Sr. Scope
Description Remarks
No. Vendor GNFC
1.00 Engineering
1.01 Basic engineering inputs x
1.02 Process licensing from technology supplier x
1.03 Design and engineering of storage tankwith x
RCC foundation
1.04 Design of insulation and insulation thickness x
calculation
1.05 Boil-off calculation for the tank x
1.06 Instrumentation work as under: x
a. Instrument Index
b. Instrument and JB location Plan
c. Cable Tray Layout
d. Inst Hook Up Diagram
e. GAD of JB, GWR, Temperature
element of Tank.
f. Installation diagram for JB, GWR,
Temperature element of Tank.
g. DCS I/O List
h. Logic diagram
i. Alarm and Trip List
1.07 Electrical works x
1.08 Interconnecting Piping Works up to Battery x
Limit
1.09 Piping for utility (required if any) within 50 M x
distance from the site
1.10 All Civil works x
1.11 Preparation of all the requisite drawings/ x
documents etcw.r.t. tank GA and fabrication
drawing with bill of material and weight
calculations of each parts, piping layout with
isometric and bill of material, insulation
drawings / documents, instrument hook-up
drawings with bill of material, electrical
earthing, etc.
2.00 Procurement x
2.01 Mechanical x
a) Plates x
b) Structural materials x
c) Pipe, flanges, fittings, valves supports up to x
tank nozzle flanges
d) External piping materials with valve x
&supports from tank body flanges up to
03_Scope_Matrix-Annexure-3 Page 1 of 7
ANNEXURE - 3
2.02 Civil
a) All Civil construction materials like Cement, x
Reinforcement steel, Structural steel ,
Coarse aggregate (Kapachi), fine aggregate
(Sand), Bricks etc.
b) Construction of temporary safety barricade x
of structure & asbestos/GI sheets inside
dyke wall (to isolate existing single wall
tank). Height and Length of the barricade
shall be as per Annexure-D.
c) Internal drains and pavements x
d) Temporary civil works like dismantling of x
Dyke wall, storm water drains etc. and
reconstructing the same as per original
specification by LSTK contractor after work
completion. Contractor will design and
construct temporary culvert for movement of
crane, forklift etc. required for dismantling
03_Scope_Matrix-Annexure-3 Page 2 of 7
ANNEXURE - 3
03_Scope_Matrix-Annexure-3 Page 3 of 7
ANNEXURE - 3
3.00 Construction
03_Scope_Matrix-Annexure-3 Page 4 of 7
ANNEXURE - 3
03_Scope_Matrix-Annexure-3 Page 5 of 7
ANNEXURE - 3
03_Scope_Matrix-Annexure-3 Page 6 of 7
ANNEXURE - 3
03_Scope_Matrix-Annexure-3 Page 7 of 7