THE PHILIPPINE STAR BUILDING DEFECTS LIST

Item No. Description Location Photo Remarks

1 Transformer no cover GF Printing Press C/O PHILSTAR

*DONE, MARCH 22, 2024

2 Damaged electrical panel RD

*DONE, MARCH 15, 2024

3 Rag left above the conduit EE Room

*DONE, MARCH 15, 2024

4 GI Wire left at the panel RD

ACCU Electrical Panel insufficient


5 RD *FOR CHECKING, WILL GIVE AN UPDATE ONCE DONE
tagging

*DONE, MARCH 15, 2024

ACCU Electrical Panel insufficient


6 RD
tagging

7 Old ECB GF Printing Press *FOR CHECKING, WILL GIVE AN UPDATE ONCE DONE
*4TH FLR, CORRECTED, MARCH 16, 2024. WITH
DESIGNERS APPROVAL CB DESIGN

8 Missing ECB RD: PP-ACRD

*CORRECTED, MARCH 16, 2024

Wrong tagging, should have no


9 3F: PPO AC3
spare

*CORRECTED, MARCH 16, 2024

Wrong tagging, should have no


10 3F: LPO3
spare

*CORRECTED, MARCH 15, 2024

11 Missing lugs

*CORRECTED, MARCH 15, 2024

Wrong tagging, should have 1


12 GF: PPO AC1
spare only

*DONE, MARCH 22, 2024

13 Hanging wire Gym

*DONE, MARCH 22, 2024

14 Missing cover Gym


*ALL LIGHTING FIXTURE WERE TESTED AND
15 Busted lights Perimeter ACCEPTED. Please see google drive for testing and
commissioning checlist approval.

*ALL LIGHTING FIXTURE WERE TESTED AND


16 Busted lights Perimeter ACCEPTED. Please see google drive for testing and
commissioning checlist approval.

*ALL LIGHTING FIXTURE WERE TESTED AND


17 Busted lights Perimeter ACCEPTED. Please see google drive for testing and
commissioning checlist approval.

*ALL LIGHTING FIXTURE WERE TESTED AND


18 Busted lights Perimeter ACCEPTED. Please see google drive for testing and
commissioning checlist approval.