Professional Documents
Culture Documents
General Method Statement For Concrete Protective Coating For Immersion Service APCS-3 RevNeil
General Method Statement For Concrete Protective Coating For Immersion Service APCS-3 RevNeil
PLANT LOCATION
Doc. No. 000-ZA-E-T09410
Khurais– SAUDI ARABIA
General Method Statement for Concrete
Rev. A 15-FEB-18
Protective Coating for Immersion Service APCS-3
1: Approved
2: Approved with comments
CONTRACTOR review result 3: Rejected
by Date Name Signature
1 2 3
Page | 1
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite GOSP JOB
Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09410
Khurais– SAUDI ARABIA
General Method Statement for Concrete
Rev. A 15-FEB-18
Protective Coating for Immersion Service APCS-3
Issued for Jaycy Yutuc Readolf Fedelin Rubenel Javier Ahmad Shibi Abdullah Hani
A 15-Feb-18
Review QCDC HSE Mngr. QC Mngr Const.Mngr. Proj. Dir.
Rev Description Prepared Checked Checked Approved Approved Date
Page | 2
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite GOSP JOB
Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09410
Khurais– SAUDI ARABIA
General Method Statement for Concrete
Rev. A 15-FEB-18
Protective Coating for Immersion Service APCS-3
Table of Contents
1. PURPOSE-------------------------------------------------------------------------------------------------- 4
2. SCOPE------------------------------------------------------------------------------------------------------ 4
5. GENERAL REQUIREMENTS----------------------------------------------------------------------------- 4
7. RESPONSIBILITY------------------------------------------------------------------------------------------ 7
8. LIST OF EQUIPMENT------------------------------------------------------------------------------------ 8
9. QA/QC DOCUMENTATION---------------------------------------------------------------------------- 8
11. ATTACHMENTS------------------------------------------------------------------------------------------- 10
Page | 3
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite GOSP JOB
Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09410
Khurais– SAUDI ARABIA
General Method Statement for Concrete
Rev. A 15-FEB-18
Protective Coating for Immersion Service APCS-3
1. PROJECT DESCRIPTION
This method statement describes the usage and installation of concrete protective coating for
Immersion Service with Coal Tar Epoxy Coating System APCS-3
2. SCOPE
This method statement covers concrete protective coating for Immersion Service with Coal Tar
Epoxy Coating System APCS-3
4. REFERENCE DOCUMENTS/DRAWINGS
5. GENERAL REQUIRMENTS
All surfaces shall be sound, free of grease, oil and any imperfection or any other major
defects. All defects shall be repaired prior applying any paint material.
Page | 4
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite GOSP JOB
Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09410
Khurais– SAUDI ARABIA
General Method Statement for Concrete
Rev. A 15-FEB-18
Protective Coating for Immersion Service APCS-3
Page | 5
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite GOSP JOB
Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09410
Khurais– SAUDI ARABIA
General Method Statement for Concrete
Rev. A 15-FEB-18
Protective Coating for Immersion Service APCS-3
All detailing of the work system shall be carried out in accordance with the
manufactures requirements, and as per the drawing for the project.
Material receiving shall be done with proper documents, only inspected and
approved batch material shall be used for execution purpose.
The coating shall be applied after the full curing time of concrete in accordance to
SAES-Q-001. New concrete must have a moisture content of 4% or less before the
coating applications commence.
The coating personnel shall have on site, all times, the necessary proper calibrated
and maintained testing and inspection instrument, which are available to conduct
test and surveillance of the work.
Spray/application equipment shall be designed to accurately ratio and apply
specified protective coating materials and shall be properly maintained in proper
working condition.
Prior to the coating application, dew point and relative humidity shall be measured,
reading shall be every 4 hours. The work shall not proceed if the substrate
temperature shall be less than 3 deg C (5 deg F) above dew point.
Spray coating shall not be carried out if, adverse weather conditions exist such as,
but not restricted to, the following:
Wind is strong enough to blow sand, salt spray, or other foreign matter onto
the surface being coated.
