soak pit

1:4:8 Mass concrete


SECTION OF SEPTIC TANK SITE PERFORMA
SCALE: N.T.S

SAND AREA STATEMENT -


50MM DIA.VENT PIPE
R.C.C. SLAB
TOTAL PLOT AREA :- 216.00 SQ.M
GROUND FLOOR BUILTUP AREA :- 121.50 SQ.M
BRICK
FIRST FLOOR BUILTUP AREA :- 108.05 SQ.M
1.00
I.C SOAK PIT SECOND FLOOR BUILTUP AREA :- 82.75 SQ.M

UNDER from i.c. PLOT COVERAGE IN % :- 56.25%


GROUND G.L G.L soak pit
1:4:8 Mass concrete
WATER TANK DETAIL PLAN OF SEPTIC TANK SETBACK PARKING GREEN SPACE
SCALE: N.T.S SECTION OF SEPTIC TANK FRONT SIDE REAR SIDE PARKING IS THE GREEN SPACES ARE
SCALE: N.T.S
RAIN WATER HARVERSTING PIT 3.00M 1.50M PROVIDED WITH MUST REQUIRED INSIDE
SECTION OF COMPOUND COMFORTABLE
CIRCULATION SPACE
SITE ,SO AS PER
REQUIRED GREENERY
SCALE: N.T.S LEFT SIDE RIGHT SIDE
WALL 1.50M 1.50M
FOR 1 CAR AND 2
TWO WHEELER.
SPACES ARE DESIGNED IN
FORM OF LANDSCAPE.
SCALE: N.T.S
SCHEDULE OPENING :-
S.NO SYB DESCRIPTION SIZE

0.15
2.76
TOP ROOF [STAIRCAP] LVL TOP ROOF [STAIRCAP] LVL TOP ROOF [STAIRCAP] LVL
+12.30M TOP ROOF [STAIRCAP] LVL
+12.30M
0.15
1 D T.W FRAME DOOR 1.07X2.13
+12.30M
4.5
4.04

0.05

0.05
1
0.23 2.93
0.23
2 D1 T.W FRAME DOOR 0.91X2.13

2.2

2.25
3.39
PARAPET WALL PARAPET WALL
3.61 4.66 PARAPET WALL
0.89
FLOOR FINISH LEVEL
4.57 1.5 2.94
3 D2 T.W FRAME DOOR 0.76X2.13

