Daily Report Nov 23

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 40

DATE : 11/1/2023

Sl. Area Name of Equipment PTW no.


No.
1 BOP SCREW COMP-1A/1B
2 CHP BC 1
3 BOILER DCF 1
4 BOP ACW 1
5 BOP LDO PUMP 1&2
6 BOP FIRE FIGHTER
7 BOILER BED DRAIN 3
8 CHP BC-4
9 BOILER FIRE SPRAY LINE
10 AHP ESP 6SYSTEM
11 CHP FIRE FIGHTER
DAILY MAINTENANCE
1X 60 MW CPP KUTCH CHEMICALS INDU
KCIL MANPOWER :

Description of Maintenance job

PANEL FILTER CLEANING WORK


BC1 Pm, Vibrofeeder 1,2,3Pm work completed
discharge chute rope fixing work completed
PM WORK
PM WORK
Pump house all pumps greasing work
Bed drain3 sliding gate fabrication work u/p
CONVEYOR GALLERY FIRE LINE ERECTION WORK
BOILER U#1 SIDE SPRAY LINE ERECTION WORK
ESP 6 SYSTEM CONVEYING LINE BOX UP WORK
MONITAR VALVE INTER CHANGING WORK
ILY MAINTENANCE REPORT
H CHEMICALS INDUSTRIES LTD, GANDHIDHAM
D Shift : 12
A-1, G-5, B-2, C-2 JANA, MRM - MANPOWER : N Shift : 0

Type of
Engineer/ Technician Maintenance Status of Duration
Job Maintenance Job (Hr).
AMRESH COMPLETED 0.5
AMRESH COMPLETED 12
ALPESH COMPLETED 5
ASHOK COMPLETED 3
TUSHAL COMPLETED 3
ALPESH MAYUR COMPLETED 3
MRM SUDISH COMPLETED 5
JANA UNDER PROGRESS
MRM UNDER PROGRESS
AMRESH NIRAJ COMPLETED 3
MAYUR COMPLETED 3
ft : 12 JANA : 6
ft : 0 OVER TIME: MRM : 6

Remarks ( If work
Spares Consumed Consumables incompleted or pending or
Consumed force closing etc.)
DATE : 11/2/2023

Sl. Area Name of Equipment PTW no.


No.
1 BOP SCREW COMP-1A/1B
2 CHP BC 2
3 chp RBF 1
BOP CLARIFIER 1
4 BOP ACW 2
5 BOP LDO UNODING PUMP
6 CHP IDLER
7 BOILER BED DRAIN 3
8 CHP BC-4
9 BOILER FIRE SPRAY LINE
10 TURBINE NET FIXING
DAILY MAINTENANCE
1X 60 MW CPP KUTCH CHEMICALS INDU
KCIL MANPOWER :

Description of Maintenance job

PANEL FILTER CLEANING WORK


BC2 Pm work completed WITH GB oil replacement
BELT JOINT PATCHUP WORK DONE
PM WORK
PM WORK
PM WORK
2 NOS SPARE IDLER RAPAIRING WORK
Bed drain3 sliding gate fabrication work u/p
CONVEYOR GALLERY FIRE LINE ERECTION WORK
BOILER U#1 SIDE SPRAY LINE ERECTION WORK
TURBINE 0 TO 5 MTR LADDER SIDE NET FIXING WORK
ILY MAINTENANCE REPORT
H CHEMICALS INDUSTRIES LTD, GANDHIDHAM
D Shift : 12
A-1, G-5, B-2, C-2 JANA, MRM - MANPOWER : N Shift : 0

Type of
Engineer/ Technician Maintenance Status of Duration
Job Maintenance Job (Hr).
NIRAJ COMPLETED 0.5
tushal COMPLETED 12
NIRAJ COMPLETED 5
TUSHAL COMPLETED 3
PAPPU COMPLETED 3
ALPESH COMPLETED 3
NIRAJ COMPLETED 3
MRM SUDISH COMPLETED 5
JANA UNDER PROGRESS
MRM UNDER PROGRESS
MRM COMPLETED
ft : 12 JANA : 6
ft : 0 OVER TIME: MRM : 6

Remarks ( If work
Spares Consumed Consumables incompleted or pending or
Consumed force closing etc.)
DATE : 11/3/2023

Sl. Area Name of Equipment PTW no.


