Abstract
1.0 Introduction 01
2.0 Project Benefits and Significance 02
3.0 Target Users 03
4.0 Report Content 04
5.0 Study Area 05
6.0 Key Challenges and Opportunities 06
7.0 Existing Profile 08
8.0 ECRL Development Impact 10
9.0 ECRL Land Use Strategic Framework in The 12
National Planning Context
ABSTRACT
The Ministry of Housing and Local Government (KPKT), through the Department of Town and Country Planning (PLANMalaysia),
has initiated the development of an Integrated Land Use Masterplan for the East Coast Rail Link (ECRL), also known as
PeGTaECRL. The preparation of this masterplan is over a period of 18 months, commencing from 15 March 2021 to 15 September
2022.
The implementation of the ECRL project by MRL Sdn. Bhd. extends across the jurisdictions of multiple Local Authorities (PBT) and
involves engagement with numerous relevant agencies. Therefore, coordination is crucial to ensure consistency in planning and
supervising development within the ECRL corridor, thereby facilitating the achievement of development objectives and trajectories.
The primary objective of PeGTaECRL is to provide guidance for land use development planning along the ECRL alignment and in
the vicinity of its stations. The goal of this masterplan is to maximize the ECRL's potential in enhancing regional growth and
strengthening the nation’s development growth. Through land use planning, suitable ECRL stations will be identified for Transit
Oriented Development (TOD), establishing a planning framework in the East Coast Region with consideration for ECRL's role as a
development catalyst aimed at reducing regional disparities.
It is anticipated that this masterplan will serve as a comprehensive guide for fostering sustainable development, aiming to achieve a
more balanced development between the East Coast Region and the West Coast Region of the nation while maximizing ECRL's
potential across four (4) states, 18 districts, and 31 PBTs. Additionally, PeGTaECRL is expected to function as a strategic document
guiding planning and investment for prospective investors, facilitated through collaboration with Malaysian Investment Development
Authority (MIDA), thereby yielding positive impacts on overall development.
INTRODUCTION
N
PeGTaECRL is to guide land use planning and development Kota Bharu
along the ECRL alignment and the surrounding area of the
station. It aim to optimize the ECRL potential to support Pasir Puteh
regional growth and to strengthen the national growth. Jerteh
Selangor, Pahang, Terengganu, and Kelantan are the four
(4) states that are included in the ECRL alignment. The Bandar Permaisuri
ECRL alignment is divided into three (3) section which are
Section A, B and C. Kelantan, Terengganu, and Pahang are
aligned in sections A and B. while Pahang and Selangor are Kuala Terengganu
aligned in sections C.
Dungun
ALINGMENT
LENGTH 665 km Kemasik
Section A Chukai
Kota Bharu - Dungun
210 km Cherating
Section C 7 Station
Temerloh ECRL Station - J. Kastam ECRL Station
*10 passenger station and 10 passenger & freight station.
TOP SPEED
LEGEND:
ECRL Alignment (Section A)
Passenger 160 km/hour (km/h) ECRL Alignment (Section B)
Services Kota Bharu - Jalan Kastam = 4 Hours 30 Minutes ECRL Alignment (Section C)
ECRL Station (Section A)
80 km/hour (km/h) ECRL Station (Section B)
Freight
ECRL Station (Section C) Key Plan
Services Pasir Puteh - Jalan Kastam = 8 Hours
1
PROJECT SIGNIFICANCE
01 COORDINATE ECRL DEVELOPMENT AND SERVICE CATCHMENT AREA
with policy and land use planning strategy at Federal Government, State and Local level.
PROJECT BENEFITS
REGIONAL CONNECTIVITY SAFE MODE OF TRANSPORT
01 05 Provide safe alternative mode of public
Improve the connectivity from East Coast Region
to West Coast Region and vice versa transport for long distance journey.
2
TARGET USERS
PeGTaECRL is produced as a reference and a guideline for all relevant parties at all levels, including the public,
landowners, states, local governments, and investors who are interested in land use planning and development of
ECRL and the area around it.
Refer to the type of Refer to Coordinate and Infrastructure and Coordinate and
land use and surrounding estate plan state and Utility Planning monitor
development development regional Guideline. development plan
PURPOSE OF USE
3
REPORT CONTENT
The Masterplan in prepared in two (2) volume which are Volume I and Volume II for each state.
Chapter 1: Introduction
Chapter 2: Planning Policy Framework
Chapter 3: Key Challenges and Opportunities
Chapter 4: Strategic Direction
Chapter 5: Integrated Land Use Masterplan Planning Strategy
Chapter 6: Implementation and Monitoring Mechanisms
Chapter 7: Summary
*Volume II: Implementation Action Plan report must be read concurrently with Volume I: Main Report
4
STUDY AREA
PeGTaECRL will effectively and efficiently manage urban expansion by identifying the unique functions of the station
and encouraging TOD and COD development close to the station to improve connectivity and promote logistical
growth.
2. Planning Area
• Focus on commercial, industrial and
residential area
• Radius 1.5 - 5km from station
• Urban expension area
• Within feeder bus coverage
3. Catchment Area
• Focus on port, airport, tourism centre
and industrial area
• Estimated 30 minutes travel time from
the station
• Outer radius area 15km which indirectly
benefiting the ECRL development
5
KEY CHALLENGES AND OPPORTUNITIES
KEY CHALLENGES
Promote the development and development of the Eastern Coast Region as well as the central
region of the Malaysian Peninsula through enhanced accessibility and mobility potential of
ECRL.
Downstream sector and local economy development opportunities for the East Coast Region
as well as Selangor specific industrial development for better market value and logistics
improvement.
6
KEY OPPORTUNITIES
Dispersion of development pressure from the main urban areas to other areas and potentially
to be developed for more optimal use.
The potential to develop ECRL station with special functions / activities to support logistic
services, freight, international and tourism gateway.
*Note: TOD - Transit Oriented Development, COD - Cargo Oriented Development Refer PeGTaECRL Volume I - Main Report page 3-2
7
EXISTING PROFILE
POPULATION SOCIO ECONOMY
The population within a 15 km The following socioeconomic Selangor State surpasses other
radius and the catchment area elements were observed in the East Coast states in terms of
are the two (2) components used study as it examined the current household income, labour force
to determine the population of socioeconomics for the participation, and urbanization
the study area. concerned states. rate.
Catchment Area:
100% Kuala Lumpur
Residents outside the 15 km 49.6% Kelantan
radius and with a 30-minute 65.0% Terengganu
commute to the station and
62.7% Pahang
within other main settlement.
94.5% Selangor
15km radius:
RM3,563 Kelantan
Residents who will directly
RM5,545 Terengganu
be impacted by the
RM4,440 Pahang
masterplan's development.
