Professional Documents
Culture Documents
Access - Point - Isat Rumbia - 2 - Installation - Report
Access - Point - Isat Rumbia - 2 - Installation - Report
Rumbia : 2
LINKPlanner AP Installation Report
30 November 2021
udaronni
Organization: telkom
Phone: 085267045728
Email: udaronni@gmail.com
-40
Isat Rumbia
-20
kilometers
ISAT-Great Giant
Ratna Khaton
Isat bandar Jaya
Isat Kalirejo
dang Agung
Page 1 of 24
Table of Contents
Page 2 of 24
1. Access Point Summary
Summary
AP Name Isat Rumbia : 2
Group Name
Hub Name Isat Rumbia
Equipment Type ePMP 1000 (running Release 4.4.3)
Antenna Type Cambium Networks 90° 4.9 - 6 GHz, 90/120 deg
Sector Antenna C050900D021
Modeled Beamwidth 120°
Antenna Azimuth 225.00° from True North
224.56° from Magnetic North
Antenna Tilt 4.0° (uptilt)
Connected Subscribers 4
Max Range 20 kilometers
RF Frequency Band 5.8 GHz (5725 to 5875 MHz)
RF Channel Bandwidth 20 MHz
DL/UL Ratio 50/50
Total Predicted DL Throughput 33.68 Mbps
Total Predicted UL Throughput 32.51 Mbps
Total Predicted Throughput 66.20 Mbps
Page 3 of 24
2. Isat Rumbia : 2
C050900A211 1 ePMP 1000: 5 GHz Connectorized Radio with Sync (ROW) (EU cord)
C050900C261 4 ePMP 1000: 5 GHz Force 200AR5-25 High Gain Radio (ROW) (EU cord).
Kit includes radio with antenna, power supply, line cord and mounting bracket
Page 4 of 24
Project isat lampung tengah, Access Point Isat Rum... - 2. Isat Rumbia : 2 LINKPlanner version 5.2.3 Installation Report
Page 5 of 24
Project isat lampung tengah, Access Point Isat Rum... - 2. Isat Rumbia : 2 LINKPlanner version 5.2.3 Installation Report
Network Map
-14
-7
Bandar Mataram
Isat Rumbia
Sakti Buana
14
Page 6 of 24
Project isat lampung tengah, Access Point Isat Rum... - 2. Isat Rumbia : 2 LINKPlanner version 5.2.3 Installation Report
Mode Total
Mean SMs per DL modulation SMs per UL modulation
Predicted
Throughput Throughput Throughput
(Mbps) Quantity Percent (Mbps) Quantity Percent (Mbps)
MCS15
(64QAM
0.83) 16.55 1 25.0 8.42 1 25.0 8.13
MCS14
(64QAM
0.75) 0.00 0 0.0 0.00 0 0.0 0.00
MCS13
(64QAM
0.67) 16.26 0 0.0 0.00 2 50.0 16.26
MCS12
(16QAM
0.75) 33.39 3 75.0 25.26 1 25.0 8.13
MCS11
(16QAM
0.5) 0.00 0 0.0 0.00 0 0.0 0.00
MCS10
(QPSK
0.75) 0.00 0 0.0 0.00 0 0.0 0.00
MCS9
(QPSK
0.5) 0.00 0 0.0 0.00 0 0.0 0.00
MCS7
(64QAM
0.83) 0.00 0 0.0 0.00 0 0.0 0.00
MCS6
(64QAM
0.75) 0.00 0 0.0 0.00 0 0.0 0.00
MCS5
(64QAM
0.67) 0.00 0 0.0 0.00 0 0.0 0.00
MCS4
(16QAM
0.75) 0.00 0 0.0 0.00 0 0.0 0.00
MCS3
(16QAM
0.5) 0.00 0 0.0 0.00 0 0.0 0.00
MCS2
(QPSK
0.75) 0.00 0 0.0 0.00 0 0.0 0.00
MCS1
(QPSK
0.5) 0.00 0 0.0 0.00 0 0.0 0.00
Page 7 of 24
3. Isat Rumbia : 2 to Bandar Mataram
Summary
AP Name Isat Rumbia : 2
Group Name
Hub Name Isat Rumbia
SM Name Bandar Mataram
Link Type Line-of-Sight
AP Equipment Type ePMP 1000 (running Release 4.4.3)
SM Equipment Type ePMP Force 200 (running Release 4.4.3)
Maximum Obstruction 0 meters
Link Distance 15.958 kilometers
Free Space Path Loss 131.78 dB
Excess Path Loss 0.00 dB
RF Frequency Band 5.8 GHz (5725 to 5875 MHz)
RF Channel Bandwidth 20 MHz
DL/UL Ratio 50/50
Path Profile
Bill of Materials
Part Number Qty Description
C000000L065 1 Gigabit Surge Suppressor (30V)
C050900C261 1 ePMP 1000: 5 GHz Force 200AR5-25 High Gain Radio (ROW) (EU cord).
