ALIAGA DED-Model
ALIAGA DED-Model
20 20 B 20 C 20 20 20
A A
15
130
100
15
B C
PLAN
L = 130 METERS
CLASS "A" CONCRETE BEAM STIFFENER CLASS "A" CONCRETE BEAM STIFFENER CLASS "A" CONCRETE BEAM STIFFENER
REINF. WITH 2-12MMØ MAIN BAR AND REINF. WITH 2-12MMØ MAIN BAR AND REINF. WITH 2-12MMØ MAIN BAR AND
12MMØ CUT BAR SPACED@0.15M O.C. 12MMØ CUT BAR SPACED@0.15M O.C. 12MMØ CUT BAR SPACED@0.15M O.C.
15
15
15
15
15
15
135
105
CONCRETE POST
SPACED @ EVERY
5 METERS
15
SECTION A-A
130 130
15 100 15 100
15 15
20MM X 15MM
15
12MMØ HOR. BAR 12MMØ HOR. BAR 12MMØ HOR. BAR 12MMØ HOR. BAR
SPACED @0.20M O.C. SPACED @0.20M O.C. SPACED @0.20M O.C. SPACED @0.20M O.C.
120
135
105
135
15MM X 20MM 5" CHB PLASTERED FINISH
CONCRETE POST
@ EVERY 5 METERS
15
15
15MM THK. CONCRETE SLAB 2-12MMØ U-BAR MAIN REINF. 15MM THK. CONCRETE SLAB 12MMØ U-BAR MAIN REINF.
FOR CONCRETE POST SPACED @0.30M O.C.B.W.
SECTION B-B SECTION C-C
REPUBLIC OF THE PHILIPPINES PROJECT TITLE: PREPARED BY: CHECKED AND VERIFIED: APPROVED BY: SHT. CONTENTS
PROVINCE OF NUEVA ECIJA
MUNICIPALITY OF ALIAGA
AS BUILT PLAN
CONSTRUCTION OF 130 METERS
DRAINAGE CANAL AS SHOWN
GEMWEALTH CONSTRUCTION DIOMEDES M. ORTIZ CRISALDO BACOBO JR. HON. GILBERT G. ROMANO
AND TRADING LOCATION: BRGY. SAN EUSTACIO, ALIAGA, NUEVA ECIJA AUTHORIZED REPRESENTATIVE OIC MUNICIPAL ENGINEER MUNICIPAL MAYOR