RM8,210 Selangor
57.6% Kelantan
57.6% Terengganu
64.4% Pahang
72.8% Selangor
8
ECONOMY
The economic status between the four states is evaluated to perceive its performance and economic strength.
Selangor is the main contributor to Malaysia economic prominently on construction sector compared to other
states in East Coast region which are more reliant on the agricultural and service sectors.
PeGTaECRL will offer prospects for the growth of the East Coast Region's cross-state service market,
commodities market and labour sharing in the East Coast Region, which can directly form regional economic
agglomeration.
1.80%
Pahang
Terengganu RM55.0 Billion
1.20%
0.73% RM34.0 Billion
Kelantan Selangor
RM25.2 Billion RM326.8 Billion
0.06%
Kelantan Terengganu Pahang Selangor
trillion
(2020)
3 times increase numbers of passager using ECRL
Note:
service and ensuring the service by 2040 • The calculation of GDP is at a constant price.
• GDP at a constant price adjusted to take into account the impact of inflation
Souice: Structure Plan, Local Plan, My Local Stats (DOSM) and Consultant's Calculation
10 Refer PeGTaECRL Volume I - Main Report page 3-53, 3-55 & 3-60
IMPACT TOWARDS STATES GDP ESTIMATED URBAN GROWTH FOR
KELANTAN
COMMERCIAL AND INDUSTRIAL LAND USE
RM25.2 billion RM29.2 billion Estimated Urban Growth for 2.84%
(2020) (2040)
Commercial and Industrial Land Use (Commercial)
(After the Operation of ECRL) by
TERENGGANU
Station in East Coast Region and 2.90%
RM34.0 billion RM48.2 billion Selangor. (Industry)
(2020) (2040)
11
ECRL LAND USE STRATEGIC FRAMEWORK IN THE
NATIONAL PLANNING CONTEXT
5 ECER NODE
▪ NODE 1: SPECIAL ECONOMIC
Tumpat
ZONE
KOTA BHARU Pengkalan Chepa NODE 2: Kerteh - Kuantan - Pekan
Bandar Baru Tunjong CROSS BORDER
Kubang
Kota Kerian
Bharu
Pasir Mas DEVELOPMENT ▪ NODE 2: CROSS BORDER
Mulong Kota Bharu - Jeli - Besut
ECERDC
Kadok Peringat DEVELOPMENT
KOTA BHARU Ketereh
Tok Bali
Kota Bharu - Jeli - Besut
(BACHOK – KOTA
NODE 3:
BHARU – MACHANG – Pasir Puteh
PASIR MAS – PASIR
Pasir Puteh
Kg Raja KUALA TERENGGANU
▪ NODE 3: KUALA TERENGGANU
DEVELOPMENT TRIAGLE
PUTEH – TUMPAT) PDZ Tanah Machang Jertih DEVELOPMENT TRIAGLE
Merah Jerteh KTCC - Kenyir - Dungun
Kg Saujana KTCC - Kenyir - Dungun
Penarik SOUTH
Kg Guntong Luar CHINA SEA
▪ NODE 6: WEST PAHANG BARAT
Bandar Permaisuri
Bandar Permaisuri
DEVELOPMENT AREA
Chalok KUALA Bentong - Raub
TERENGGANU
Setiu
Manir KUALA ▪ NODE 7: DARA – JENGKA
Cenering TERENGGANU PDZ
Temerloh - Mentakab - Maran - Bera
B. Payong
Marang
Kuala Terengganu
2 CONURBATION
Kuala Telemong
Wakaf Tapai -
Bukit Payong
Kuala Berang Ajil Marang
Hulu
Gua Musang Terengganu
▪ NATIONAL CONURBATION
Rantau Abang Klang Valley
Dungun
Dungun ▪ EAST CONURBATION
Kuantan (Regional Centre) -
Gambang & Chukai (Main Centre)
RFN4
Paka
NODE 1: Ketengah Jaya
SPECIAL ECONOMIC ZONE Kemasik
Kerteh
3 ZONE
(SEZ) ECER
Kerteh - Kuantan - Pekan
(PROMOTED
Kuala Lipis DEVELOPMENT ZONE)
Binjai
NODE 6: WEST PAHANG Chukai
DEVELOPMENT AREA
Chukai ▪ PDZ KOTA BHARU
Cendur
Bentong - Taub
Kg. Kubang Ikan ▪ PDZ KUALA TERENGGANU
NODE 7: DARA - JENGKA
Cherating
Temerloh - Mentakab - Kg. Sg. Ular ▪ PDZ JERANTUT
Maran - Bera
Balok
Kuantan Port City TOWN WITH SPECIAL FUNTION
Bukit Kuantan
Bukit Sagu
Bukit GohKotaSAS
Beserah 1. Global City - Kuala Lumpur
Kg Sg Panching Panching
JERANTUT – BANDAR TUN
KUANTAN 2. State Capital - Kota Bharu,
RAZAK (MARAN) – TEMERLOH Maran Paya Besar Kuala Terengganu, Kuantan,
Kuala Kg. Sanggang Kg Kuala Sentul
– MENTAKAB PDZ Gambang
Shah Alam
DPN2, RSN NEGERI
Krau EAST
Batang Kali Kg. Lebu Kg. Songsang Kg Sentosa Maran
Lepar Hilir CONURBATION
3. Catalyst Centre- Jerteh,
Kuala Selangor Ijok Bukit Beruntung Bentong Lanchang Mentakab Temerloh Tajau
Kerteh, Bentong, K. Selangor
Bukit Tinggi Maran
Kg Lubuk Paku
Awah 4. PSWN Terengganu - Dungun,
Bandar Serendah
Puncak Alam Rawang
Bentong
Temerloh Chukai, Jerteh
Kapar Gombak Janda Baik Pekan 5. Tourism Gateway - Cerating,
Puncak Alam Bandar Permaisuri, Jerteh,
Petaling
MALACCA Ulu Klang
Jaya
LEGEND: Bera Dungun, Paya Besar, Bukit
STRAITS ITTKUALA
Gombak
LUMPUR Urban Hierarchy: Growth Centre/Main
Kapar Catchment Area Growth Node ECER: Tinggi, Kuala Kubu Bharu
SHAH ALAM ECRL Station
Global City
Klang
Regional Centre Conurbation 6. Institutional Hub - Gambang,
(Section A) Promoted Development Zone
Jalan Kastam
Pelabuhan Teluk Panglima ECRL Station State Capital Puncak Alam
Klang NATIONAL Main Centre Catalyst Centre
Garang (Section B) 7. Royal City - Klang
CONURBATION Local Centre Agropolitan Centre
ECRL Station Development Focus Area
(Section C) Sub Local Centre 8. Port City- Pelabuhan Klang
12
REGIONAL PLANNING
Tumpat
KOTA BHARU Pengkalan Chepa
Kota Bharu ECRL Station Bandar Baru Tunjong
Level T1: Regional, Capital State TOD Kubang Kerian
Kota Bharu The development of ERCL will
Pasir Mas
Mulong
Peringat
uplift the national and local
Kadok
Pasir Puteh ECRL Station Ketereh economies by providing better
Tok Bali
Logistic Centre for Kelantan and North
District in Terengganu Pasir Puteh Pasir Puteh connectivity between the east
Kg Raja
Tanah Machang Jertih
and central regions of the
Merah
Jerteh ECRL Station Jerteh community and attracting new
Kg Saujana
• The premier ecotourism gateway
• Workforce supply to Pasir Puteh
Penarik SOUTH investment to the region.
