Professional Documents
Culture Documents
Action Plan R I C E READING Project MOVERS
Action Plan R I C E READING Project MOVERS
Department of Education
Caraga Administrative Region
Division of Agusandel Sur
PATIN-AY NATIONAL HIGH SCHOOL
(Carved-out School from ASSAT/DepEd Accredited Technical Vocational High School)
D.O. Plaza Government Center, Patin-ay, Prosperidad, Agusan del Sur
Phases of Goals and Activities/ Persons Involved Resources Needed Time Frame Success Indicator
Implementation Objectives Strategies
Phase 1:
*Assess the reading *Conduct of Phil-IRI *Principal, Reading *Phil-IRI Reading August 2023 *Assessment on the
Pre-implementation level of the learners Group Screening Test Teacher, Language Materials Reading Level of each
through Phil-IRI *Administration of teachers and students
the Phil-IRI Graded Students *Phil-IRI Graded
-Categorizing and Passages passages
Orientation
*Determine the *SDO-Reading
starting point of Resources Project
graded passages TANDAWAN for
depending on raw Grades 7-12
score in Phil-IRI GST.
*Read with speed and -Graded passages February to April Learners able to read
understanding -Buddy Book 2024 with critical thinking
through Silent Swapping
Reading -Travel Books
Comprehension -Calendar based-
Reading
-Retelling
*Read for maximum Learners can read
retention and recall independently.
varying difficulty
about each passage
Phase 3:
Post Implementation *To evaluate the *evaluation of *Language teachers, Phil-IRI Post-test; Oral May to June 2024 *Consolidated Phil-IRI
improvement of the learners’ reading level Reading Teachers and and Written Post test result
Final Evaluation learners’ reading students
(Diagnosis) proficiency *Comparison bar
graph of pretest and
post test results
Prepared by:
EARL DARIEN GOMERA
G-11 Adviser Noted by:
MARILOU P. CURUGAN
Principal-IV