RAM-TVL11 Technical Drafting
RAM-TVL11 Technical Drafting
RAM-TVL11 Technical Drafting
TVL – ICT
TECHNICAL DRAFTING 00
REGIONAL ACHIEVEMENT MEASURE (RAM)
1. One of the most important skills that a student must gain to draft a
quality floor plan is to select drafting tools, materials and equipment in
accordance with the standard operating procedures (SOPs). Therefore,
what is the BEST instrument to use in dividing lines into equal parts?
A. Compass
B. Divider
C. Protractor
D. Ruler
A. Foundation Plan
B. Electrical Plan
C. Construction Notes
D. General Notes
A. Security Specialist
B. Disease Prevention Specialist
C. Fire and Crime Prevention Officers
D. Injury Prevention Specialist and Safety Specialist
RAM-TVL-TECHNICAL DRAFTING 10 | 1
4. Teacher Tony is preparing the class for a drawing layout activity. He
showed to the class samples of different drafting tools, materials, and
equipment required in the preparation of architectural layout and
details. Which of the following drafting tools must a student use to
enlarge or reduce an object or drawing measurements of proportion on
a drawing paper?
A. Compass
B. Triangular Scale
C. T-Square
D. Protractor
A. Dimension Line
B. Object Line
C. Extension Line
D. Diagonal Line
A. Drilling
B. Quarrying
C. Soil erosion
D. Soil compression
7. There are two systems of measurement used in drafting the floor plan.
If a draftsman uses a scale of 1:100, what system of measurement
must was used?
A. Centimeter
B. English System
C. Meter
D. Metric System
RAM-TVL-TECHNICAL DRAFTING 10 | 2
8. After the main structural framework of the dwelling unit was finished,
what would you build next based on standard sequence of
construction?
A. Ceiling
B. Flooring
C. Stairway
D. Wall construction
10. What is the difference between a roof plan and a roof framing plan?
11. What is the minimum vertical clear dimension from floor to ceiling
per National Building Code of the Philippines?
A. 2.10 meters
B. 1.80 meters
C. 210 centimeters
D. 180 millimeters
A. Lighting symbols
B. Plumbing fixtures
C. Electrical Circuit
D. Firefighting system
RAM-TVL-TECHNICAL DRAFTING 10 | 3
13. An elevation drawing is an orthographic projection of a side of a
building. Which of the following sides of the building are being
elevated?
14. What is being referred as the required distance separation from the
property line to any part of the building structure?
A. Building setback
B. Building elevation
C. Building section
D. Building roof eaves
15. What do you call to a line drawn in a layout view that indicates where
the object will be cut?
A. Plane Line
B. Cutting Line
C. Cutting Plane Line
D. Cutting Knife
RAM-TVL-TECHNICAL DRAFTING 10 | 4
18. Building foundations are important in construction. What foundation
failure will result if the shear stress in soil exceeds the shear strength
of the soil?
19. What is used as reference when drawing framing plans for each floor?
A. Elevation
B. Floor Plan
C. Foundation
D. Section
20. A horizontal structure usually to support the roof and floors systems.
A. Columns
B. Rafters
C. Beams
D. Slab
22. While working on an electrical lay-out, Ismael has to consider the type
of smoke detectors to be placed in a certain area of the house. Which
smoke detector is best installed in or near each bedroom which uses a
very small quantity of radioactive material?
A. Ionization-type detector
B. Photoelectric-type detector
C. Fire detector
D. Fire sprinkler
RAM-TVL-TECHNICAL DRAFTING 10 | 5
23. What symbol is being represented below?
A. Check Valve
B. Wrong Valve
C. Gate valve
D. Ball Valve
A. Mechanical Code
B. Electrical Code
C. Plumbing Code
D. National Building Code
A. Keyboard
B. Keypad
C. Printer
D. Hard Disk Drive
RAM-TVL-TECHNICAL DRAFTING 10 | 6
28. A storm drainage plan is a network of structures, channels, and
underground pipes that carry storm water (rain water) to ponds,
lakes, streams, and rivers. Why is a storm drainage plan necessary?
A. Drainage plan will ensure that water can reach where it needs to go
without flooding.
B. Drainage will guide the water to the system until it reaches the
ocean where it doesn’t flood in the ocean.
C. It will ensure that the water is not wasted while it travels.
D. Ensure compliance to safety protocols and water system.
29. Some of the most important parts of your HVAC system are your heat
exchanger, blower motor, combustion chamber, condenser, evaporator,
and thermostat. Which of the following parts works as a heat absorber
and warms cool air when your thermostat activates?
A. Condenser
B. Evaporator
C. Heat Chamber
D. Heat Exchanger
30. What toolbar contains a set of tools used to revise drawn objects?
A. Draw Toolbar
B. Modify Toolbar
C. Format Menu
D. Layout Menu
RAM-TVL-TECHNICAL DRAFTING 10 | 7
34. Which of the following is a planned system of working to prevent
illness and injury in the workplace?
A. Occupational Hazard and Safety
B. Occupational Health and Safety
C. Occupational Jobs and Safety
D. Occupational Risk and Safety
38. Model tab allows drawing objects in true scale while Layout tab
allows for drawn objects to scale.
A. True
B. False
C. Maybe
D. It is a myth.
39. When printing in black and white output, what plot style table is
being used?
A. acad.ctb
B. grayscale.ctb
C. monochrome.ctb
D. fill patterns.ctb
RAM-TVL-TECHNICAL DRAFTING 10 | 8
40. In Layer Properties Manager, what command allows you to create
different line thickness for each layer?
A. Linetype
B. Lineweight
C. Plot
D. Color
43. What is being drawn in the structural layout as reference for site
layout and actual construction?
A. Grids
B. Line
C. Circles
D. Code
RAM-TVL-TECHNICAL DRAFTING 10 | 9
46. In truss detail drawing, the abbreviation TC means
A. Total Center
B. Top Chord
C. Top Center
D. Total Centimeter
47. In drawing electrical lighting circuit layout, what does the symbol
below is representing?
A. Ceiling Light Outlet
B. Ceiling Light Bulb
C. Wall Light Outlet
D. Wall Light Bulb
48. In drawing electrical lighting circuit layout, what does the symbol
below is representing?
A. Ceiling Light Outlet
B. Ceiling Light Bulb
C. Wall Light Outlet
D. Wall Light Bulb
49. In drawing fire alarm and protection system, what does the symbol
below represents?
A. Fire Alarm
B. Fire Extinguisher
C. Fire Retardant
D. Fire Suppressor
RAM-TVL-TECHNICAL DRAFTING 10 | 10