Kg Guntong Luar
and Kota Bharu Bandar Permaisuri
Bandar Permaisuri
CHINA
SEA Main aspect from the
Chalok KUALA
Bandar Permaisuri ECRL Station TERENGGANU development concept of
Setiu
Workforce supply to Kota Bharu and Kuala
Terengganu
Manir PeGTaECRL:
Cenering
B. Payong
Marang Main Transit Oriented
Kuala Terengganu ECRL Station
Level T2: Urban, Capital State TOD
Kuala Telemong Kuala Terengganu
Wakaf Tapai -
Bukit Payong
1 Development (TOD)
Kuala Berang Ajil Marang Centers
Hulu
Gua Musang Terengganu
Dungun ECRL Station
Institutional Gateway Connectivity with
Rantau Abang 2 National Logistics
Kemasik ECRL Station Infrastructure
Puncak Alam ECRL • Gas & petroleum industrial activity
Station
Dungun
Dungun
Kapar ECRL • Workforce supply to Kerteh, Paka
• Workforce supply to Cargo Oriented
Station
• Workforce
Serendah and F.T Kuala
and Chukai
Paka 3 Development (COD)
Lumpur
supply to Klang Ketengah Jaya
• North Selangor Institutional Chukai ECRL Station Kemasik
and Klang Port Gateway Kemaman Port and industrial area Kerteh Activities / Station
• Gateway to tourism area in
Kuala Selangor
4 Special Function
Kuala Lipis
Jalan Cherating ECRL Station Binjai
Chukai Connectivity
Kastam
ECRL
Bandar Serendah
ECRL Station (Cargo)
• International Tourism Gateway
• TOD T2: Urban
Chukai
Cendur
5
Station Kg. Kubang Ikan Cherating
• Logistic Hub at Serendah Preservation and
• Logistic
Centre and
• Transportation equipment
Industrial Activity Temerloh ECRL Station
Kg. Sg. Ular
Balok
6 Conservation of Natural
East and (automotive, locomotive, • Central Pahang Logistic Hub Kuantan Port City Asset and Geo Disaster
West Port aerospace) and supporting • Timber industry and commodity Bukit Kuantan
• Halal Bukit Sagu
Risk Management
industry crops activities
Industrial Bukit GohKotaSAS
Beserah
• Workforce supplyPerhubungan • Gateway to National Park Area
to north ke Raub, Kg Sg Panching Panching
Activity and Selangor to F.T. Kuala
Cameron Highland (Jerantut)
Perhubungan ke KUANTAN
maritime Lumpur Jerantut Maran
Kuala Kg. Sanggang Kg Kuala Sentul Paya Besar
Gambang
Krau
Batang Kali Kg. Lebu Kg. Songsang Kg Sentosa Maran
Lepar Hilir
Kuala Selangor Ijok Bukit Beruntung Bentong Lanchang Mentakab Temerloh Tajau Kuantan Port City
Bukit Tinggi Maran
Kg Lubuk Paku ECRL Station
Awah
Bandar Serendah Bentong
Chemical and petrochemical
Puncak Alam Rawang Temerloh Maran ECRL industrial activity
Janda Baik Perhubungan
Kapar Gombak Station (Cargo) Pekan
ke Bera LEGEND:
Puncak Alam
Petaling KotaSAS ECRL Station ECRL Station (Section A)
MALACCA Ulu Klang
Jaya Bera • Capital State TOD Centre ECRL Station (Section B)
STRAITS ITTKUALA
Gombak
LUMPUR Bentong ECRL Station
Kapar and East Conurbation Centre ECRL Station (Section C)
SHAH ALAM • Gateway to highland tourism area • TOD T1: Regional
Klang ITT Gombak ECRL Station • Highland agriculture activity and Economic Growth Area:
Jalan KastamPelabuhan • The main TOD center of the West heavy vehicle automotive industry
Teluk Panglima
Coast Region Paya Besar ECRL High Impact Project
Klang • Energy supply to F.T. Kuala
Garang• Main gateway from Klang Valley Station Tourism Area
Lumpur
area Institutional Gateway Natural Disaster Prone Area:
Flood Prone Area
13
SPATIAL DEVELOPMENT CONCEPT
‘PeGTaECRL is the driver for regional development
towards sustainable land use change’
The development concept will be based on the findings of the development suitability of each station to
support the planning priorities that form the backbone of the implementation of the strategies and policies of
the Masterplan. The planning of the PeGTaECRL takes into account various development strategies at the
federal, state and district levels, which are translated into spatial form.
The plan and strategy outlined in the PeGTaECRL will make sure that land use planning and development
surrounding ECRL stations are coordinated to support rail transportation services in order to foster investment
opportunities and effective land use planning.
Legend:
Global City
Regional Centre
State Centre
Main Centre
Local Centre
T1 T3 T3 T3 T2 T3 T3 T3 T2 T3 T1 T3 T4 T2 T3 T1 T2 T3 T3 T1
KOTA BHARU, KOTASAS, KUALA TERENGGANU, PASIR PUTEH, JERTEH, BANDAR MARAN
ITT GOMBAK AND JALAN CHERATING, TEMERLOH AND PERMAISURI, DUNGUN, • Economic and employment
KASTAM BANDAR SERENDAH KEMASIK, CHUKAI, KUANTAN centre and main sattlement zone.
• Significanly importance to PORT CITY, PAYA BESAR, • Neighborhood area within urban
• Significanly importance to
state level. BENTONG, PUNCAK ALAM AND zone or urban fridge area.
regional, national and global
• Economic, administrative and KAPAR
level.
• Economic, administrative and employment centre within • Economic and employment
employment centre within main urban centre. centre and main sattlement zone.
main urban centre. • Activity / special function focus
• International gateway. area.
