Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

PCAB PORTAL LICENSING WORKSHOP

SPECS The society of PH Electrotechnical Contructors and Suppliers, Inc


PhilEnergy

Objective Online application, reduce requirements, shorten joint venture license to 3hrs, reduce process by days
application-renewal-upgrading for few requirements needed (objective)
address renewing/applying online to go thru online prior to Sept 15 2022

PCAB Categorization Table


bit.ly/PCABGuide

PCAB
under DTI
CIAP
CIAC PDCB PCAB pocb CMDF
file case against contracontruction quality licensing a overseas c construction trainins and development

PCAB - RA 4566 passed in 1965


Purpose ensure safety to the public for quialified and reliable contractors are allowed to undertake construction
"Construction Contractor"

Types of License
1. Regular -Proprietorship
-Corporation
Regular 60% of domestic equity participation
RA4566 Contracting Fiscal Yea
RA 11711 (amended) Contracting Fiscal year (issue date)

2. Special joint venture, consortium, foreign constructor for a single specific project
*joint ventures should have a single license on top of their individual licenses
consortium - cooperative agreement bet licensed constructor and non-constructors

3. Pakyaw teritorial is City/Municipal licenses (small scale contractors)


only for Sole Prop

Registration for Govt Infrastructure Projects


**Government projects are optional - application for GIP
Valid for 3yrs

Doc uments Requirements for Category/size upgrade


Contract Agreement
Cert of Completion
Cert of Tax (BIR 2307)
Quartery Vat (BIR 2550Q)
Alphalist SWAT
**BR 201, Categorization Table eg Medium A

Application for License


Common
1. NO more pre-screening
2. Download/upload: SEC Articles
AMO/STE Cert
Complete set of AFS
Bank Certs
BR on duties and functions of the AMO
3. Upfront payments that are Non Refundable

Section 2
FINANCIAL INFORMATION/DISCUSSION

DOSRI Advances to directors/officers/stockholders & related interest CPA


Sched of AR upload signed by CPA

Renewal - should be stamped and received by BIR, signed by CPA and AMO
ITR (Year end)
Receipt of ITR
AFS (year end) for the preceding taxable year

processing/approval online duration (new & renewal)


max of 20 days after submission
3hrs, reduce process by days

contact: 895 4298


wed to undertake construction

Types of Applications
New contractors
Renewal
Amendments Addtl classification
Upgrading category
Change of business name, name & stats, authorized officer
Special License Foreign, JV, Consirtium, Project Owner)
Registration for Govt Infrastructure Project (Online)

License Criteria
1. Legal & managerial proprietor himself, territorial scope shall be "national"
2. Financial Qulification
3. Technical Quialification sustaning technical employee
4. Over-all Credit Points
5. Integrity

License Category
Evaluation based on the criterua quantified by credit points on scales as determined by board

License Classification
based in STE (Sustaining Technical Employees) - if gustong malaking category, mas maraming STE
General Engineering (horizontal works) Civil Engrs (CE)
General Building (vertical works) CE & Architechs are required
Specialty Classification (special works) many classifications under this (please see photo)
**project qualification is only limited to the PRC license owned
Thresholds/Limits
CoHand - 500k or 2% of net worth
Pre operation Exp - 20% of net worth per AFS
Advances to DOSRI - ''
Construction in progress - 10%
Receivables - 50% of net worth per AFS

should have a valid PRC license (unexpired)


BOA accredited (request for certificate)
**important to prepare Notes to FS
Authorized Managing Officer (AMO)
with Exam, qualifications, and PCAB categorization table series of 2017
CosH Seminar should be finished

STEs Engineer / Architech (automatic PRC holder)


min. of 3yrs, max of 30 yrs in experience
full time employee of the contractor

Disquialification
govt employee, abroad, full time instructor, abroad
anti conduct
liable for disciplinary action
offence in moral turpitude
failure to notify the PCAB Board of disassociation from the former employer

Statement of construction experience


name/complete address of employer
title of projects finished
location of projects finished (even general info)
**include work classification (if GE/GB)

**STE Classification Guide for qualification

You might also like