No.
1 BOP DE WATERING PUMP
2 BOP SCREW COMP-1A/1B
3 CHP BC 3
4 CHP SCRENNING PLANT
5 BOP CLARIFIER 2
6 BOP ACW 3
7 BOP HSD PUMP 1,2
8 BOILER DG
9 BOILER HP DOSING 2
10 CHP BC-4
11 BOILER FIRE SPRAY LINE
12 CHP BC 2
DAILY MAINTENANCE
1X 60 MW CPP KUTCH CHEMICALS INDU
KCIL MANPOWER :

Description of Maintenance job

DE WATERING PUMP JAMM CLEARING NEAR 0MTR MCC ROOM


PANEL FILTER CLEANING WORK
BC 3 PM WORK DONE
ALL BELT CHAIN OILING WORK
PM WORK
PM WORK
PM WORK
1 NOS DOOR CLAMP REMOVING WORK FOR SAMPLE PIECE
HP DOSING PUMP OIL LECKAGE ATTEND
CONVEYOR GALLERY FIRE LINE ERECTION WORK
BOILER U#1 SIDE SPRAY LINE ERECTION WORK
bc2 01nos hood cover fixing done
ILY MAINTENANCE REPORT
H CHEMICALS INDUSTRIES LTD, GANDHIDHAM
D Shift : 11
A-1, G-5, B-2, C-2 JANA, MRM - MANPOWER : N Shift : 0

Type of
Engineer/ Technician Maintenance Status of Duration
Job Maintenance Job (Hr).
SUBHANKAR DILIP
SUBHANKAR COMPLETED 0.5
SUBHANKAR ASHOK COMPLETED 5
NIRAJ COMPLETED 5
TUSHAL COMPLETED 3
AMRESH COMPLETED 3
NIRAJ COMPLETED 3
ALPESH MAYUR COMPLETED 3
ALPESH MAYUR COMPLETED 5
JANA UNDER PROGRESS
MRM UNDER PROGRESS
SUBHANKAR COMPLETED 1
ft : 11 JANA : 6
ft : 0 OVER TIME: MRM : 5

Remarks ( If work
Spares Consumed Consumables incompleted or pending or
Consumed force closing etc.)

COUPLING BUSH
DATE : 11/4/2023

Sl. Area Name of Equipment PTW no.


No.
1 CHP SPARE IDLER
2 BOP SCREW COMP-1A/1B
3 CHP BC 3
4 CHP SCRENNING PLANT
5 BOP CLARIFIER 2
6 BOP ACW 3
7 BOP HSD PUMP 1,2
8 BOILER DG
9 BOILER HP DOSING 2
10 CHP BC-4
11 BOILER FIRE SPRAY LINE
12 CHP BC 2
DAILY MAINTENANCE
1X 60 MW CPP KUTCH CHEMICALS INDU
KCIL MANPOWER :

Description of Maintenance job

IMPACT ROLLER RING FIXING WORK


PANEL FILTER CLEANING WORK
BC 3 PM WORK DONE
ALL BELT CHAIN OILING WORK
PM WORK
PM WORK
PM WORK
1 NOS DOOR CLAMP REMOVING WORK FOR SAMPLE PIECE
HP DOSING PUMP OIL LECKAGE ATTEND
CONVEYOR GALLERY FIRE LINE ERECTION WORK
BOILER U#1 SIDE SPRAY LINE ERECTION WORK
bc2 01nos hood cover fixing done
ILY MAINTENANCE REPORT
H CHEMICALS INDUSTRIES LTD, GANDHIDHAM
D Shift : 11
A-1, G-5, B-2, C-2 JANA, MRM - MANPOWER : N Shift : 0

Type of
Engineer/ Technician Maintenance Status of Duration
Job Maintenance Job (Hr).
AMRESH COMPLETED 2
SUBHANKAR COMPLETED 0.5
SUBHANKAR ASHOK COMPLETED 5
NIRAJ COMPLETED 5
TUSHAL COMPLETED 3
AMRESH COMPLETED 3
NIRAJ COMPLETED 3
ALPESH MAYUR COMPLETED 3
ALPESH MAYUR COMPLETED 5
JANA UNDER PROGRESS
MRM UNDER PROGRESS
SUBHANKAR COMPLETED 1
ft : 11 JANA : 6
ft : 0 OVER TIME: MRM : 5

Remarks ( If work
Spares Consumed Consumables incompleted or pending or
Consumed force closing etc.)

