FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. 1
PROJECT/JOB NAME Fire pump foundation
CLIENT NAME laos
SITE NAME laos
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME Firwall Foundation
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


2/20/2024

Project Na. : Fire pump foundation


Calculation Sheet
of Project No. : 1

Foundation Client : laos Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
FIREWALL 1 F1

Copyright (c) GS E&C. All Rights Reserved


2/20/2024

Project Na. : Fire pump foundation


Calculation Sheet
of Project No. : 1

Foundation Client : laos Page 2

CONTENTS

1. FOUNDATION DATA
1.1 FOOTING AND SECTION DATA
1.2 LOAD CASE
1.3 LOAD COMBINATION

2. CHECK OF STABILITY
2.1 CHECK OF SLIDING
2.2 CHECK OF OVERTURNING MOMENT
2.3 CHECK OF CONTACT PRESSURE

Copyright (c) GS E&C. All Rights Reserved


2/20/2024

Project Na. : Fire pump foundation


Calculation Sheet
of Project No. : 1

Foundation Client : laos Page 3

1. FOUNDATION DATA
1.1 FOOTING AND SECTION DATA
( mm ) Ft. Name F1
Ft. Type ISO
Area 35.700 m2
Ft. Thickness 600.00 mm
Ft. Volume 21.420 m3
Ft. Weight 524.790 kN

11900 Soil Height 500.00 mm


Soil Volume 17.455 m3

11300 350 Soil Weight 314.190 kN


3000

Buoyancy Not Consider


Self Weight (except Pr.SW) 838.980 kN

500
100
600

The Origin coordinate


The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F1 All Direct 21.420 m 17.455 m 9.690 kN

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 35.700 m2 524.790 kN 314.190 kN 848.670 kN

1.2 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
My based on the right hand rule.
Fx
Mx

Index Load Case Name Load Case Description


1 SW SELF WEIGHT
2 DL DEAD LOAD

Unit( kN , kN-m )
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0 0 -9.69 0 0
F1 1
2 0 0 -1895.2 1414.65 0

Copyright (c) GS E&C. All Rights Reserved


2/20/2024

Project Na. : Fire pump foundation


Calculation Sheet
of Project No. : 1

Foundation Client : laos Page 4

Footing SW 0.000 0.000 -838.980 0.000 0.000

1.3 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

1.3.1 Load Combination in Pier Top (Without SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb.  Fx  Fy  Fz  Mx My
F1 1 1 0.000 0.000 -1895.200 1414.650 0.000

1.3.2 Load Combination in Footing Bottom (With Pier SW)


Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb.  Fx  Fy  Fz  Mx My
F1 1 1 0.000 0.000 -1895.200 1414.650 0.000

1.3.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name L.Comb.  Fx  Fy  Fz  Mx  My C.G. of Loads
F1 1 0.000 0.000 -1895.200 1414.650 0.000 5950.0 , 1500.0

Load Combination of Ultimate Condition


There is no Load Combination

Copyright (c) GS E&C. All Rights Reserved


2/20/2024

Project Na. : Fire pump foundation


Calculation Sheet
of Project No. : 1

Foundation Client : laos Page 5

2. CHECK OF STABILITY
2.1 CHECK OF SLIDING
Fz + P.F Fz + P.F
Formula : ( or ) > Fs -> OK (Uni-Axial)
Fx Fy
P.F = Passive Force (apply only in case checked passive force, mark by P ) Unit ( kN )
Ft.Name Dir. L.Comb. (  Fz + P.F) /  Fx or (  Fz + H.P.F) /  Fy Fs(i) Result
X 1 Fx = 0 , Then N/A 1.5 OK
F1
Y 1 Fy = 0 , Then N/A 1.5 OK

2.2 CHECK OF OVERTURNING MOMENT


Formula : (Mry / Moy or Mrx / Mox) > OVM(i) -> OK Unit ( kN-m )
Ft.Name Dir. L.Comb.  Mry /  Moy = OVM or Mrx /  Mox = OVM OVM(i) Result
X 1 Mo = 0 , Then N/A 1.5 OK
F1
Y 1 -2842.8 / -1414.65 = 2.01 1.5 OK

2.3 CHECK OF CONTACT PRESSURE


2.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

Fz My X(i) Mx Y(i)


q1,q2 =
Af Iy Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula
L
q(x) width(x) X dx
Px = 0 L
0
q(x) width(x) dx
P = L0 q(x) width(x) dx

2.3.2 Input Data


2 4 4
Ft.Name Af (m ) Fl (m ) Fw (m ) Ix (m ) Iy (m )
F1 35.700 11.900 3.000 26.7750 421.2898

Copyright (c) GS E&C. All Rights Reserved


2/20/2024

Project Na. : Fire pump foundation


Calculation Sheet
of Project No. : 1

Foundation Client : laos Page 6

2.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
- XY-Direction (Bi-Axial) Unit( kN , kN-m , kN/m2 )
Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result
F1 1 0.000 140.915 0.740 3.000 140.9 464.0(net) 75.35 / 80 % NG(Area)