Refer PeGTaECRL Volume I - Main Report page 4-3
14
PLANNING DIRECTION
GOALS
INTEGRATED LAND USE MASTER PLAN REALIZES ECRL’S POTENTIAL TOWARDS
SUSTAINABLE LAND USE CHANGE TO INCREASE THE COMPETITIVENESS OF THE
NATIONAL CONURBATION AT THE INTERNATIONAL LEVEL AND DRIVE THE
DEVELOPMENT OF THE EAST COAST REGION
3
STRATEGIC THRUST
1 2 3 STRATEGIC
THRUST
INTEGRATION OF LAND USE STRENGTHENING
REGIONAL AND LOCAL
12
PLANNING AND REGIONAL CONNECTIVITY, MOBILITY AND
ECONOMIC GROWTH DRIVERS
SERVICES SUPPORTING INFRASTRUCTURE
S1-1: New Township TOD/TAD S2-1: Regional Economic Strengthening S3-1: Accessibility, Mobility and PLANNING
S1-2: COD and Area Planning Existing Growth Strong Connectivity STRATEGY
Economy S2-2: Strengthening the Industrial Sector S3-2: Integrated Transportation System
21
S1-3: Development Control S2-3: Rapid Development of the Sector and Comprehensive
S1-4: Urban Design Planning Business in the Area S3-3: Pedestrian and Bicycle Networks
and ECRL Transport ECRL planning Interconnected
S2-4: ECRL As a Mode of Transport S3-4: Availability of Infrastructure and
Main Tourism Sector Utilities For Catalysing ACTION
Development
29
Action
Detail
6
13
Action
Detail
6
27
Action
Detail
69
DETAIL
KEY ENABLER
14
MANAGEMENT AND IMPLEMENTATION OF EFFECTIVE DEVELOPMENT
▪ Planning
3 CATEGORY ▪ Investment
▪ Governance
Key Enabler KEY
ENABLER
3 Strategic Thrusts
IM PLEMENTATION ACTION PLAN
supported by 12
Planning Strategies
and 14 Key Enablers.
TOTAL COST OF
MASTERPLAN’S OVERALL Planning strategy are
567 PROJECT MASTERPLAN
RM 44.57 formulated and
PROJECT Billion detailed with
21 Actions and 69
Details.
15
STRATEGIC THRUST 1
INTEGRATION OF LAND USE PLANNING AND REGIONAL
SERVICES
16
STRATEGIC THRUST 2
REGIONAL AND LOCAL ECONOMIC GROWTH
DRIVERS
18
KEY ENABLER
MANAGEMENT AND IMPLEMENTATION OF
WORKABLE DEVELOPMENT
04 Attracting new investment and strengthening existing EN-2.2 Economy Accelerator Project (EAP)
investment organisations.
GOVERNANCE
05 Provide marketing and e-commerce training and human capital
courses to community and SME entrepreneurs.
EN-3.1 Cooperative Relations With Neighboring Countries
06 Facilitate the development application process and
coordination among agencies, state government, and Local
Authority. EN-3.2 Facilitating Development Planning
19
ECRL INTEGRATED LAND USE MASTERPLAN
Kota Bharu
Pasir Puteh
Jerteh
Bandar Permaisuri
Kuala Terengganu
KELANTAN
TERENGGANU
Dungun
Kemasik
Chukai
PAHANG Cherating
Kuantan
KotaSAS Port City
Paya Besar
SELANGOR Bentong
Maran
Bandar Serendah Temerloh
LEGEND:
ECRL Alignment TOD Boundary
Planning Boundary
Highway
Catchment Boundary Puncak Alam
Main Road ITT Gombak
KTM Alignment
City Hierarchy:
State Boundary Global City Kapar
Regional City
Port
State City
Airport Main City Jalan Kastam
Local City
Small Settlement Center
20
KELANTAN PAHANG
T1 T3 T2 T3 T1 T3
TOD COD TOD COD TOD TOD
KOTA BHARU ECRL PASIR PUTEH ECRL CHERATING ECRL KUANTAN PORT CITY KOTASAS ECRL PAYA BESAR ECRL
STATION STATION STATION ECRL STATION STATION STATION
T4 T2 T3
TERENGGANU TAD TOD TOD
T3 T3
TOD TAD
T2 T3 T1 T2 T3
KUALA TERENGGANU ECRL DUNGUN ECRL ITT GOMBAK ECRL BANDAR SERENDAH PUNCAK ALAM ECRL
STATION STATION STATION ECRL STATION STATION
T3 T3 T3 T1
*Notes: TOD - Transit Oriented Development, COD - Cargo Oriented Development, TAD - Transit Adjacent Development
21
KOTA BHARU ECRL STATION
Station Role : Passenger Station Function / Special Activities : Kelantan Capital State Station and International Gateway Total Project : 38
Station Hierarchy : T1 - Regional Station (TOD) Main Local Authority : Majlis Daerah Ketereh Perbandaran Islam Overall Cost : RM3.8 Billion
130
+15,354
Integrated Public Population
Transport Terminal
RM4,663
Average Median Income
208
207 +3,489
House Unit
RM36 Million
Premium Charge
Main focus: Food
8 Technology Industry Cluster RM58 Million
(Agro-Food and Food Development Charge
Processing) or Downstream
Industry based on
To strengthens the Providing SME
existing business and Forwarding To optimize the use of
service areas at Bandar Centers at existing industrial areas
Baru Tunjong, Mulong, Kawasan at Pengkalan Chepa 1 & 2,
Implementation Mechanism:
Pasir Tumboh, Tendong Perindustrian IBS Machang and Pasir
and Kubang Kerian Pengkalan Chepa Mas Halal Hub. ▪ TOD area ownership 100% by
Perbadanan Bandar Baru
Tunjong.
The main project proposals for Kota Bharu ECRL Station are: ▪ Implementing agencies
• 1,700 hectare of planning area in RKK Bandar Baru Tunjong included in the TOD area and involved:
planning area. ✓ MDKPI ✓ APAD
• 695 hectares of residential area expansion to support new development are. ✓ MPKB-BRI ✓ TNB
• Bandar Baru Tunjong Integrated Public Transport Terminal and feeder bus routes. ✓ PBN ✓ ECERDC
✓ JKR ✓ MIDA
• 13 traffic management proposals consist of 8 road upgrading proposals and 5 new road ✓ KKR ✓ MOTAC
proposals. ✓ MRL ✓ MB Inc
• Proposed flood risk mitigation measures in Pengkalan Datu River and Kelantan River. ✓ JPS ✓ Industry
✓ UPEN Players
22
PASIR PUTEH ECRL STATION
Station Role : Passenger and Freight Station Function / Special Activities : Focus Activity for Cargo Oriented Development Total Project : 38
Station Hierarchy : T3 - Sub Urban Station/Special Activity (COD) Main Local Authority : Majlis Daerah Pasir Puteh Overall Cost : RM2.38 Billion
To Tok Bali
No. of Projects & Implementation Phase
PHASE
PROPOSALS
1 2 3
Land Use & Transportation - 4 -
To Pasir Puteh
Urban Design &
D161 5 4 -
Connectivity
Public Transportation &
2 12 2
Road
Economy 4 5 -
Providing SME
Forwarding Centers at D20 Project Impact for Pasir Puteh
Logistic Hub Tok Bali ECRL Station (Year 2040):
(Kampung Jeram)
Proposed
Logistic Hub
+11,612
• Main focus: Population
Downstream Industry D161
Cluster as well as Oil 2.0% / year
and Gas, a service Industry Growth Rate
center for industry and
a tourism center.
