MR Hamid Project 2018-2019
MR Hamid Project 2018-2019
DATE CODE
1/12/2018 BK.999.18.01.070
2/2/2018 BK.999.18.02.007
3/26/2018 CK.18.03.193
5/25/2018 BK.088.18.05.124
6/4/2018 BK.088.18.06.001
8/29/2018 BK.088.18.08.125
10/19/2018 BK.088.18.10.126
11/23/2018 BK.088.18.11.181
2/12/2019 BK.088.19.02.087
12/26/2018 BK.088.18.12.168
1/25/2019 BK.088.19.01.229
4/29/2019 BK.088.19.04.226
5/21/2019 BK.088.19.05.168
8/13/2019 BK.088.19.08.163
7/19/2019 BK.19.07.062
8/23/2019 BK.088.19.08.254
10/29/2019 BK.088.19.10.217
11/30/2019 JM.19.11.022
DESCRIPTION
work installing ceramics in the canteen area (BP Khamid) TRF 12/01/18 BCA 999
cast manufacture of reservoir tank stands at LT 4 (BP Hamid) TRF 02/02/18 BCA 999
plate installation in the 2nd Floor area of the flour warehouse (BP. Hamid) TRF 25/05/18 BCA 088
plate installation in the 2nd Floor area of the flour warehouse(BP. Khamid) TRF 04/06/18 BCA 088
dismantling and installing gutters in the production area BR.NO.17480 (BP.Hamid) TRF 29/08/18 BCA 088
DP 40% dismantle and install production gutters, FG INV#010 Hamid BR#17521 PR#17-365 19/10/18 BCA
088
pay off 60% dismantle and install production gutters 011 Hamid 23/11/18 BCA 088
retention dismantle and install production gutters Hamid 12/02/2019 BCA 088
pay off 60% finished Good warehouse area012 BPK Hamid 26/12/18 BCA 088
mixing-plate & cast installation 2805/XII/2018 Bpk Hamid 25/01/19 BCA 088
install ceramics & dismantle finished Good warehouse gutter Hamid 29/04/19 BCA 088
retention-dismantle & installation gutters FG Hamid 21/05/19 BCA 088
retention-dismantle & installation gutter payment(tanggal 14/04/2019) 13 /08/19 BCA 088
40% payoff for renovation and installation of zinc and curtains in the flour area warehouse
Rp 14,330,000.00
Mr Samuel dan Mr Hendy
Rp 10,480,512.00
Mr Samuel dan Mr Hendy
Rp 18,718,080.00 Mr Samuel dan Mr Hendy
Rp 1,920,000.00
Rp 50,000.00 GSP
2nd floor mixing, at a certain point the plate did not stick to the cast floor (there is a gap)
The project from mixing to cutting has been completed, and there have been several repairs due to post-installation leaks
The project from mixing to cutting has been completed, and there have been several repairs due to post-installation leaks
The project from mixing to cutting has been completed, and there have been several repairs due to post-installation leaks
No Information
2nd floor mixing, at a certain point the plate did not stick to the cast floor (there is a gap)
Done
For repairing Mr Chin Ann office & residence area (only material)
No Information
No Information