specification and drawings –
10.1(a)
o Brick Works
o Stone Works
o Metal Work
o Steel Works
o Flooring
o Finishing
o Roofing
10.2 & Structural Works RSS Design, Supply& construction work in all
respect related to the following as per
10.2(b)
specification and drawings –