1.8% / year
Commercial Growth Rate
• To optimize the use of
existing industrial
areas at Taman
Perindustrian Tok Bali
RM34 Million
Premium Charge
D20
LEGEND: RM29 Million
Proposed Commercial Development Charge
D159
Proposed Commercial
(Mixed Use Development)
Proposed New Road
Proposed Road Upgrading
Implementation Mechanism:
Proposed Spurline
Proposed Feeder Bus Route ▪ Involvement of land owners
and private developer.
The main project proposals for Pasir Puteh ECRL Station are: ▪ Implementing agencies
involved:
• Proposed commercial zoning (mixed use development: commercial 70% + residential 30%)
(plot ratio = 1:3) for Bandar Baru Cherang Tuli on 80 hectares of government owned land. ✓ MDPP ✓ APAD
• Proposed commercial and residential growth centers near ECRL station with an area of 33 ✓ PBN ✓ TNB
hectares (mixed use development: commercial 70% + residential 30%), 23 hectares (mixed use ✓ JKR ✓ ECERDC
development: industry 70% + commercial 30%) and 35 hectares of area for commercial zoning ✓ KKR ✓ MIDA
(plot ratio = 1:3). ✓ MRL ✓ MOTAC
• The provision of logistic hub (5 - 20 hectares depends on storage demand).
✓ JPS ✓ Industry
✓ UPEN Players
• Proposed spurline from Pasir Puteh ECRL Station to Tok Bali through the proposed Bandar
Baru Tok Bali area.
23
JERTEH ECRL STATION
Station Role : Passenger Station Function / Special Activities : Tourism Gateway to Marine Park and Heritage Tourism Total Project : 30
Station Hierarchy : T3 - Sub Urban Station/Special Activity (TOD) Main Local Authority : Majlis Daerah Besut Overall Cost : RM2.54 Billion
Proposed
Bridge Project Impact for Jerteh ECRL
Station (Year 2040):
To Bandar Permaisuri
+2,621
Through Jalan T159 Population
• Main focus:
The Main Tourism
+558
Entrance of House Units
Terengganu Island Public transport terminal
and Marine Park, Food (feeder terminal) 2.1% / year
Technology Cluster Commercial Growth Rate
and Main Education
Hub of ECER. RM5 Million
Premium Charge
• To strengthens the LEGEND:
existing business Proposed Commercial
and service areas at (Mixed Use Development)
RM13 Million
Pasir Akar, Alur Keladi Development Charge
and Bandar Jertih. Flood Mitigation
Proposed New Road
Proposed Road Upgrading
To optimize the use of
existing industrial areas Proposed Feeder Bus
at Kawasan Perindustrian T5 Route Implementation Mechanism:
T163
Gong Medang Proposed Public Transport
Terminal ▪ Involvement of land owners
and private developer.
The main project proposals for Jerteh ECRL Station are: ▪ Implementing agencies
involved:
• Proposed 29 hectares area as commercial (mixed use development: residential 80% +
commercial 20%) (plot ratio = 1:4) and 10 hectares area as commercial area (plot ratio = 1:4) ✓ MDB ✓ TNB
in TOD area. ✓ PBN ✓ ECERDC
• Provision of public transport terminal (feeder station to Public Transport Terminal in Bandar ✓ JKR ✓ MIDA
Jertih). ✓ KKR ✓ MOTAC
• 7 traffic management proposals consists of 4 road upgrading proposal and 3 new road
✓ MRL ✓ PMINT
proposal (among them is bypass connecting Jalan T163 - Jalan T5 - Jalan T159).
✓ JPS ✓ Industry
✓ UPEN Players
• Sungai Besut flood mitigation plan proposal. ✓ APAD
24
BANDAR PERMAISURI ECRL STATION
Station Role : Passenger Station Function / Special Activities : Tourism Gateway to Pantai Penarik Total Project : 31
Station Hierarchy : T3 - Sub Urban Station/Special Activity (TAD) Main Local Authority : Majlis Daerah Setiu Overall Cost : RM2.4 Billion
k
Proposed Commercial
en a ri
Proposed Open Space & Recreational
No. of Projects & Implementation Phase
tai P
Flood Mitigation
Pan
Ecology Network T-SL2 (CFS1-SL5) PHASE
PROPOSALS
To
Proposed New Road 1 2 3
Proposed Road Upgrading Land Use & Transportation 3 2 -
Proposed Feeder Bus Route T1
Urban Design &
3
Proposed Integrated Public Transport 3 5 -
Connectivity
Terminal
Public Transportation &
- 7 2
Road
Economy 4 5 -
TOTAL 10 19 2
OVERALL TOTAL 31
• Main focus:
Agricultural Business Public
Cluster Transport
Project Impact for Bandar Permaisuri
Terminal
• To strengthens the STN ECRL ECRL Station (Year 2040):
existing business BANDAR PERMAISURI
and service areas at +2,507
Bandar Permaisuri Population
and Putera Jaya
3
+533
To optimize the use of House Unit
existing industrial areas
at Kawasan Perindustrian 3.6% / year
Saujana Commercial Growth Rate
Providing SME
RM0.9 Million
Forwarding Centers at Premium Charge
Kawasan Perindustrian
Saujana RM5 Million
Development Charge
T138
Implementation Mechanism:
25
KUALA TERENGGANU ECRL STATION
Station Role : Passenger Station Function / Special Activities : Terengganu State Capital Station Total Project : 41
Station Hierarchy : T2 - Urban Station (TOD) Main Local Authority : Majlis Daerah Marang Overall Cost : RM405.43 Billion
• Promote TOD concept development with proposed commercial (mixed use development) with ▪ Implementing agencies
an area of 235 hectares (commercial 40% + residential 60%) (plot ratio = 1:5) and 59 hectares involved:
residential area (density = 60 units/acre) ✓ MDM ✓ APAD
• The opening of new settlement in the planning area with proposed residential zoning of 1,191 ✓ MBKT ✓ TNB
hectares (density = 45 unit/acre) and commercial zoning of 24 hectares (plot ratio = 1:4). ✓ PBN ✓ ECERDC
• Public transport proposal for example proposed BRT and spurline to integrated transport ✓ JKR ✓ MIDA
terminal at Bukit Besar. ✓ KKR ✓ MOTAC
MRL ✓ PMINT
• 13 traffic management proposals consists of 7 road upgrading proposal 6 new road proposal. ✓ JPS ✓ Industry
✓ UPEN Players
26
DUNGUN ECRL STATION
Station Role : Passenger and Freight Station Function / Special Activities : Focus on Cargo Oriented Activities Total Project : 25
Station Hierarchy : T3 - Sub Urban Station/Special Activity (TOD) Main Local Authority : Majlis Perbandaran Dungun Overall Cost : RM28.57 Million
Rantau Abang
LEGEND: The size of planning area:
Proposed Commercial HPA 3,087.52 hectare
Dungun
(Mixed Use Development)
Ecology Network T-SL1 (FS2-SL4) No. of Projects & Implementation Phase
uala
Proposed New Road PHASE
K
3 PROPOSALS
To
132
Proposed Road Upgrading
1 2 3
Ke L
+7,487
Workforce
• Main focus:
Downstream Industrial
Hub of Mineral 1.3% / year
Processing and T116 Industry Growth Rate
To
Dungun Coastal
Pa
Tourism Development 3.3% / year
ka
Center.
