I. OBJECTIVES:
A. CONTENT STANDARD The learners install the wiring The learners install the wiring The learners install the wiring The learners install the wiring The learners install the wiring
devices for floor and ground devices for floor and ground devices for floor and ground devices for floor and ground devices for floor and ground
fault current interrupter in fault current interrupter in fault current interrupter in fault current interrupter in fault current interrupter in
accordance with PEC accordance with PEC accordance with PEC accordance with PEC accordance with PEC
B. PERFORMANCE
STANDARD
The learners shall be able to The learners shall be able to The learners shall be able to The learners shall be able to The learners shall be able to
observe safety procedure in observe safety procedure in observe safety procedure in observe safety procedure in observe safety procedure in
installing the wiring devices installing the wiring devices installing the wiring devices installing the wiring devices installing the wiring devices
for floor and ground fault for floor and ground fault for floor and ground fault for floor and ground fault for floor and ground fault
current interrupter in current interrupter in current interrupter in current interrupter in current interrupter in
accordance with OHS accordance with OHS accordance with OHS accordance with OHS accordance with OHS
procedures procedures procedures procedures procedures
C. MELCS LO 1 LO 1 LO 1 LO 1 LO 1
Install the wiring devices for Install the wiring devices for Install the wiring devices for Install the wiring devices for Install the wiring devices for
Interpret plan/drawings floor and ground fault current floor and ground fault current floor and ground fault current floor and ground fault current floor and ground fault current
based on the job requirement interrupter based on PEC interrupter based on PEC interrupter based on PEC interrupter based on PEC interrupter based on PEC
standards standards standards standards standards
D. OBJECTIVES A. identify two bulbs A. Install Bulb controlled by A. Install Bulb controlled by
At the end of the learning connected in parallel single pole single throw single pole single throw
period, the students shall be controlled individually by switch in one location switch in one location
able to: SPST In different location.
C. MOTIVATION
D. LESSON PROPER Discussion on the following: Discussion on the following: Discussion on the following:
Steps in connecting Two Bulb Procedure on the installation Procedure on the installation
Connected in Parallel of bulb controlled by 1 SPST of bulb controlled by 1 SPST
Controlled Individually by in one location in one location
SPST In Different Location
H. Short quiz (1-5 items) Short quiz (1-5 items) Short quiz (1-5 items)
ASSESSMENT/EVALUATION
IV.ASSIGNMENT
Perform Activities see Module Bring your PPE Bring your PPE
9 p. 8
REFLECTION
PREPARED BY:
RAMIL R. OBRA
TLE Teacher