Kit includes radio with antenna, power supply, line cord and mounting bracket
Page 8 of 24
Project isat lampung tengah, Access Point Isat Rum... - 3. Isat Rumbia : 2 to Bandar Mataram
LINKPlanner version 5.2.3 Installation Report
Installation Instruction
Perform the following checks during the installation (Check the deployment guide and the User Guide.)
1. Check with a GPS that you are installing at the correct location.
2. Check carefully the direction to Access Point. Either use a corrected compass or use the GPS waypoint
feature about 300 meters from the installation location.
3. When aligning antenna, it is important to find the centre of the main beam. This is done by adjusting the
antenna and monitoring the receive level until the peak is found. Once the peak level is found, it should be
checked against the prediced receive power to ensure that the antenna has not been aligned on a side
lobe.
Page 9 of 24
Project isat lampung tengah, Access Point Isat Rum... - 3. Isat Rumbia : 2 to Bandar Mataram
LINKPlanner version 5.2.3 Installation Report
Page 10 of 24
Project isat lampung tengah, Access Point Isat Rum... - 3. Isat Rumbia : 2 to Bandar Mataram
LINKPlanner version 5.2.3 Installation Report
(continued)
Mode Isat Rumbia Bandar Mataram
Receive Receive
Fade Margin Availability time in Mode Fade Margin Availability time in Mode
(dB) (%) * (%) (dB) (%) * (%)
MCS2
(QPSK 0.75) 16.85 0.0005 0.0000 19.85 0.0005 0.0000
MCS1
(QPSK 0.5) 20.85 99.9996 0.0003 20.85 99.9996 0.0003
Page 11 of 24
4. Isat Rumbia : 2 to Sakti Buana
Summary
AP Name Isat Rumbia : 2
Group Name
Hub Name Isat Rumbia
SM Name Sakti Buana
Link Type Near Line-of-Sight
AP Equipment Type ePMP 1000 (running Release 4.4.3)
SM Equipment Type ePMP Force 200 (running Release 4.4.3)
Maximum Obstruction 0 meters
Link Distance 10.437 kilometers
Free Space Path Loss 128.09 dB
Excess Path Loss 6.01 dB
RF Frequency Band 5.8 GHz (5725 to 5875 MHz)
RF Channel Bandwidth 20 MHz
DL/UL Ratio 50/50
Path Profile
Bill of Materials
Part Number Qty Description
C000000L065 1 Gigabit Surge Suppressor (30V)
C050900C261 1 ePMP 1000: 5 GHz Force 200AR5-25 High Gain Radio (ROW) (EU cord).
Kit includes radio with antenna, power supply, line cord and mounting bracket
Page 12 of 24
Project isat lampung tengah, Access Point Isat Rum... - 4. Isat Rumbia : 2 to SaktiLINKPlanner
Buana version 5.2.3 Installation Report
Installation Instruction
Perform the following checks during the installation (Check the deployment guide and the User Guide.)
1. Check with a GPS that you are installing at the correct location.
2. Check carefully the direction to Access Point. Either use a corrected compass or use the GPS waypoint
feature about 300 meters from the installation location.
3. When aligning antenna, it is important to find the centre of the main beam. This is done by adjusting the
antenna and monitoring the receive level until the peak is found. Once the peak level is found, it should be
checked against the prediced receive power to ensure that the antenna has not been aligned on a side
lobe.
Page 13 of 24
Project isat lampung tengah, Access Point Isat Rum... - 4. Isat Rumbia : 2 to SaktiLINKPlanner
Buana version 5.2.3 Installation Report
Page 14 of 24
Project isat lampung tengah, Access Point Isat Rum... - 4. Isat Rumbia : 2 to SaktiLINKPlanner
Buana version 5.2.3 Installation Report
(continued)
Mode Isat Rumbia Sakti Buana
Receive Receive
Fade Margin Availability time in Mode Fade Margin Availability time in Mode
(dB) (%) * (%) (dB) (%) * (%)
MCS2
(QPSK 0.75) 17.81 0.0780 0.0000 20.81 0.0780 0.0000
MCS1
(QPSK 0.5) 21.81 100.0000 0.0000 21.81 100.0000 0.0000
Page 15 of 24
5. Isat Rumbia : 2 to Sangga Buana
Summary
AP Name Isat Rumbia : 2
Group Name
Hub Name Isat Rumbia
SM Name Sangga Buana
Link Type Near Line-of-Sight
AP Equipment Type ePMP 1000 (running Release 4.4.3)
SM Equipment Type ePMP Force 200 (running Release 4.4.3)
Maximum Obstruction 0 meters
Link Distance 5.332 kilometers
Free Space Path Loss 122.25 dB
Excess Path Loss 2.46 dB
RF Frequency Band 5.8 GHz (5725 to 5875 MHz)
RF Channel Bandwidth 20 MHz
DL/UL Ratio 50/50
Path Profile
90 90
Isat Rumbia Sangga Buana
85 85
Height Above Sea Level (meters)
Bill of Materials
Part Number Qty Description
C000000L065 1 Gigabit Surge Suppressor (30V)
C050900C261 1 ePMP 1000: 5 GHz Force 200AR5-25 High Gain Radio (ROW) (EU cord).