-
Ke
3 Commercial Growth Rate
rte
h
• To optimize the use of
existing industrial RM3 Million
areas at kawasan Premium Charge
Perindustrian Lembah UiTM
3 Dungun
Silika, Kawasan
Perindustrian Al
RM35 Million
Development Charge
Muktafi Billah Shah
and Kawasan
T o Pa k a
Perindustrian Batu 7
Implementation Mechanism:
- Ke
To strengthens the
existing business and
rte h
27
KEMASIK ECRL STATION
Station Role : Passenger Station Function / Special Activities : Focus on Gas and Petroleum Industry Support Facilities Total Project : 24
Station Hierarchy : T3 - Sub Urban Station/Special Activity (TAD) Main Local Authority : Majlis Perbandaran Kemaman Overall Cost : RM467.26 Million
28
CHUKAI ECRL STATION
Station Role : Passenger and Freight Station Function / Special Activities : - Total Project : 26
Station Hierarchy : T3 - Sub Urban Station/Special Activity (TOD) Main Local Authority : Majlis Perbandaran Kemaman Overall Cost : RM735.28 Million
em
str
am
Proposed Commercial
ian
an
(MIxed Use Development) No. of Projects & Implementation Phase
Telu
Port
Proposed New Road
k Kalong
PHASE
-
Proposed Road Upgrading PROPOSALS
1 2 3
Proposed Feeder Bus Route
Land Use & Transportation - 2 -
Committed Project: Road Upgrading
Urban Design &
4 5 -
Connectivity
• Main focus: Public Transportation &
3 2 1
Heavy (Petrochemical) Road
and Metal Industry Economy 4 5 -
Cluster and Catalyst 131
Center with the main TOTAL 11 14 1
focus of maritime port OVERALL TOTAL 26
activities and logistics,
industry, tourism, trade
and finance, and
fisheries.
Project Impact for Chukai ECRL
• To optimize the use of
existing industrial Station (Year 2040):
areas at Kawasan
Perindustrian Teluk
Kalong, Kawasan
+9,962
Perindustrian Jakar III, Population
Kawasan Perindustrian
Bandar Cheneh Baru +2,120
and Kawasan House Unit
Perindustrian Mak
Lagam 2.1% / year
Commercial Growth Rate
To strengthens the
existing business and
RM42 Million
Development Charge
237 service areas at Mak
Chili, Chukai and
Binjai.
T128
29
CHERATING ECRL STATION
Station Role : Passenger Station Function / Special Activities : International Gateway (Air Transportation) Total Project : 21
Station Hierarchy : T2 - Urban Station (TOD) Main Local Authority : Majlis Bandaraya Kuantan Overall Cost : RM83.11 Million
+14,047
Population
+3,697
House Unit
3 3.7% / year
Commercial Growth Rate
RM8 Million
Premium Charge
30
KUANTAN PORT CITY ECRL STATION
Station Role : Passenger and Freight Station Function / Special Activities : Focus on Chemical, Petrochemical and Port Industry Total Project : 20
Station Hierarchy : T3 - Sub Urban Station/Special Activity (COD) Main Local Authority : Majlis Bandaraya Kuantan Overall Cost : RM775.70 Million
3.7% / year
Industry Growth Rate
3 +3,392
• Main focus: 101 Workforce
Petrochemical and
Maritime Cluster
Industry and Eastern
RM6,321
Estimated Median Income
Conurbation Centre.
31
KOTASAS ECRL STATION
Station Role : Passenger Station Function / Special Activities : East Conurbation and Pahang Administrative Center Total Project : 22
Station Hierarchy : T1 - Regional Station (TOD) Main Local Authority : Majlis Bandaraya Kuantan Overall Cost : RM3.47 Billion
+16,244
Population
+4,275
House Unit
32
PAYA BESAR ECRL STATION
Station Role : Passenger and Freight Station Function / Special Activities : Edu & Sport City and High-tech Industry Total Project : 24
Station Hierarchy : T3 - Sub Urban Station/Special Activity (TOD) Main Local Authority : Majlis Bandaraya Kuantan Overall Cost : RM2.38 Billion
+6,291
Workforce
3.7% / year
Industry Growth Rate
3.7% / year
Commercial Growth Rate
• Main focus: High-Tech
Industry Cluster,
Education and Sports
RM8 Million
Hub, and Automotive Premium Charge
Industry Logistics
Station RM48 Million
Development Charge
• To optimize the use of
existing industrial To strengthens the
areas at Pahang existing business and
Technology Park, service areas at
Gambang Halal Park, Gambang
Kawasan Perindustrian
Implementation Mechanism:
Kampung Peramu,
Pekan Automotive Park Providing SME ▪ The land in the TOD area is
Forwarding Centers at
and Tanjung Agas
Pahang Technology Park
owned by the State
Maritime Park.
government through the
Pahang State Development
Corporation (PKNP).
The main project proposals for Paya Besar ECRL Station are:
▪ Implementing agencies
• The opening of 489 hectares area for commercial (mixed use development) (commercial 50%
involved:
+ residential 50%) for an eco-concept proposal (plot ratio = 1:4).
• Proposed 49 hectares of residential area (density 45 unit/acre).
✓ MBK ✓ TNB
✓ PBN ✓ ECERDC
• Considering the land use planning of PTK Paya Besar and Kuantan Local District Plan 2035 ✓ JKR ✓ MIDA
(Replacement) for TOD and planning area. ✓ MRL ✓ MOTAC
• Spurline proposal to connect Paya Besar ECRL Station to Tanjung Agas. ✓ JPS ✓ PKNP
• 5 traffic management proposals consist or 2 road upgrading proposal and 3 new road ✓ KKR ✓ Industry
proposal. ✓ BPEN Players
✓ APAD
33
MARAN ECRL STATION
Station Role : Passenger and Freight Station Function / Special Activities : - Total Project : 22
Station Hierarchy : T4 - Urban Neighborhood Station (TAD) Main Local Authority : Majlis Daerah Maran Overall Cost : RM45.95 Million
+4,398
Population
+1,157
House Unit
3.7% / year
Commercial Growth Rate
2
RM4 Million
Premium Charge
RM10 Million
Development Charge
LEGEND:
Proposed Residential
• Main focus: Logistics Hub, Agribusiness Proposed Commercial Implementation Mechanism:
and Eco-Tourism and its station as an Flood Mitigation
To strengthens the Automotive Industry Logistics Station.
