Activity Hazard Analysis

Note: Workers must review the requirements of the AHA prior to starting work.
The AHA must be available at the job site during work activities.

Activity: Installation of LED lights


Project: Renovation Project – Building 102 Al Sayliyah Camp
HAZARDS
ACTIONS TO ELIMINATE OR MINIMIZE
JOB STEP HAZARDS
EACH HAZARD
1. Interference with other activities 1a. Inform affected users of planned panel outage.
1. Identify circuits 1b. Verify that efforts have been coordinated.

2. Human error 2. Mark or flag equipment and breakers that will be part of
outage.
2. Barricade energized electrical 1. Unauthorized entrants to within the arc
1a. Use red danger tape and stanchions (or similar) to
work area at electrical equipment flash and/or limited approach boundary
encircle the panel at the limited approach boundary.
1b. Position a worker outside of the physical barrier to
also stand guard.
1c. Allow no one inside of the physical barrier who is not
on the electrical team and who is not wearing the required
shock PPE that is identified for the task per the electrical
risk assessment.
1a. Wear shock PPE that is identified for the task per the
electrical risk assessment.
3. Open electrical equipment 1. Electric shock 1b. Remove any conductive material from the top and sides of
the electrical panel before opening the electrical panel.
1c. Use insulated tools to remove bolts and screws from panel
cover.

2a. Keep work area cleared of debris and other tripping


hazards.
2b. Use two people to remove large panel covers.
2. Falls
3. Use safe ladder practices, including: Always inspect
ladder before each shift. Ensure all four legs are stable
HAZARDS
ACTIONS TO ELIMINATE OR MINIMIZE
JOB STEP HAZARDS
EACH HAZARD
before climbing ladder. Use three points of contact when
ascending or descending. No metal ladders.
1a. Install equipment according to specifications.
4. Work in panel on circuits <50V 1. Human error and Electrical failure 1b. Use insulated tools.
1c. Leave no loose/spare parts inside or on top of panel.
1. Trips, cuts, bruises, strains 1a. Keep work area cleared of debris and other tripping
hazards.
1b. Use two people to install large panel covers.
2. Falls
5. Close electrical equipment
2. Use safe ladder practices, including: Always inspect
ladder before each shift. Ensure all four legs are stable
before climbing ladder. Use three points of contact when
ascending or descending. No metal ladders.

3. Electric shock 3. Ensure that panel cover is securely in place.


PPE
MINIMUM PPE REQUIRMENTS FOR ALL JOB STEPS SPECIAL PPE REQUIREMENTS
1) Hard Hats
2) Goggles NA
3) Rubber Gloves
4) Safety Shoes
5) Respiratory Mask

Identify steps requiring special PPE: NA

EQUIPMENT
TOOLS AND EQUIPMENT INSPECTION CRITERIA
1) Insulated Ladder Visual Inspection, Documentation
2) Screw drivers Visual Inspection and Functionality, Cleanliness
3) Wire Strippers Compatibility, Documentation, Visual Inspection
4) Voltage Tester Compatibility, Documentation, Visual Inspection
5) Drill and Bits Compatibility, Documentation, Visual Inspection
6) Circuit Tester Compatibility, Documentation, Visual Inspection

OSHA-RELATED TRAINING APPLICABLE TO THIS ACTIVITY i


Electrical Safety Training
Electrical Hazard Recognition
NFPA 70E Training
Electrical Equipment Inspection and Maintenance
Emergency Response Procedure

Preparer
Name and signature of person who filled out this AHA: Anoop Anil Kumar Date:28/3/2024

By signing this AHA, the preparer is certifying that the information provided is true, and that any change in the conditions described in this AHA or inadequacies found for
protecting employees during the activity may require a revision to this AHA.
Acceptance by V2X personnelii
Name and signature of Project Administrator: Date:

Name and signature of EHS POC: Date:

i
Copies of training certificates must be included with this AHA, with Project-Specific Plans, and/or with the contractor’s APP.