Version 7.4.

PVsyst TRIAL
PVsyst - Simulation report
Grid-Connected System

Project: Installation photovoltaïque 2.0KWc


Variant: New simulation variant in 21/2/2024
No 3D scene defined, no shadings
System power: 2000 Wp

PVsyst TRIAL
El Khezama el Gharbia - Tunisia

PVsyst TRIAL

PVsyst TRIAL
Author

PVsyst TRIAL
Project: Installation photovoltaïque 2.0KWc
Variant: New simulation variant in 21/2/2024

PVsyst V7.4.5
VC0, Simulation date:
02/21/24 11:51

PVsyst TRIAL
with v7.4.5

Project summary
Geographical Site Situation Project settings
El Khezama el Gharbia Latitude 35.84 °N Albedo 0.20
Tunisia Longitude 10.60 °E
Altitude 34 m
Time zone UTC+1

Meteo data
El Khezama el Gharbia
Meteonorm 8.1 (1991-2000), Sat=100% - Synthetic

System summary

PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Unlimited load (grid)
Tilt/Azimuth 30 / 0 °

System information
PV Array Inverters
Nb. of modules 5 units Nb. of units 1 unit
Pnom total 2000 Wp Pnom total 2000 W
Pnom ratio 1.000

Results summary
Produced Energy 3220.05 kWh/year Specific production 1610 kWh/kWp/year Perf. Ratio PR 86.65 %

PVsyst TRIAL
Project and results summary

Main results
Loss diagram
Predef. graphs
Table of contents

General parameters, PV Array Characteristics, System losses


2
3
4
5
6
Single-line diagram 7

PVsyst TRIAL

PVsyst TRIAL
02/21/24 PVsyst Evaluation mode Page 2/7
Project: Installation photovoltaïque 2.0KWc
Variant: New simulation variant in 21/2/2024

PVsyst V7.4.5
VC0, Simulation date:
02/21/24 11:51

PVsyst TRIAL
with v7.4.5

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 30 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Unlimited load (grid)

PVsyst TRIAL
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model ALPHANIS Model Galvo 2.0-1 / 220
(Custom parameters definition) (Original PVsyst database)
Unit Nom. Power 400 Wp Unit Nom. Power 2.00 kWac
Number of PV modules 5 units Number of inverters 1 unit
Nominal (STC) 2000 Wp Total power 2.0 kWac
Modules 1 strings x 5 In series Operating voltage 120-335 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.00
Pmpp 2051 Wp
U mpp 145 V
I mpp 14 A

PVsyst TRIAL
Total PV power Total inverter power
Nominal (STC) 2.00 kWp Total power 2 kWac
Total 5 modules Number of inverters 1 unit
Module area 2.1 m² Pnom ratio 1.00

Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 169 mΩ Loss Fraction 1.5 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses IAM loss factor


Loss Fraction 2.0 % at MPP ASHRAE Param.: IAM = 1 - bo (1/cosi -1)
bo Param. 0.05

PVsyst TRIAL

PVsyst TRIAL
02/21/24 PVsyst Evaluation mode Page 3/7
Project: Installation photovoltaïque 2.0KWc
Variant: New simulation variant in 21/2/2024

PVsyst V7.4.5
VC0, Simulation date:
02/21/24 11:51

PVsyst TRIAL
with v7.4.5

Main results
System Production
Produced Energy 3220.05 kWh/year Specific production 1610 kWh/kWp/year
Perf. Ratio PR 86.65 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² kWh kWh ratio
January 71.4 29.67 10.84 108.9 106.4 199.8 186.5 0.856

PVsyst TRIAL
February 85.9 41.58 11.61 114.4 111.8 210.4 196.5 0.859
March 128.9 70.22 15.18 151.1 147.4 278.5 260.6 0.863
April 159.7 78.35 18.04 169.6 165.3 313.2 292.9 0.864
May 191.3 88.45 21.76 185.2 180.1 342.5 320.2 0.864
June 197.5 91.52 25.56 184.5 179.2 342.1 319.7 0.867
July 207.9 91.20 29.23 197.5 192.0 368.2 344.6 0.872
August 194.1 82.30 29.12 199.5 194.4 372.8 349.1 0.875
September 152.1 62.27 25.38 174.8 170.8 326.0 305.1 0.873
October 117.4 56.99 22.28 150.4 147.1 280.1 262.4 0.872
November 81.7 38.22 16.84 120.0 117.1 221.5 207.0 0.863
December 66.9 32.72 12.52 102.3 99.9 188.0 175.4 0.857
Year 1655.0 763.50 19.91 1858.1 1811.6 3443.1 3220.1 0.866

PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

PVsyst TRIAL
02/21/24 PVsyst Evaluation mode Page 4/7
Project: Installation photovoltaïque 2.0KWc
Variant: New simulation variant in 21/2/2024

PVsyst V7.4.5
VC0, Simulation date:
02/21/24 11:51

PVsyst TRIAL
with v7.4.5

Loss diagram
1655 kWh/m² Global horizontal irradiation
+12.3% Global incident in coll. plane

-2.51% IAM factor on global

1812 kWh/m² * 2 m² coll. Effective irradiation on collectors

efficiency at STC = 93.77% PV conversion

3624 kWh Array nominal energy (at STC effic.)

PVsyst TRIAL
-0.62% PV loss due to irradiance level
-0.02% PV loss due to temperature
-1.50% Module quality loss

-2.00% Module array mismatch loss

-0.94% Ohmic wiring loss


3443 kWh Array virtual energy at MPP

-6.43% Inverter Loss during operation (efficiency)

0.00% Inverter Loss over nominal inv. power


0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
-0.05% Inverter Loss due to power threshold

PVsyst TRIAL
0.00% Inverter Loss due to voltage threshold
3220 kWh Available Energy at Inverter Output
3220 kWh Energy injected into grid

PVsyst TRIAL

PVsyst TRIAL
02/21/24 PVsyst Evaluation mode Page 5/7
Project: Installation photovoltaïque 2.0KWc
Variant: New simulation variant in 21/2/2024

PVsyst V7.4.5
VC0, Simulation date:
02/21/24 11:51

PVsyst TRIAL
with v7.4.5

Predef. graphs
Daily Input/Output diagram

PVsyst TRIAL

PVsyst TRIAL System Output Power Distribution

PVsyst TRIAL

PVsyst TRIAL
02/21/24 PVsyst Evaluation mode Page 6/7
PVsyst V7.4.5
VC0, Simulation date:
02/21/24 11:51

PVsyst TRIAL
with v7.4.5

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL

You might also like