Proposed New Road ▪ Encouraging the private sector
existing business and
service areas at Bandar • To optimize the use of existing industrial Proposed Road Upgrading as a developer or as a joint
Maran and Tajau area at Palm Oil Industrial Cluster. Proposed Feeder Bus Route venture company (JV) to
developed the planning area.
The main project proposals for Maran ECRL Station are: ▪ Implementing agencies
involved:
• Strengthening the Pekan Tajau area with an increase of 40 hectares commercial zoning (plot
ratio = 1:3). ✓ MDM ✓ TNB
• Proposed residential zoning covering an area of 634 hectares to encourage the growth of new ✓ PBN ✓ ECERDC
settlement areas near the ECRL station (density = 30 unit/acre). ✓ JKR ✓ MIDA
✓ MRL ✓ MOTAC
• The provision of a heavy vehicle terminal is required in the Palm Oil Industrial Cluster (POIC) ✓ JPS ✓ PKNP
industrial area. ✓ KKR ✓ Industry
• Proposed flood mitigation measure in Sungai Jempul. ✓ BPEN Players
• The 5 traffic management proposals consist of 3 road upgrading proposals and 2 new road ✓ APAD
proposals.
34
TEMERLOH ECRL STATION
Station Role : Passenger and Freight Station Function / Special Activities : Central Point Logistics Hub of Peninsular Malaysia Total Project : 25
Station Hierarchy : T2 - Urban Station (TOD) Main Local Authority : Majlis Perbandaran Temerloh Overall Cost : RM2.24 Billion
au
LEGEND: The size of planning area:
To Kuala Kr
Proposed Residential
10,329.83 hectare
Flood Mitigation
No. of Projects & Implementation Phase
Proposed New Road
Proposed Road Upgrading PHASE
PROPOSALS
Proposed Feeder Bus Route E8
R&R 1 2 3
Temerloh
E8 Land Use & Transportation 2 - 2
Plaza Tol LPT
Temerloh Urban Design &
1 2 -
Connectivity
To Lanchang
Public Transportation &
98 - 5 4
Road
2 Economy 4 5 -
87 TOTAL 7 12 6
OVERALL TOTAL 25
88
Proposed
Project Impact for Temerloh ECRL
87
Terminal Central Station (Year 2040):
or
T. U. Bdr. Sri
+10,050
en
Semantan Temerloh
Ch
T
o
2 Workforce
TB Lurah
Temerloh
1.6% / year
Industry Growth Rate
2
4.7% / year
Commercial Growth Rate
RM20 Million
Premium Charge
• Main focus: High Impact Industry
Clusters (Logistics Hub) or
Resource-Based Industries
RM94 Million
Development Charge
(Timber) as well as Eco-Tourism 10
Clusters (Pahang State Eco
Tourism Gateway).
To strengthens the existing
• To optimize the use of existing business and service areas at
industrial areas at Taman
Providing SME Implementation Mechanism:
Bandar Temerloh, Mentakab, Forwarding Centers at
Perindustrian Temerloh and Lanchang, Kuala Krau and Taman Perindustrian ▪ Development is led by state
ra
Temerloh
government agencies through
To
35
BENTONG ECRL STATION
Station Role : Passenger and Freight Station Function / Special Activities : Tourism Hub and Highland Agriculture Total Project : 25
Station Hierarchy : T3 - Sub Urban Station/Special Activity (TOD) Main Local Authority : Majlis Perbandaran Bentong Overall Cost : RM4.43 Billion
2 3 -
Connectivity
Public Transportation &
1 7 1
Road
Economy 4 5 -
TOTAL 7 17 1
OVERALL TOTAL 25
P75
+8,926
Population
68
8 +2,349
House Unit
4.7% / year
Commercial Growth Rate
RM24 Million
Premium Charge
RM56 Million
• Main focus: Eco-City Tourism (Highland Development Charge
Tourism Cluster) and Agricultural Product
bak
Collection Hub.
Gom
Product Collection Hub. 2B. Bukit Tinggi, Janda Baik and Jambu Rias
Implementation Mechanism:
The main project proposals for Bentong ECRL Station are: ▪ Implementing agencies
• Commercial zoning proposal to support the development of the Bentong Agricultural involved:
Produce Collection Center with an area of 20 hectares (plot ratio = 1:4). ✓ MPB ✓ APAD
• The opening of 1,053 hectares new settlement area near Felda Mempaga to meet the housing ✓ PBN ✓ TNB
demand of the National Conurbation (density = 60 units/acre) ✓ JKR ✓ ECERDC
• The 6 traffic management proposals consist of 3 road upgrading proposals and 3 new road
✓ MRL ✓ MIDA
proposals.
✓ JPS ✓ MOTAC
✓ KKR ✓ PKNP
• Bus parking proposal near ECRL station. ✓ BPEN ✓ Industry
Players
36
ITT GOMBAK ECRL STATION
Station Role : Passenger Station Function / Special Activities : Passenger Gateway to East Coast Region Total Project : 28
Station Hierarchy : T1 - Regional Station (TOD) Main Local Authority : Majlis Perbandaran Selayang Overall Cost : RM7.54 Billion
+12,907
Population
RM9,504
Estimated Median Income
2.3% / year
Commercial Growth Rate
Development Charge
• Main focus: Education City, Main
Gateway between the East Coast Region
and the Klang Valley as well as Eco &
Nature Tourism Cluster.
Implementation Mechanism:
• To strengthens the existing business
and service areas and developed new ▪ 50% government-owned land
area. and 50% individual land in
TOD and planning areas.
