FusionDC1000A40 Prefabricated All-in-One Data

Center

Quick Guide (2021, Zambia, ZESCO)

Issue 01
Date 2021-06-18

HUAWEI TECHNOLOGIES CO., LTD.


Copyright © Huawei Technologies Co., Ltd. 2021. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website: https://e.huawei.com

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. i


FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) About This Document

About This Document

Purpose
This document describes the initial configuration parameters of the data center as
well as the precautions, processes, parameters, and drawings for installing the
data center. It helps customers quickly get familiar with product configurations,
and provides installation guidance and technical support for onsite installation
personnel and technical support engineers.

Intended Audience
This document is intended for:
● Maintenance engineers
● Technical support engineers
● System engineers
● Commissioning engineers
● Data configuration engineers

Symbol Conventions
The symbols that may be found in this document are defined as follows.

Symbol Item

Indicates a hazard with a high level of risk which, if not


avoided, will result in death or serious injury.

Indicates a hazard with a medium level of risk which, if


not avoided, could result in death or serious injury.

Indicates a hazard with a low level of risk which, if not


avoided, could result in minor or moderate injury.

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. ii


FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) About This Document

Symbol Item

Indicates a potentially hazardous situation which, if not


avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to
personal injury.

Supplements the important information in the main


text.
NOTE is used to address information not related to
personal injury, equipment damage, and environment
deterioration.

Change History
Changes between document issues are cumulative. The latest document issue
contains all updates made in previous issues.

Issue 01 (2021-06-18)
This issue is the first official release.

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. iii


FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) Contents

Contents

About This Document................................................................................................................ ii


1 Quick Guide Usage.................................................................................................................. 1
2 Installation Drawings............................................................................................................. 3
3 Removing Transport Protection Materials........................................................................ 4
4 Initial Configuration Parameters......................................................................................... 5
A Common Torque Selection Table.........................................................................................6

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. iv


FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) 1 Quick Guide Usage

1 Quick Guide Usage

This chapter describes the notes for using the quick guide.

● Before the installation, check whether the materials are intact according to
the packing list. If there is any problem, contact Huawei technical support.
● This document provides only the initial configuration parameters required for
data center commissioning and O&M as well as the drawings and parameters
required for onsite installation.
● Before using this document, read through and keep in mind the safety
precautions and the cautions and notes for operations.
● Precautions provided in this document are only supplementary to the local
laws and regulations governing the data center.
● The system configuration parameters are essential to reliable running of the
system. Improper modifications of parameters may easily cause abnormal
running status, or even damage to the system. You are not allowed to modify
configuration parameters without permission when using the data center. If a
modification is necessary, contact Huawei technical support. Huawei shall not
be responsible for any loss caused by unauthorized configuration
modification.
● You can modify initial configurations under the guidance of Huawei
engineers. Huawei assumes no liability for any loss caused by unauthorized
changes to the initial configurations.
● Some parameters mentioned in this document should be provided and
configured by onsite technical support engineers based on the actual
application of the data center.
● If parameters need to be modified during the running of systems, the
operator should be a professional in this field and familiar with each system
and its working principles.
● Before performing an operation, ensure that the prerequisites are met.
Otherwise, the expected result may not be achieved. More seriously,
equipment damage and personal injury may occur.
● Put on necessary protective equipment such as the safety helmet and gloves
before entering the site.
● A data center can be powered on for commissioning only after it has been
installed and passed the installation check.

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. 1


FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) 1 Quick Guide Usage

● The figures provided in this document illustrate only installation and


connection methods. The actual product appearance prevails.
● Unless otherwise specified, the unit for the dimensions in the figures provided
in this document is mm by default.
● Before using this document, understand the actual product configurations,
solution configuration for the data center in use, type of power grid used by
the customer, and internal configuration of each pre-fab. module.
● When performing operations (such as installing an awning or outdoor unit)
over the top of a pre-fab. module, take measures to protect the top of the
pre-fab. module against damage. Do not perform operations such as arc
welding, drilling, and cutting on the top of a pre-fab. module.

