Summary of 60 MLD WTP ( Building Unit )

Sr.No Description
Pump Pump House
Pump House ( Pump House Pump House
House ( 3.0 ( 6.0 x 3 x
5.0 x 3 x 5.0 ) ( 7.0 x 3 x 5.0 ( 10.0 x 6.0 x 3.0 Total (qty.) Unit rate Total Cost
x 3 x 5.0 ) 5.0 ) ( 2
( 1 nos.) ) ( 1 nos.) ) ( 1 nos.)
( 3 nos.) nos.)

1 Earth work (Cum)


a) Excavation 0.00 mt 1.50 mt 108.045 43.74 131.22 54.0225 81.00 418.03 250.0 104506.88
b) Excavation 1.50 mt 3.00 mt 0 0.00 0.00 0 0.00 0.00 350.0 0.00
c) Excavation 3.00 mt 4.50 mt 0
d) Excavation 4.50 mt 6.00 mt 0
e) Excavation 6.00 mt 7.50 mt
f) Excavation 7.50 mt 9.00 mt
g) Excavation 7.50 mt 9.00 mt
h) Excavation 9.00 mt 10.5 mt

2 PCC Work (Cum )


a) M10 PCC Work 10.44 5.14 13.43 6.30 11.41 46.72 6769.0 316264.60

3 RCC Work (Cum )


a) M30 RCC 8998.0
b) M25 RCC 72.6 29.425 85.26 37.4625 46.05 270.80 7246.0 1962198.685

4 HYSD Fe 500 Reinforcements (kg) 6534 2795.375 2984.1 2435.0625 4098.45 18846.99 90.0 1696228.88

5 Pvc Water Stopper (R.mt) - - - - - 70.0 0

6 Structural Steel (kg) - - - - - 0

7 200/230 MM THICK MASONRY (Cum) 27.6 35.65 31.28 37.168 131.698 6079.0 800592.142

8 100/115 MM THICK MASONRY (Cum) 0 0 0 0 0 0 0

9 OUTSIDE 20 MM DOUBLE COAT PLASTER 120 155 272 161.6 0 708.6 306 216831.6
(Sq.m)
10 OUT SIDE CEMENT BASE WATER PROOF 120 155 272 161.6 0 708.6 150 106290
PAINTING (Sq.m)

INSIDE 20 MM SAND FACE WATERPROOF


11 - - - - - 0
PLASTER (Sq.m)

12 INSIDE 13 MM SMOOTH PLASTER (Sq.m) 120 155 272 161.6 708.6 150 106290

13 INSIDE PLASTIC EMULSION PAINT (Sq.m) 120 155 272 161.6 708.6 150 106290

14 EPOXY PAINT (Sq.m) - - - - - 0

15 Flooring (Sq.m) 32 57 144 97.6 330.6 900 297540

16 Water Proofing (Sq.m) 32 57 72 97.6 258.6 1100 284460

17 Sizing of Unit Total 5,997,492.78


L 8 6 9 12.2 5
B 4 9.5 8 8 5
H 5 5 4 4 -
Nos 1 1 2 1 1
- - - - -
60 MLD WTP

Pump House ( 3.0 x 3 x 5.0 ) ( 3 nos.)


Sr.No Description L B H Nos. Total Note
Foundation m m m Cum.
1 Columns 8 0.5 0.5 12 24
2 Beam 12 0.3 0.5 6 10.8
3 Slab 3 3 0.15 3 4.05
4 Foundation 2.25 2.25 0.5 12 30.375
5 SOG 3 3 0.125 3 3.375
Total 72.6 (a)

PCC 2.45 2.45 0.1 12 7.203


SOG PCC 3 3 0.1 3 2.70
Beam PCC 6 0.3 0.1 3 0.54
Total PCC 10.44 Cum.

0-1.5m depth 2.45 2.45 1.5 12 108.045


60 MLD WTP

Pump House ( 5.0 x 3 x 5.0 ) ( 1 nos.)


Sr.No Description L B H Nos. Total Note
Foundation m m m Cum.
Storage & Dosing
1 Columns 8 0.5 0.5 4 8
2 Beam 16 0.3 0.5 2 4.8
3 Slab 5 3 0.15 1 2.25
4 Foundation 2.5 2.5 0.5 4 12.5
5 SOG 5 3 0.125 1 1.875

Total RCC 29.425

PCC 2.7 2.7 0.1 4 2.916


SOG PCC 5 3 0.1 1 1.50
Beam PCC 16 0.3 0.15 1 0.72
Total PCC 5.14 Cum.

0-1.5m depth 2.7 2.7 1.5 4 43.74


60 MLD WTP

Pump House ( 6.0 x 3 x 5.0 ) ( 2 nos.)


Sr.No Description L B H Nos. Total Note
Foundation m m m Cum.

1 Columns 8 0.5 0.5 12 24.0


2 Beam 18 0.3 0.6 4 12.96
3 Slab 6 3 0.175 2 6.3
4 Foundation 2.5 2.5 0.5 12 37.5
5 SOG 6 3 0.125 2 4.5

Total RCC 85.26


Total RCC 43.3
PCC 2.7 2.7 0.1 12 8.748
SOG PCC 6 3 0.1 2 3.60
Beam PCC 18 0.3 0.1 2 1.08
Total PCC 13.43 Cum.

0-1.5m depth 2.7 2.7 1.5 12 131.22


60 MLD WTP

Pump House ( 7.0 x 3 x 5.0 ) ( 1 nos.)


Sr.No Description L B H Nos. Total Note
Foundation m m m Cum.
office cum laboratory
1 Columns 7 0.5 0.5 6 10.5
2 Beam 20 0.3 0.5 2 6
3 Slab 7 3 0.15 1 3.15
4 Foundation 2.25 2.25 0.5 6 15.1875
5 SOG 7 3 0.125 1 2.625

Total RCC 37.4625


Total RCC 19.7
PCC 2.45 2.45 0.1 6 3.6015
SOG PCC 7 3 0.1 1 2.10
Beam PCC 20 0.3 0.1 1 0.6
Total PCC 6.30 Cum.

0-1.5m depth 2.45 2.45 1.5 6 54.0225


60 MLD WTP

Pump House ( 10.0 x 6.0 x 3.0 ) ( 1 nos.)


Sr.No Description L B H Nos. Total Note
Foundation m m m Cum.
COTDM House
1 Columns 4.5 0.5 0.5 6 6.8
2 Beam 26 0.3 0.5 2 7.8
3 Slab 10 6 0.15 1 9
4 Foundation 2.5 2.5 0.4 6 15
5 SOG 10 6 0.125 1 7.5

Total RCC 46.05


Total RCC 23.6
PCC 2.7 2.7 0.1 6 4.374
SOG PCC 10 6 0.1 1 6.00
Beam PCC 26 0.4 0.1 1 1.04
Total PCC 11.41 Cum.

0-1.5m depth 3 3 1.5 6 81