Kit includes radio with antenna, power supply, line cord and mounting bracket
Page 16 of 24
Project isat lampung tengah, Access Point Isat Rum... - 5. Isat Rumbia : 2 to Sangga Buana version 5.2.3 Installation Report
LINKPlanner
Installation Instruction
Perform the following checks during the installation (Check the deployment guide and the User Guide.)
1. Check with a GPS that you are installing at the correct location.
2. Check carefully the direction to Access Point. Either use a corrected compass or use the GPS waypoint
feature about 300 meters from the installation location.
3. When aligning antenna, it is important to find the centre of the main beam. This is done by adjusting the
antenna and monitoring the receive level until the peak is found. Once the peak level is found, it should be
checked against the prediced receive power to ensure that the antenna has not been aligned on a side
lobe.
Page 17 of 24
Project isat lampung tengah, Access Point Isat Rum... - 5. Isat Rumbia : 2 to Sangga Buana version 5.2.3 Installation Report
LINKPlanner
Page 18 of 24
Project isat lampung tengah, Access Point Isat Rum... - 5. Isat Rumbia : 2 to Sangga Buana version 5.2.3 Installation Report
LINKPlanner
(continued)
Mode Isat Rumbia Sangga Buana
Receive Receive
Fade Margin Availability time in Mode Fade Margin Availability time in Mode
(dB) (%) * (%) (dB) (%) * (%)
MCS2
(QPSK 0.75) 25.80 0.0062 0.0000 30.80 0.0062 0.0000
MCS1
(QPSK 0.5) 29.80 100.0000 0.0000 31.80 100.0000 0.0000
Page 19 of 24
6. Isat Rumbia : 2 to Setia Mataram
Summary
AP Name Isat Rumbia : 2
Group Name
Hub Name Isat Rumbia
SM Name Setia Mataram
Link Type Near Line-of-Sight
AP Equipment Type ePMP 1000 (running Release 4.4.3)
SM Equipment Type ePMP Force 200 (running Release 4.4.3)
Maximum Obstruction 0 meters
Link Distance 18.514 kilometers
Free Space Path Loss 133.07 dB
Excess Path Loss 4.32 dB
RF Frequency Band 5.8 GHz (5725 to 5875 MHz)
RF Channel Bandwidth 20 MHz
DL/UL Ratio 50/50
Path Profile
Bill of Materials
Part Number Qty Description
C000000L065 1 Gigabit Surge Suppressor (30V)
C050900C261 1 ePMP 1000: 5 GHz Force 200AR5-25 High Gain Radio (ROW) (EU cord).
Kit includes radio with antenna, power supply, line cord and mounting bracket
Page 20 of 24
Project isat lampung tengah, Access Point Isat Rum... - 6. Isat Rumbia : 2 to SetiaLINKPlanner
Mataram version 5.2.3 Installation Report
Installation Instruction
Perform the following checks during the installation (Check the deployment guide and the User Guide.)
1. Check with a GPS that you are installing at the correct location.
2. Check carefully the direction to Access Point. Either use a corrected compass or use the GPS waypoint
feature about 300 meters from the installation location.
3. When aligning antenna, it is important to find the centre of the main beam. This is done by adjusting the
antenna and monitoring the receive level until the peak is found. Once the peak level is found, it should be
checked against the prediced receive power to ensure that the antenna has not been aligned on a side
lobe.
Page 21 of 24
Project isat lampung tengah, Access Point Isat Rum... - 6. Isat Rumbia : 2 to SetiaLINKPlanner
Mataram version 5.2.3 Installation Report
Page 22 of 24
Project isat lampung tengah, Access Point Isat Rum... - 6. Isat Rumbia : 2 to SetiaLINKPlanner
Mataram version 5.2.3 Installation Report
(continued)
Mode Isat Rumbia Setia Mataram
Receive Receive
Fade Margin Availability time in Mode Fade Margin Availability time in Mode
(dB) (%) * (%) (dB) (%) * (%)
MCS2
(QPSK 0.75) 13.87 0.0266 0.0000 16.87 0.0266 0.0000
MCS1
(QPSK 0.5) 17.87 99.9984 0.0012 17.87 99.9984 0.0012
Page 23 of 24
Disclaimer
Cambium Networks assumes no responsibility for the accuracy of the information produced by the Cambium LINKPlanner. Reference to
products or services which are not provided by Cambium Networks is for information purposes only and constitutes neither an endorsement
nor a recommendation. All information provided by the Cambium LINKPlanner is provided without warranty of any kind, either expressed or
implied.
All product or service names are the property of their respective owners. © Cambium Networks. 2021
Page 24 of 24