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. 2


FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) 2 Installation Drawings

2 Installation Drawings

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. 3


Checklist of Devices Installed Onsite
Installation Sequence Subcategory Item Diagram ID Diagram Name

Installing Pre-fab. Module Bases


Installing Bases NO.S001 Pre-fab. Module Base Installation Position Diagram
Installing Twistlocks
Installing and Combining Pre-fab.
Modules
Removing the Transport Protection Cover Removing the Transport Protection Cover N/A N/A

Grounding Pre-fab. Modules Grounding Pre-fab. Modules NO.S002 Pre-fab. Module Grounding Position Diagram

Installing External Accessories Installing Eaves Installing Eaves NO.S003 Eave Installation Position Diagram

Outlet Positions of Electric Cables and ELV Signal Electric Cable and ELV Signal Cable Outlet Position
Connecting Cables Installing Electric Cables and ELV Signal Cables NO.S004
Cables Diagram
Installing Air Conditioners and LCD Embedded Air Conditioner and LCD Embedded Piece
Installing Civil Air Conditioners Installing Air Conditioners and LCD Embedded Pieces NO.S005
Pieces Installation Position Diagram
Installing Suspended Ceiling-Aluminum Clip-in Suspended Ceiling-Aluminum Clip-in Panel
Installing Suspended Ceilings Installing Suspended Ceiling-Aluminum Clip-in Panels NO.S006
Panels Installation Position Diagram

Installing Glass Windows Installing Glass Windows Installing Glass Windows NO.S007 Glass Window Installation Position Diagram

Connecting Monitoring Cables NO.M003 Monitoring Onsite Wiring Diagram


Connecting Cables Connecting Cables
Installing External Input Power Cables NO.P003 Mains Input Power Cable Wiring Diagram
No.S001 Pre-fab. Module Base Installation Position Diagram

1,856.9
\

\
2,708
>=\
12,192

3,902.2 12,414

>=\

400

340

260

290
370
430
8-∅
24
Single-capacity base
Steel base
Concrete platform
\

\
Ground

Concrete platform

Note:
1. The concrete platform needs to support a pre-fab. module with the maximum weight of 25,000 kg. The
recommended anti-seismic acceleration is 3g. Calculate the strength of the concrete platform based on
the contact area (refer to the 1720 cm² area of a single-capacity base installed on the ground). Take an
engineering margin into consideration.
2. Each base has eight mounting holes. Only four holes need to be used, preferably the outer four holes. If Item Drawing No. Quantity Unit

an outer hole is on the top of groundwork reinforcing steel bars, select the inner hole instead. Single-capacity
base
DKBA40703508 4 PCS

3. During installation, ensure that the direction of the single-capacity base is the same as the drawing. T-shaped bolt DKBA80473086 4 PCS

4. Reserve two cable outlets for power cables at the shown positions on the ground. It is recommended Expansion bolt
DKBA04802828_M16×
150_S 16 PCS

that the cable outlets be made of steel pipes or PVC pipes with an inner diameter of not less than Ø100
mm and a reserved height of 500 mm aboveground.
No.S002 Pre-fab. Module Grounding Position Diagram

540
540

540
540

93

540

176.7
1,026
176.7

1,026

Note:
1. Four ground points are set for each pre-fab. module, among which two are located
at the front wall and two at the rear wall. For details about the ground points, see the
Item Drawing No. Quantity Unit
figure above. The ground points are connected with the ground grid. Before Ground GB5783-2000_M12X30_S_ZNALL 4 PCS
grounding, remove the aluminum foil from the ground points. The ground bolts are screw

M12×30 stainless steel hexagon bolts with a torque of 60 N·m.


No.S003 Eave Installation Position Diagram

Eave 1 Eave 2

Eave
component

Rubber strip

GB5783-2000_M16X40_S_ZNAL

Note: Item Drawing No. Quantity Unit

1. The eaves are secured on the pre-fab. module using 3 PCS of


Eave 1 DKBA68688294 2 PCS

Eave 2 YT63217430 1 PCS


GB5783-2000_M16X40_S_ZNAL screws with a torque of 40 N·m, as shown Screw
GB5783-2000_M16X40_S_
9 PCS
in the figure. ZNAL
No.S004 Electric Cable and ELV Signal Cable Outlet Position
Diagram

1,470 ELV signal cable outlet


Electric cable outlet 1,042.5 (M50-38)
(M50-38) 840
4,657.5
No.S005 Air Conditioner and LCD Embedded Piece Installation
Position Diagram

619 619 1,200


Air conditioner
Air conditioner
drainage port

280
1,200 drainage port
280

88.9

Glass Embedded piece


window
Embedded pieces

2,518
2,410

2,298

1,898
548
Floor inside the pre-fab. module Floor inside the pre-fab. module

Front wall Rear wall


No.S006 Suspended Ceiling-Aluminum Clip-in Panel Installation
Position Diagram
100
Lighting-1 Lighting-3 Lighting-5 Lighting-7 Lighting-9 Lighting-11
1,800