1.15

1.15
FLOOR FINISH LEVEL

1.2
+10.05M 2
+10.05M

3.75
PITCHED ROOF FOR BALCONY R.C.C SLAB LVL
DETAIL @ 2 +9.90M
R.C.C SLAB LVL
+9.90M 4 W M.S WINDOW 1.22X1.22

0.3

0.3
3 R.C.C SLAB LVL
R.C.C SLAB BEAM LVL

1.8
3.47 R.C.C SLAB BEAM LVL 2.0 +9.90M
2.9 5
+9.75M
W1 M.S WINDOW 1.45X1.45

0.15 0.6
+9.75M

R.C.C CHAJJA LVL


4.3

R.C.C CHAJJA LVL


+9.00M
+9.00M
W2 M.S WINDOW 1.50X1.45

2.25
1.27
1.25

1.2

2.85
HORIZONTAL GROOVE LINES

3
B.B.M. WALL

3
0.35 IRON HAND RAIL
W3 M.S WINDOW 1.60X1.45

1.5
0.1
0.15

DETAIL @ 3
2.19

2.1
FLOOR FINISH LVL FLOOR FINISH LEVEL
5 W5 GOGGLED GLASS 1.45M WIDE

0.9
+6.90M
0.8

0.65

+6.90M

0.6
4.77 R.C.C SLAB LVL 1.92

0.1
+6.75M
R.C.C SLAB LVL
4.39

3
0.3

0.3

0.3
+6.75M
1.16 R.C.C SLAB BEAM LVL
0.3 R.C.C SLAB LVL
6 V VENTILATOR 0.60X0.60

1.8
0.23 3.39 0.23 +6.75M
2 +6.60M
R.C.C SLAB BEAM LVL

12.45
0.15 0.6

+6.60M
0.15

12.45

12.45
1.8 4.21
R.C.C CHAJJA LVL
7 MD T.W FRAME DOOR 1.30X2.13

0.15
3.05

10.95
1.31 +5.85M
2

1
M.S HAND RAILING

2.85
3

DETAIL @ 4
CONCRETE ROUGH SURFACE

1.72

2.55
B.B.M. WALL

4
2.1

4.49
STABILITY CERTIFICATE -

2.1
0.15
1

0.23
0.7

R.C.C SLAB LVL


1.92 +3.60M
0.15

7.2
THIS IS TO CERTIFY THAT THE FOUNDATION WILL

3
0.3

0.3

0.3
4.39 0.92 R.C.C SLAB BEAM LVL R.C.C SLAB LVL
+3.45M
R.C.C SLAB BEAM LVL

1.8
+3.60M
0.15

0.15

+3.45M

BE DESIGN TO TAKE THE LOAD OF STRUCTURE

0.6
1.37
0.7

4.12 4.89

0.15
LINTEL LEVEL

0.15
0.15

LINTEL LEVEL 2.5

0.15
VERTICAL WOODEN +2.70M LINTEL LEVEL
+2.70M

SAFELY, AS PER PROPOSED DESIGN


1.99

STRIPS JALI WALL +2.70M

0.7

0.3 0.2
DETAIL @1
2.7
1.2

2.85

2.85
3

SILL LEVEL

3
2.1 +1.90M
CONSTRUCTION WORK IS DONE UNDER
2.25

0.3

2.13
2.1
0.1
HORIZONTAL GROVE LINES
0.1

3.1
FLOOR FINISH LVL FLOOR FINISH LEVEL
TECHNICAL SUPERVISION AS PER STRUCTURAL

1.35
+0.60M
+0.60M
2.19 PLANTER BOX
0.8

4.7
1.9
1.12 DETAIL @ 5

1.2
P.C.C BED LVL
DESIGN IN M15 CONCRETE.
0.3
0.15

0.15

2.77 +0.68M
0.3 PLINTH LEVEL
0.15

0.15
2.28 +0.60M
0.45

0.6

0.6
MURUM FILLING
GL MURUM FILLING

0.6
GL

0.3
BRICK EXPOSED PLINTH WALL
0.35

R.C.C FOOTING LVL R.C.C FOOTING LVL


LEGEND SITE INDICATIONS -
CEILING FAN POINT
R.C.C FOOTING BED LVL R.C.C FOOTING BED LVL
-1.50M
R.C.C FOOTING BED LVL
-1.50M ELEVATION EXHAUST-FAN.
CEILING POINT
1.PLOT BOUNDRAY SHOWN IN
WALL POINT 2.PROPOSED BUILDING SHOWN IN
F.L. FLOOR LAMP
3.DRAINGE LINE SHOWN IN
SECTIONAL ELEVATION AT B - B' SECTIONAL ELEVATION AT A - A' S.B. (SWITCH BOARD)
HOME-THEATER / SPEAKERS 4.WATER TANK SHOWN BY
BELL POINT.
B' B' B' B' INVERTER. NOTE:-
12 WAY SPN.MCB.

9 POWER PLUG
ALL DIMENSION ARE IN METER
PLANTATION
1.27

1.27

UTILITY / BACKYARD RAIN WATER


1.01 2 1.11 0.45 0.81 1 1.29 0.65 0.69 0.45 1.75 1.92 0.45 0.26 1.6 2.13 0.45 0.45 1.75 1.92 0.45 3.99 0.45 PIPE
0.23

0.23
0.45 0.55 3.12 0.45 0.26 1.6 1.23 0.65 0.24 0.45
0.13

1.27 1.27
W3 V
V W2 W7
CLIENT:-
0.23

0.23

0.23

0.23

0.23
0.36

0.36

0.78 2 1.11 0.45 0.81 D 1.11 0.65 0.46 0.69 0.65 0.24 0.7 1.5
1.69 0.45 3.99
2.89 0.45 0.26 1.6 0.43 1.69 2.13 0.22
PROPOSED G+2 FLOOR RESIDENTIAL BUILDING CONSTRUCTION
0.6

0.22 0.22
1.00M WIDE BALCONY

6.34
TOILET
0.13

0.13
TOILET 5.63
6.34
1.7 2.23 X 2.19M 1.80 X 2.00M FOR ...............
1.5

1.5

1.5

1.5

1.5
W4 W7

2.12
6.2
2.19
KITCHEN PLATFORM

W2
2.47

BALCONY

2
1.8

SLOPE
3.62
D1 2.20 X 3.62M
3.39
3.85

3.39

3.39
3.85

3.39

3.39

3.39
3.85

3.39

3.39

3.39

3.39
KITCHEN + DINNING M.BEDROOM 0.05
SLOPING PROVIDED TO
3.5

D1 0.85 0.9 GYM


5.63 X 3.50M DRAIN OUT RAIN WATER
0.85

0.85

0.85
6.20 X 3.50M
2.9

3.62
0.85 1.32
1 0.9 6.34 X 3.39M
0.85 1.32 2.2
1.75

3.5
1.87

0.05
1.39

1.27
4.96
1.09
0.89

12.00

0.9
0.9

0.12
0.12

0.23

0.12

0.12

0.23

0.12
0.45 O 0.22 0.23 2.6 0.07 3.04
0.23 0.84 D 0.45 0.33 0.4 D1 0.45 0.62
D 2.71 D 0.45 1.12 1.88 1.2 0.22 2.82 0.22
0.6 3.07 2.67 1.47
0.23