COUPLING BUSH
DATE : 11/4/2023

Sl. Area Name of Equipment PTW no.


No.
1 CHP ACW
2 BOP SCREW COMP-1A
3 CHP BC 4
4 CHP 1A STREAM
5 BOP CLARIFIER 3
6 BOP DMTP 1
8 TURBINE NET FIXING
9 BOILER HP DOSING 2
10 CHP BC-4
11 BOILER FIRE SPRAY LINE
12 CHP PRIMARY SCREEN 1A
13 AHP FLY ASH SILO
DAILY MAINTENANCE
1X 60 MW CPP KUTCH CHEMICALS INDU
KCIL MANPOWER :

Description of Maintenance job

Acw pump 3 gland tightness work done


PANEL FILTER RADIATOR PANEL CLEANING WORK
BC 4 PM WORK DONE
CRUSHER HOUSE 1A STREAM GREASING WORK
PM WORK
PM WORK
TURBINE 0 TO 5 MTR LADDER SIDE NET FIXING WORK
HP DOSING PUMP STROKE ADJUSTMENT DUE TO ABNORMAL SOUND FOUND
CONVEYOR GALLERY FIRE LINE ERECTION WORK
BOILER U#1 SIDE SPRAY LINE ERECTION WORK
MESH FIXING BY WINDING WIRE
PURSING LINE GASKET REPLACEMENT WORK
ILY MAINTENANCE REPORT
H CHEMICALS INDUSTRIES LTD, GANDHIDHAM
D Shift : 11
A-1, G-5, B-2, C-2 JANA, MRM - MANPOWER : N Shift : 0

Type of
Engineer/ Technician Maintenance Status of Duration
Job Maintenance Job (Hr).
ALPESH COMPLETED 2
PAPPU COMPLETED 0.5
SUBHANKAR COMPLETED 5
AMRESH MAYUR COMPLETED 5
NIRAJ UNDER PROGRESS 3
ASHOK COMPLETED 3
MRM COMPLETED 3
ALPESH COMPLETED 5
JANA UNDER PROGRESS
MRM UNDER PROGRESS
MAYUR COMPLETED 1
PAPPU COMPLETED 2
ft : 11 JANA : 6
ft : 0 OVER TIME: MRM : 5

Remarks ( If work
Spares Consumed Consumables incompleted or pending or
Consumed force closing etc.)
DATE : 11/5/2023

Sl. Area Name of Equipment PTW no.


No.
1 BOP SCREW COMP-1B
2 CHP BC 5
3 BOILER PA FAN 2
4 BOP CLARIFIER 1
5 BOP DMTP 2
6 BOILER HP LP PH DOSING PUMP 1
7 CHP BC-4
8 BOILER FIRE SPRAY LINE
9 CHP GEAR BOX
DAILY MAINTENANCE
1X 60 MW CPP KUTCH CHEMICALS INDU
KCIL MANPOWER :

Description of Maintenance job

PANEL FILTER RADIATOR PANEL CLEANING WORK


BC 4 PM WORK DONE
DRIVE SIDE BEARING GREASING WORK
NRV RECTIFICATION WORK
PM WORK
PM WORK
CONVEYOR GALLERY FIRE LINE ERECTION WORK
BOILER U#1 SIDE SPRAY LINE ERECTION WORK
BC 2 OLD GEAR BOX RAPPING WORK DONE
ILY MAINTENANCE REPORT
H CHEMICALS INDUSTRIES LTD, GANDHIDHAM
D Shift : 11
A-1, G-5, B-2, C-2 JANA, MRM - MANPOWER : N Shift : 0

Type of
Engineer/ Technician Maintenance Status of Duration
Job Maintenance Job (Hr).
JADAV COMPLETED 0.5
JADAV COMPLETED 5
NIRAJ COMPLETED 5
ALPESH MAYUR MRM COMPLETED 3
ASHOK COMPLETED 3
PAPPU COMPLETED 5
JANA UNDER PROGRESS
MRM UNDER PROGRESS
ASHOK COMPLETED 1
ft : 11 JANA : 6
ft : 0 OVER TIME: MRM : 5

Remarks ( If work
Spares Consumed Consumables incompleted or pending or
Consumed force closing etc.)
DATE : 11/6/2023

Sl. Area Name of Equipment PTW no.


