5226
5226
RCD 1 CEP
Name:
Irfan Ullah
Registration no:
19pwciv5226
Class no:
141
Section:
P
Subject:
RCD 1
Submitted to:
Engr. Fayaz sir
Problem Statement
The Civil Engineering Department has decided to construct a single-story Conference Hall to facilitate
various academic and professional events. The Architect, after thorough consideration of the
requirements, aesthetics, and spatial configuration, has prepared the architectural design. The floor
plan, which illustrates the layout of the hall, is provided in Figure 1. The sizes of structural members have
been already fixed by the architect which have been shown in provided figure.
DL = 0.0542 k/ft2
LL = 0.1 k/ft2
bf = 33”
Mu = 1914.76 k-in
2.614𝑀𝑢
a = d - √𝑑 2 −
𝑓′𝑐 𝑏𝑓
Taking d = 21.5”
2.614 𝑥 1914.76
a = 21.5 - √21.52 −
3 𝑥 33
a = 1.21” < hf
1914.76
As = 1.21
0.9 𝑥 60(21.5− )
2
As = 1.7 in2
As,
Therefore,
Using #6 bars,
N = 1.7/0.44 4 bars
Actual d = h - dc
d = 21.75”
𝐴𝑠 𝑓𝑦
𝑎=
0.85𝑓𝑐 ′𝑏𝑤
4 𝑥 0.44 𝑥 60
𝑎=
0.85 𝑥 3 𝑥 15
𝑎 = 2.76 𝑖𝑛
𝑎
∅𝑀𝑛 = ∅𝐴𝑠 𝑓𝑦 (𝑑 − )
2
2.76
∅𝑀𝑛 = 0.9 𝑥 4 𝑥 0.44 𝑥 60 (21.75 − )
2
∅𝑀𝑛 = 1935.96 k-in > Mu → Design is OK!
Vc = ∅2√𝑓𝑐 ′ bd
Axial load on C1, P = load from slab (LL + DL) + self weight of beam (DL)
P = 30.5 kips
Pn = 1.6(12.3) + 1.2(18.19)
Pn = 41.51 kips
Pn = Pu = ∅[0.85𝑓𝑐′ (𝐴𝑔 − 𝐴𝑠 ) + 𝐴𝑠 𝑓𝑦 ]
i.e. 0.01Ag
Using #5 bars,
N = 2.25/0.31 8 bars
Ps = LL + DL = 12.3 + 18.19
Ps = 30.5 kips
Pu = 41.51 kips
Assuming h to be 15”
davg = 15 – (3 + 4/16)
davg = 11.75”
qe = qa – [𝑐 h – (z − h)𝑠𝑜𝑖𝑙 ]
qe = 1.742 k/ft2
Breq = 4.18 ft
So Aprovided = 25 ft2
Punching shear
Shear check
Bending moment
𝑞𝑢 𝐵𝐾 2
Mu = x 12
2
𝐵−𝑐 5 − 1.25
K= =
2 2
K = 1.875 ft
1.66 𝑥 5 𝑥 1.8752
Mu = x 12
2
Mu = 175.08 k-in
2.614 𝑥 175.08
a = 11.75 - √11.752 − 3 𝑥 5 𝑥 12
a = 0.11 in
175.08
As = 0.11
0.9 𝑥 60(11− )
2
As = 0.28 in2
Since,
Using #4 bars,
N = 1.62/0.2 9 bars
Smax = 18”
Using #6 bars
d = h – (3 + 6/16) = 11.625”
qe = qa – [𝑐 h – (z − h)𝑠𝑜𝑖𝑙 ]
qe = 1.742 k/ft2
8.55
Areq =
1.742
Areq = 4.91 ft2
Breq = 4.91 ft
𝑉𝑢 = 𝑞𝑢 𝑏(𝑘 − 𝑑)
𝑉𝑢 = 0.49 𝑥 1(2.125 − 11.625/12)
𝑉𝑢 = 0.57 𝑘𝑖𝑝𝑠
𝑞𝑢 𝑏𝐾 2
Mu = x 12
2
0.43 𝑥 1 𝑥 2.1252
Mu = x 12
2
Mu = 13.28 𝑘 − 𝑖𝑛
∅𝑉𝑐 = 2∅√𝑓𝑐 ′ 𝑏𝑑
2.614 𝑥 13.28
a = 11.75 - √11.752 − 3 𝑥 12
a = 0.04”
13.28
As = 0.04
0.9 𝑥 60(11.75 − )
2
As = 0.021 in2
Asmin is OK!
Using #6 bars
s = 12 x 0.44/0.324 = 16.3”
smax = 18”
Shrinkage reinforcement
Ast = 0.0018 x 5 x 12 x 15
Using #6 bars
N = 1.62/0.44 4 bars