Wind is strong enough to cause dry spray or to otherwise seriously disturb
the spray pattern when application is by spray gun.
Only SAEP 316 approved applicator will be allowed to perform coating application.
The protective coating shall be applied directly after the concrete surface
preparation.
Epoxy coating material shall be applied with uniform appearance and no visible
holes. Dry Film thickness will meet the requirement of SAES-H-101, APCS-3.
Page | 6
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite GOSP JOB
Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09410
Khurais– SAUDI ARABIA
General Method Statement for Concrete
Rev. A 15-FEB-18
Protective Coating for Immersion Service APCS-3
7. RESPONSIBILITY
Project Manager
Project Manager will be responsible For the Overall implementation and monitoring of all
activities in the method of statement for CONCRETE PROTECTIVE COATING
Site Manager
Site Manager will be responsible for the overall direction, monitoring coordination and control
of all the construction activities attached and related to the CONCRETE PROTECTIVE COATING
and overall health and safety standards and procedures.
Site Engineer
Site Engineer will be responsible for the overall implementation and monitoring of all the
activities involved in CONCRETE PROTECTIVE COAINTG including safety measures and mitigation
from his work place. Application for work permits if required prior to commence of any
demolition.
Page | 7
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite GOSP JOB
Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09410
Khurais– SAUDI ARABIA
General Method Statement for Concrete
Rev. A 15-FEB-18
Protective Coating for Immersion Service APCS-3
Supervisor/Foremen
HSE Officer/Supervisor
8. LIST OF EQUIPMENTS
• Air compressor
• Air blower
• Angle grinder( with Buffing wheel)
• Generator
• Electric drill with paddle mixer
• Roller Brush
• Wire Brush
• Scraper
• Filling Knife
• Sand paper 80-100-120
• Cleaning Cloth
9. QA/QC DOCUMENTATION
Page | 8
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite GOSP JOB
Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09410
Khurais– SAUDI ARABIA
General Method Statement for Concrete
Rev. A 15-FEB-18
Protective Coating for Immersion Service APCS-3
All activities will be inspected and certified per SAIC-H-1003 Rev 8 Concrete Coatings Pre-
installation and Final Inspections
All the work force must undergo Saipem and Aramco safety induction before
commencement of their work.
Approved work procedure must be fully understood by working personnel on
site. Copy of work procedure must always be available when needed.
Work permit must issue prior to start the activity and made available at all
times. All requirements safety precautions and requirements must be put in
place prior to start the activity.
All personnel at site shall wear appropriate PPE, hard hat, safety shoes, eye
protection, hand gloves and other types of PPE applicable to their specific work.
Perimeters of work area(s) will be safety taped or barricaded; only authorized
personnel will be allowed access.
Aramco certified Work Permit Receiver shall be engaged for the permit works.
Original PTW, Method Statement and Risk Assessment and/ or JSA shall be
displayed at worksite in visible locations.
Tool Box Meetings shall be conducted and the JSA must be discussed before
starting any activity, or if there are new crew members have joined the team.
Supervisor must ensure the JSA is property understood by all member of the
working crew.
Gas testing shall be done before starting the work and in regular intervals as
tested in PTW.
Page | 9
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite GOSP JOB
Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09410
Khurais– SAUDI ARABIA
General Method Statement for Concrete
Rev. A 15-FEB-18
Protective Coating for Immersion Service APCS-3
Site Safety Representative shall be present at the job site at all times while
personnel are working.
Safety Officers shall be assigned to monitor safety condition of the work area,
and are authorized to stop any activities if the conditions at the site changed
such that to continue working would be unsafe.
No mechanical excavation where U/G utilities is close to less than 3m, only
manual excavation is permitted.
Heat stress protection.
Rest shelter shall be provided in designated area.
Cooling water shall be provided in the cooling water cans.
Cooling water cans shall be placed in the easy accessible location to all.
Heat stress protection shall be inducted in the tool box meeting regularly.
Heat index shall be displaced visible area to understand the requirement of
precaution measure as per Aramco standard.
11. ATTACHMENTS
Page | 10