The main project proposals for ITT Gombak ECRL Station are: ▪ Implementing agencies
involved:
• 15 hectares of commercial zoning (mixed development) (plot ratio = 1: 4) in the TOD area with
vista and building height control so as not to obstruct the view of the Gombak - Hulu Langat ✓ MPS ✓ APAD
Geopark. ✓ DBKL ✓ TNB
• Retaining plans made based on Selayang Municipal Council Local Plan 2030 (Replacement). ✓ PBN ✓ MIDA
✓ JKR ✓ MOTAC
• The 9 traffic management proposals consist of 7 new road proposals, 1 access road closure ✓ MRL ✓ Invest
proposal and 1 U-turn proposal. ✓ JPS Selangor
• Proposed integration of public transport services in terms of operations ✓ KKR ✓ Pemain
✓ UPEN Industri
37
BANDAR SERENDAH ECRL STATION
Station Role : Passenger and Freight Station Fungsi / Aktiviti Khas : Logistic Hub Total Project : 32
Station Hierarchy : T2 - Urban Station (COD) PBT Utama : Majlis Perbandaran Hulu Selangor Overall Cost : RM719.42 Million
+11,119
Workforce
E1 2.7% / year
Industry Growth Rate
• The 10 traffic management proposals consist of 6 road upgrading proposals and 4 new road *The name of Serendah Baru ECRL Station was
proposals. changed to Bandar Serendah ECRL Station based
on MPHS feedback and used for PeGTaECRL
study only.
38
PUNCAK ALAM ECRL STATION
Station Role : Passenger Station Function / Special Activities : - Total Project : 26
Station Hierarchy : T3 - Sub Urban Station/Special Activity (TOD) Main Local Authority : Majlis Perbandaran Kuala Selangor Overall Cost : RM1.40 Billion
+16,684
Population
+4,278
House Unit
2.4% / year
Commercial Growth Rate
39
KAPAR ECRL STATION
Station Role : Passenger Station (Future) Function / Special Activities : High Value Industrial Area Total Project : 30
Station Hierarchy : T3 - Sub Urban Station/Special Activity (TOD) Main Local Authority : Majlis Perbandaran Klang Overall Cost : RM2.89 Billion
Se
TOTAL 12 17 1
To
OVERALL TOTAL 30
+6,707
Population
Lorong Sungai Puloh
4,883
Additional Workforce
Jalan Sungai Puloh
RM150 Million
• Main focus: Kapar ECRL Premium Charge
Station planning area
boundaries are given the
focus as a High-Tech
RM658 Million
Development Charge
Industry Cluster and
Support Services as well
as Heritage, Historical and
Cultural Tourism Cluster.
0.9% / year
St. LRT3 Commercial Growth Rate
Implementation Mechanism:
To strengthens the
existing business and ▪ 40% government-owned land
service areas and new
area and 60% individual land in the
TOD area.
▪ Implementing agencies
The main project proposals for Jalan Kastam ECRL Station are: involved:
• Proposed commercial (mixed development) in TOD area: ✓ MPK ✓ TNB
o The redevelopment of the Kampung Kereta Api area as a commercial and industrial ✓ PBN ✓ MIDA
mixed development zoning (40 hectares, plot ratio = 1:5). ✓ JKR ✓ MOTAC
o Redevelopment of Kampung Sungai Sireh and part of the KTM housing quarters and ✓ MRL ✓ Invest
Customs as a mixed residential and commercial development zone (57 hectares, plot ✓ JPS Selangor
ratio = 1:6). ✓ KKR ✓ Industry
✓ UPEN Players
• Proposed ECRL and KTMB cargo hub (22 hectares). ✓ APAD
• Proposed spurline to Northport, Westport and proposed Carey Island Port.
41
IMPLEMENTATION AND MONITORING MECHANISM
NUMBER OF
PROJECTS 76 177 160 155
ESTIMATED
COST (2040)
RM5.76 Billion RM6.58 Billion RM13.44 Billion RM18.77 Billion
Additional: RM35 Million Additional: RM46 Million Additional: RM47 Million Additional: RM330 Million
42
IMPLEMENTATION SUMMARY
FEDERAL AND STATE AGENCIES INVOLVED IN IMPLEMENTATION
PeGTaECRL PeGTaECRL
RM44.57
567 PROPOSED PROJECT
Billion
PROJECT COST
STRATEGIC THRUST
1 2 3
STRENGTHENING CONNECTIVITY,
INTEGRATION OF LAND USE PLANNING REGIONAL AND LOCAL ECONOMIC
MOBILITY AND SUPPORTING
AND REGIONAL SERVICES GROWTH DRIVERS
INFRASTRUCTURE
4 Ministries (MOT, NRECC, KKR & KPKT) 4 Ministries MOTAC, MITI, MOT & KKDW) 4 Ministries (MOT, NRECC, KKR & KKD)
KEY ENABLER
9 Federal/State Agencies
43
CONCLUSION
PeGTaECRL is the first regional Meeting of the Development To incorporate and integrate PeGTaECRL,
integrated land use master plan of its
01 Planning Committee (JPP), there is a needs for the following:
kind in Malaysia for inter-regional rail PLANMalaysia and KPKT
service network. In order to ensure that
Presentation and approval of the 19 Amendment and replacement of Local Plan
it can be apply as the main document to 02 State Planning Commitee (JPN)
guide planning and investment along
Presentation and approval of the
3 Special Area Plan proposal
the ECRL route, it needs to be brought
to several levels, namely:
03 National Physical Planning 12 Local authority upgrading proposal
(4 = Municipal - City)
Council (MPFN)
(8 = District - Municipal)
7 Follow-up studies
PAHANG REPLACEMENT:
• Maran 2035
• Temerloh 2035
REPLACEMENT (KL):
• PSKL2040
• PTKL 2040
Note: Status of RT, RKK, PBT and Follow-up Study are as of September 2023
44
WAY FORWARD
• ECRL has shortened travel
time and improving the level of
connectivity between the East Kota Bharu
Coast Region and the National Spurline 1 (P. Puteh - Tok Bali)
Conurbation.
Pasir Puteh
P. B
Bandar Serendah Maran
esar – Pekan – M
Temerloh
NEW SPURLINE
Puncak Alam
ITT Gombak
SPURLINE 1 (ECERDC): Kapar
Pasir Puteh ECRL Station - Pelabuhan Tok Bali
ECRL
16 km Jalan Kastam
2
SPURLINE 2 (Kerajaan Negeri Terengganu):
ersin
Kuala Terengganu ECRL Station - Bukit Besar Spurline 3
14 km (Westport (Port Klang)) –
g–
SPURLINE 3 (MOT): Pulau Carey Port)
P. G
Pelabuhan Klang (Westport) - Pulau Carey
12 km ud
an
g)
45
In addition to the success of the ECRL project, it is hoped that this PeGTaECRL can be used as a reference in
driving sustainable development towards an impartiality between the East Coast Region and the West
Coast Region of the country. Therefore, the commitment, responsibility, accountability and ability of the
various agencies involved are able to determine the successful implementation of this masterplan.
AWARD
PeGTaECRL has received the international ISOCARP Award For Excellence in October 2022 in Brussel, Belgium.
This prestigious award received 30 participation entries from various countries and PeGTaECRL successfully
received the Merit Award. This award is based on the excellence of projects related to urban planning and is
evaluated in terms of planning and implementation in the context of strategic plans, policies and programs.
6 OCTOBER 2022
For further