No.
1 BOP SCREW COMP-1A/1B
2 BOILER DCF 1
3 BOP WASTE WATER PUMP
4 TURBINE AHU 5 MTR
5 BOP RAW PUMP 1
6 BOILER HP LP PH DOSING PUMP 2
7 CHP BC-4
8 BOILER FIRE SPRAY LINE
9 BOILER LP DOSING1
10 CHP CRUSHER 1A
DAILY MAINTENANCE
1X 60 MW CPP KUTCH CHEMICALS INDU
KCIL MANPOWER :

Description of Maintenance job

PANEL FILTER CLEANING WORK


PLATE GATE DOOR FIXING WORK
PM WORK
DRAIN LINE PIN HOLE AREA MSEAL FIXING WORK
PM WORK
PM WORK
CONVEYOR GALLERY FIRE LINE ERECTION WORK
BOILER U#1 SIDE SPRAY LINE ERECTION WORK
DISCHARGE NRV CLEANNING WORK
INSPECTION WORK DUE TO BROKEN BRAKER LINER FOUND IN CRUSHER
ILY MAINTENANCE REPORT
H CHEMICALS INDUSTRIES LTD, GANDHIDHAM
D Shift : 10
A-1, G-5, B-2, C-2 JANA, MRM - MANPOWER : N Shift : 0

Type of
Engineer/ Technician Maintenance Status of Duration
Job Maintenance Job (Hr).
JADAV COMPLETED 0.5
MAYUR COMPLETED 5
NIRAJ COMPLETED 5
JADAV COMPLETED 3
ASHOK COMPLETED 3
PAPPU COMPLETED 5
JANA UNDER PROGRESS
MRM UNDER PROGRESS
ALPESH SUBHANKAR COMPLETED
ALPESH COMPLETED 1
ft : 10 JANA : 6
ft : 0 OVER TIME: MRM : 4

Remarks ( If work
Spares Consumed Consumables incompleted or pending or
Consumed force closing etc.)
DATE : 11/7/2023

Sl. Area Name of Equipment PTW no.


No.
1 BOP SCREW COMP-1A/1B
2 BOILER BED DRAIN 2
3 CHP RBF 1
4 AHP FLY ASH SILO
5 BOP RAW PUMP 2
6 CHP 1B STREAM
7 TURBINE GSC BLOWER 1
BTG ALL EQUPMENT
8 CHP BC-4
9 BOILER FIRE SPRAY LINE
DAILY MAINTENANCE
1X 60 MW CPP KUTCH CHEMICALS INDU
KCIL MANPOWER :

Description of Maintenance job

PANEL FILTER CLEANING WORK


PLATEGATE VALVE HANDLE KEY FIXING WORK
BELT MEASUREMENT WORK
Ash silo Ash conditioning, Spout, Rootblower, Binvent filter pm work
PM WORK
GREASING WORK
MOTOR DECOUPLE WORK FOR MOTOR INSPECTION WORK
VIBRATION READING TAKEN
CONVEYOR GALLERY FIRE LINE ERECTION WORK
BOILER U#1 SIDE SPRAY LINE ERECTION WORK
ILY MAINTENANCE REPORT
H CHEMICALS INDUSTRIES LTD, GANDHIDHAM
D Shift : 11
A-1, G-5, B-2, C-2 JANA, MRM - MANPOWER : N Shift : 0

Type of
Engineer/ Technician Maintenance Status of Duration
Job Maintenance Job (Hr).
MAYUR COMPLETED 0.5
NIRAJ COMPLETED 5
ALPESH COMPLETED 5
NIRAJ ASHOK COMPLETED 3
ASHOK COMPLETED 3
MAYUR COMPLETED 5
NIRAJ MAYUR UNDER PROGRESS
ALPESH PAPPU
JANA UNDER PROGRESS
MRM UNDER PROGRESS
ft : 11 JANA : 6
ft : 0 OVER TIME: MRM : 5

Remarks ( If work
Spares Consumed Consumables incompleted or pending or
Consumed force closing etc.)
DATE : 11/8/2023

Sl. Area Name of Equipment PTW no.


