MAIN WALL
230MM THICK
B' CONTINUOUS GROOVE FOR
TUCKING DAMP PROOFING
TREATMENT PROTECTION LAYER WATERPROOFING PROTECTION LAYER WATERPROOFING
UNDERGROUND EXTERIOR WALL UNDERGROUND EXTERIOR WALL
A DAMP PROOFING TREATMENT
INJECTION VALVE
B
A'
A RCC WALL GRAVEL FILLING
300MM THICK CONE CRACK
FLOORING 10 MM THICK
FLOOR SLAB
BRICK WALL
C FLAT BRICK COURSE 75MM
300MM THICK C C' DAMP PROOFING 20MM
ENTRANCE
BACKFILL INJECTION
DIRECT INJECTION
D SCALE (1:25) SCALE (1:25) SECTION B-B'
LEAN CONCRETE
DRAIN PIPE 150MM DIA DRAIN PIPE 150MM DIA
COLUMNS GRAVEL BED
300 X 400 MM
SOIL
ROUND WATERPROOFING MEMBRANE
E
DRAIN PIPE
DRAINAGE PIPE WATERPROOFING REINFORCEMENT WELDING
MAIN PIPE
150 MM DIA
150 MM DIA SECTION A-A' WELDING THERMO SCREWS
PAVEMENT SLAB 35MM THICK
PROTECTIVE LAYER 5MM THICK
SCALE (1:25) WATERPROOFING MEMBRANE
F PROTECTIVE LAYER
SUMP PIT
PILE HEAD
BINDING CONRETE
1 2 3 4 5 6
G.L
CONTINUOUS GROOVE FOR TUCKING PILE FOUNDATION WATERPROOFING
PLAN DAMP PROOFING TREATMENT
SCALE - 1:10
DAMP PROOFING TREATMENT