0.23

0.23

0.23

0.23

0.23

0.23

0.23
O1.5 O 1.50
0.25

0.25

0.25

0.25

0.25
7 6 5 4 3 2 1 1 7 6 5 4 3 2 1 1 7 6 5 4 3 2 1 0.39 7 6 5 4 3 2 1

0.77
10 9 8 0.45 10 9 8 10 9 8 0.42 W2 10 9 8
2.59 0.45
0.48

2.93 9.00
2.47 0.45

0.77
UP 0.17 UP 0.77
0.89

0.89

0.89

0.89
UP 3.7 1.27 1.2 0.45 3.04
3.7 UP
A A' A 0.79
A' A 1.92
A' A A'
0.25

2.92 3.7
0.3 0.3 1.92 0.3 2.92
2
1.35

1.35

1.35

1.35

1.35

1.35
W5
2

2
W5

2.46
0.23

0.23

0.23
W5 0.6
11 11 11

0.07
12 13 14 15 16 17 18 19 20 12 13 14 15 16 17 18 19 20 12 13 14 15 16 17 18 19 20

0.34
1.51M WIDE PASSAGE
1.56M WIDE PASSAGE

DOWN
0.89

0.18

0.18
0.07

1.51M WIDE PASSAGE


1 1 RAIN WATER
1
0.4

0.4
0.45

0.31 0.45

0.31 0.45

0.45
4.12 PIPE
4.43

4.12 4.12

0.07
0.18

SLOPE
4.43

4.43

W6
1.27

0.31

D2 2.2 1.69 1.69

4.66

4.66
OPEN TO SKY

3
3.94

TOILET
0.75

4 4.73
D COURTYARD TOILET D D
0.65

0.65

0.65
STAIRCASE
1

1
V 2.20 X 1.80M 4.96

4.66
V

13.5
2.93 X 4.43M 2.20 X 1.80M

1.8
1.92

1.92
10.69
2.2
1.8

1.56 1.51
0.84

0.84
1.51 2.92 RAIN WATER
1.5

1.5

W2 D1 2.92
D1 13.50 13.50
1.24

1.24

1.24

1.24

1.24

1.24
1.28 1.28 3.04 PIPE
1.67

1.67
1.5
2.3

0.66

0.66
1.97 0.72 0.23 2.81 0.23 18.00
0.3 1.51

0.89
BEDROOM 0.07 0.85 1.4 0.85 1.4 0.23

4.28
2.69 0.23 1.27

4.17
0.23 0.1
0.72

0.72
4.5

0.07 1
4.00 X 4.50M
0.3

1.39
0.45

0.45

0.45

0.45

0.45

0.45

0.45

0.45

0.45
0.23
0.22

0.22
1.39 2.2 0.72 0.18 0.44
2.93 1.5 2.81
D

5.8
1.63

0.22
0.23
0.83

0.83
2.03

1.33

1.5

1.5

1.5

1.5
W2 W2
2.48

M.BEDROOM SLOPING PROVIDED TO


1.74

VERTICAL WOODEN
STRIPS JALI WALL 4.12

2.17
DETAIL @1
4.00 X 5.40M FAMILY ROOM M.BEDROOM DRAIN OUT RAIN WATER

4
0.53
1.27 4.43 X 3.39M 4.00 X 4.00M
0.15

0.15

0.15
3.39

3.16

3.16
3.17

2.81
3.24

4.77
0.22

1.5 1.97

3.39
UNDERGROUND
0.45

0.45

0.45

0.45

0.45

0.45
1.8

1.8

W8 4.31 W8
LIVING ROOM WATER
5.4

0.15
0.89 TANK

3.61
1 2 3

4.33
4.77

4.33

4.33

4.33

5.23
W2 UP 4.43 X 4.70M 4
4.7

4.55

4.55
0.76 1.5 1.86
W SLOPING PROVIDED TO
2.5

2.5

4.43

0.74
4.89
1.19

1.19
1.27

DRAIN OUT RAIN WATER


1.42

1.42
3.54 TERRACE
0.53

4
0.71 3 0.71 0.53 1.5 0.91 D
0.76

3.00
4.31 X 4.77M 4.31
2.58
2.81

2.81

0.29
0.76 W2 1.5

1.43
0.6 3 0.94 0.91 1
PORCH WITH 4 4.54
PLANTATION

0.94

0.94

BALCONY
1.25

0.22
MD
0.87

1.17

1.17
1.50 9.00 1.50
1.16

1
4.43
1.31

SLOPE4.46
PARKING SLOPE
1.39

1.39

1.4

1.4
BALCONY 4.23 X 1.4M 2.71 1.75 0.22
1.1

1.71 2 0.72 0.53 1.5 1.97 0.22 4.09

0.22
0.23 4.46 4.21
4.54 X 1.39M
0.45

0.45

0.45

0.45
5.18

0.4
0.29
6

0.23
9.00M WIDE ROAD
0.87 2.1 0.66 1.45
W1 W2 0.23
PLANTATION

4.23 0.45 4.09 0.23


1.46 1.94 2 0.95 1.27 0.76 1.5 1.97 0.45 4.09 0.23 4.23 0.45 4.09

9
SITE PLAN
2.37

2.77

ARCHITECT:-
0.4

PLANTATION
2.2

B B B B
MAIN ENTRANCE

SECOND FLOOR PLAN TERRACE FLOOR PLAN


GROUND FLOOR PLAN FIRST FLOOR PLAN
N
SHEET NO NAME : SUJAY J KHADE SIGN

CORPORATION DRAWINGS USN : 2GI21AT055

SUB : WORKING DRAWING