BW Requirement For 4G - Shimoga OA
BW Requirement For 4G - Shimoga OA
To
DGM (A &P)
With respect to the above cited subject, Bandwidth requirement is calculated for sites
category wise for Installation and commissioning of M/s. TCS 4G equipments in 439 sites in Shimoga
OA which is comprising of existing, new and Saturation project sites.
BTS count SDCA wise covering 4GS , Existing and New sites under Phase IX.2
SHIMOGA BHADRAVATHI 3 23 26
SHIMOGA HOSANAGARA 35 26 61
SHIMOGA SHIKARIPURA 8 12 20
SHIMOGA SHIMOGA 11 53 5 69
SHIMOGA SORABA 6 23 29
SHIMOGA THIRTHAHALLI 39 37 76
DAVANGERE CHANNAGIRI 6 15 21
DAVANAGERE HONNALI 1 23 24
Bandwidth projection is based on the media plan for category of eNODE B which are to be
deployed.