PLANT LOCATION
Doc. No. 000-ZA-E-T09409
Khurais – SAUDI ARABIA
General Method Statement for Non-shrink
Rev. A 14-FEB-18
Cementitious Grout
1: Approved
2: Approved with comments
CONTRACTOR review result 3: Rejected
by Date Name Signature
1 2 3
Page | 1
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite JOB
GOSP Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09409
Khurais – SAUDI ARABIA
General Method Statement for Non-shrink
Rev. A 14-FEB-18
Cementitious Grout
Issued for Jaycy Yutuc Readolf Fedelin Rubenel Javier Ahmad Shibi Abdullah Hani
A 14-Feb-18
Review QCDC HSE Mngr. QC Mngr Const.Mngr. Proj. Dir.
Rev Description Prepared Checked Checked Approved Approved Date
Page | 2
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite JOB
GOSP Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09409
Khurais – SAUDI ARABIA
General Method Statement for Non-shrink
Rev. A 14-FEB-18
Cementitious Grout
Table of Contents
1. PURPOSE-------------------------------------------------------------------------------------------------- 4
2. SCOPE------------------------------------------------------------------------------------------------------ 4
4. REFERENCES DOCUMENTS/DRAWINGS---------------------------------------------------------- 4
6. RESPONSIBILITY---------------------------------------------------------------------------------------- 7
9. ATTACHMENTS------------------------------------------------------------------------------------------ 9
Page | 3
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite JOB
GOSP Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09409
Khurais – SAUDI ARABIA
General Method Statement for Non-shrink
Rev. A 14-FEB-18
Cementitious Grout
1. PURPOSE
The purpose of this General Method Statement is to define and describe the methodology of in
NON-SHRINK CEMENTITIOUS GROUT involved in Khurais Expansion & Satellite GOSP Project.
2. SCOPE
This method statement covers NON-SHRINK CEMENTITIOUS GROUT. This document defines
details of activities involved, quality requirements, HSE requirement, methodology and
inspection/ testing requirements.
CONTRACTOR: SAIPEM
SUBCONTRACTOR: Gecat Limited Co. [The party responsible for performing the work].
Method Statement: A written document that explains the procedure & execution of
work.
4. REFERENCE DOCUMENTS/DRAWINGS:
Page | 4
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite JOB
GOSP Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09409
Khurais – SAUDI ARABIA
General Method Statement for Non-shrink
Rev. A 14-FEB-18
Cementitious Grout
Page | 5
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite JOB
GOSP Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09409
Khurais – SAUDI ARABIA
General Method Statement for Non-shrink
Rev. A 14-FEB-18
Cementitious Grout
SAMPLING, TESTING
CURING
When the grout's water/cement ratio is 0.4 or less, the grout shall be given a
continuous water cure (covered by wet burlap and 0.15mm polyethylene) for a
minimum of 7 days. (ASTM C309, Sec. 5.1)
Curing compounds if allowed by project specifications shall have test reports or
certificate showing that it is in compliance with ASTM C309.
Page | 6
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite JOB
GOSP Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09409
Khurais – SAUDI ARABIA
General Method Statement for Non-shrink
Rev. A 14-FEB-18
Cementitious Grout
FINAL INSPECTION
The grout shall be tooled to a 45 Degree angle down from the bottom of base plates
after it has reached its initial set. (PIP STS03600, Sec. 6.3.5)
It’s the responsibilities of Sub Contractor Gecat, Quality and Safety Teams to ensure that all the
relevant requirements, specifications and standards are followed during the execution of the
work
Project Manager
Project Manager will be responsible for the overall implementation and monitoring of all
activities in the method of statement for Non-shrink Cementitious Grout.
Site Manager
Site Manager will be responsible for the overall direction, monitoring coordination and control
of all the construction activities attached and related to the Non-shrink Cementitious Grout and
overall health and safety standards and procedures.
Site Engineer
Site Engineer will be responsible for the overall implementation and monitoring of all the
activities involve in Non-shrink Cementitious Grout including safety measures and mitigation
from his work place. Application for work permits if required prior to commence of any
demolition.
Supervisor/Foremen
Page | 7
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite JOB
GOSP Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09409
Khurais – SAUDI ARABIA
General Method Statement for Non-shrink
Rev. A 14-FEB-18
Cementitious Grout
Conduct safety briefing prior to commence daily activities and give information and
guidance to newly hired workers.
Report any incident, accident, unsafe condition and defects in equipment to immediate
superiors.
Provide correct action of safety among his people i.e horse play, bullying and other
unsafe acts.
Incorporate safety procedures in routine tasks and see that they are obeyed.
Set a personal example to his people
Surveyor
Shall be responsible for the benchmarks and setting of points, including the
elevations in accordance with approved drawing reference documents.
Air compressor
Air blower
Angle grinder ( with buffing wheel)
Generator
Electric drill with paddle mixer
Roller Brush
Wire Brush
Page | 8
PROJECT / UNIT
Khurais Area Facilities Expansion & Satellite JOB
GOSP Project 032184
PLANT LOCATION
Doc. No. 000-ZA-E-T09409
Khurais – SAUDI ARABIA
General Method Statement for Non-shrink
Rev. A 14-FEB-18
Cementitious Grout
Measuring Jug
Hand Application Trowel
Scraper
Filling Knife
Safety measure during the execution of work shall be strictly implemented and observed. Gecat
Limited Co. safety department shall by then without excuses to implement the safety rules,
regulations and ensure that all personnel involve in the execution of work shall brief and explain
the implanting rules
9. ATTACHMENTS
Page | 9