No.
1 BOP SCREW COMP-1A/1B
2 CHP RBF1 ,2
3 CHP RBF 1
4 CHP BC 6
5 BOP RAW PUMP 3
6 BOILER DCF 1,2,3
7 BOILER WALL SEAL BLOWER
8 CHP PRIMARY SCREEN 1A
9 CHP BC-4
10 BOILER FIRE SPRAY LINE
DAILY MAINTENANCE
1X 60 MW CPP KUTCH CHEMICALS INDU
KCIL MANPOWER :

Description of Maintenance job

PANEL FILTER CLEANING WORK


pm work completed
NEW BELT SHIFFTING WORK DONE FROM STORE TO BUNKER FLOOR
PM WORK
PM WORK
GREASING WORK
NEW WALL SEAL BLOWER BASE FRAME ALIGNMENT WORK
SIDE CLAMP BOLT TIGHTNESS WORK
CONVEYOR GALLERY FIRE LINE ERECTION WORK
BOILER U#1 SIDE SPRAY LINE ERECTION WORK
ILY MAINTENANCE REPORT
H CHEMICALS INDUSTRIES LTD, GANDHIDHAM
D Shift : 11
A-1, G-5, B-2, C-2 JANA, MRM - MANPOWER : N Shift : 0

Type of
Engineer/ Technician Maintenance Status of Duration
Job Maintenance Job (Hr).
AMRESH COMPLETED 0.5
MAYUR ASHOK COMPLETED 5
JANABHAI COMPLETED 5
TUSHAL COMPLETED 3
PAPPU COMPLETED 3
AMRESH MAYUR COMPLETED 5
ALPESH MRM COMPLETED 4
MAYUR COMPLETED 3
JANA UNDER PROGRESS
MRM UNDER PROGRESS
ft : 11 JANA : 6
ft : 0 OVER TIME: MRM : 5

Remarks ( If work
Spares Consumed Consumables incompleted or pending or
Consumed force closing etc.)
DATE : 11/15/2023

Sl. Area Name of Equipment PTW no.


No.
1 BOP SCREW COMP-1A/1B
2 BOILER HP DOSING PUMP 2
3 CHP FIRE HOSE PIPE
4 CHP FLIP FLOP 1B
5 CHP VIBROFIDEER 2
6 CHP BC-4
7 BOILER FIRE SPRAY LINE
DAILY MAINTENANCE
1X 60 MW CPP KUTCH CHEMICALS INDU
KCIL MANPOWER :

Description of Maintenance job

PANEL FILTER CLEANING WORK


GLAND TIGHTNESS WORK
BUNKER FLOOR HOSE PIPE REPARING WORK DONE
NDE SIDE PENDULUM FIXING WORK DUE TO BOLT BROKEN
SCAFFOLDING FIXING WORK DONE FOR WELDING
CONVEYOR GALLERY FIRE LINE ERECTION WORK
ESP U#1 SIDE SPRAY LINE ERECTION WORK
ILY MAINTENANCE REPORT
H CHEMICALS INDUSTRIES LTD, GANDHIDHAM
D Shift : 9
A-1, G-5, B-2, C-2 JANA, MRM - MANPOWER : N Shift : 0

Type of
Engineer/ Technician Maintenance Status of Duration
Job Maintenance Job (Hr).
PAPPU COMPLETED 0.5
PAPPU COMPLETED 5
PAPPU COMPLETED 5
SUBHANKAR ASHOK COMPLETED 3
JANABHAI COMPLETED 3
JANA UNDER PROGRESS
MRM UNDER PROGRESS
ft : 9 JANA : 4
ft : 0 OVER TIME: MRM : 5

Remarks ( If work
Spares Consumed Consumables incompleted or pending or
Consumed force closing etc.)

You might also like