Front wall Rear wall


600

Lighting-2 Lighting-4 Lighting-6 Lighting-8 Lighting-10 Lighting-12

600

11400
156

Hanging rod

Connection nut Hanger Hanging rod


Hook Bracket
U50 main keel
Aluminum top plate
L-shaped slot Aluminum plate
Triangular Fastening
keel color steel sheet Item Drawing No. Quantity Unit
Aluminum plate and Aluminum ceiling edge
keel connection III strip near the wall
Suspended
Φ8 hanging rod ceiling-aluminum YT81594423(600X600) 45 PCS
clip-in panel 1
Keel hanger

U-shaped main keel


Suspended
Aluminum top plate diagramⅠ Embedded keel
ceiling-aluminum YT81594424(600X600) 3 PCS
Aluminum clip-in panel clip-in panel 2
No.S007 Glass Window Installation Position Diagram
27 5 9 5 8

5+9A+5 hollow glass

Indoor Outdoor
Neutral black sealant

Edge steel sheet


22

Glazing bead

Corner connector
30

Frame

Foam glue Neutral sealant


5

40*20*1.5 Thermal insulation layer


galvanized steel square tube (different project)

Wall
M8*80 nylon expansion
bolt

After all windows are installed, install the glass bead and apply the glass cement.
The glass window packaging components include all the materials.
Item Drawing No. Quantity Unit
Glass
YT63217433(1mX1m) 2 PCS
window
No.M003 Monitoring Onsite Wiring Diagram

Note: The customer provides


network cables to connect to
the network port connector on
the signal cable feeder
window.

A/C A/C

Power & Signal Feeder


DDF-1 DDF-2 DDF-3 DDF-4 DDF-5 DDF-6 DDF-7 DDF-8

Window

IE Socket-1 IE Socket-2 IE Socket-3 IE Socket-4 IE Socket-5

A/C A/C
No.P003 Mains Input Power Cable Wiring Diagram

A/C A/C
C1 C2

Power & Signal Feeder


Air inlet window

Window
Socket-2 Socket-3 Socket-4 Socket-5 Socket-6 Socket-7 Socket-8 Socket-9 Socket-10 Socket-11 Lighting PDB-1 Lighting PDB-2

Socket-14(Air Conditioner)
WY-10A WY-10A WY-10A WY-10A WY-10A WY-10A WY-10A WY-10A WY-10A WY-10A

Lighting-1 Lighting-3 Lighting-5 Lighting-7 Lighting-9 Lighting-11


1000mm*1000mm

Socket-1(Air Conditioner)

WY-10A
A/C A/C
WY-10A

Lighting-2 Lighting-4 Lighting-6 Lighting-8 Lighting-10 Lighting-12

WY-10A
Socket-13
1
Fan Switch-1
Socket-12 1
WY-10A
Lighting Switch-1
Fan-2
Fan-3
Fan-1

1000mm*1000mm

Cable Relation Table Terminal Relation Table

INPUT OUTPUT
Cable No. Breaker Power System Huawei Part Description Terminal Spec From Part 1 Terminal Spec From Part 2
Container From Device Container To Device

Provide by customer Provide by customer


L
Tube 6mm^2 Tube 6mm^2
Provide by customer Provide by customer Provide by customer
C1
/ customer Input / Lighting PDB-1 QF / N
C2 Electronic/Electric Cable -600V/1000V-ZA-YJV22-3x6mm^2- Black (3-cell: brown, blue, yellow/green) -46A,Outdoor Cable,CE OT6-M6 Tube 6mm^2
Provide by customer Provide by customer
PE
OT6-M6 OT6-M6
FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) 3 Removing Transport Protection Materials

3 Removing Transport Protection


Materials

Table 3-1 Transport protection materials to be removed (Add or delete items


based on the actual configuration of the project.)
No. Device Protection Materials to Be
Removed

1 Smart cooling product Transport fastener

2 Light Securing tape

3 Emergency light Securing tape

4 Camera Securing tape

5 Emergency door release Plastic cover


button

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. 4


FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) 4 Initial Configuration Parameters

4 Initial Configuration Parameters

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. 5


List of Initial Configuration Parameters
Detailed Initial Configuration
Category Diagram ID Diagram Name
Parameters

NO.P001 Power Supply and Distribution Device Layout Diagram N/A


Initial Configurations for the Power Supply and Distribution System
NO.P002 Power Supply and Distribution System Diagram N/A

Initial Configurations for the Cooling System (Air Cooled) NO.C001 Cooling Device Layout Diagram N/A

Initial Configurations for the Management System NO.M001 Monitoring Device Layout Diagram N/A

Initial Configurations for the Fire Extinguishing System NO.F001 Fire Extinguishing Device Layout Diagram (CE) N/A

Other Systems NO.F003 Emergency Exit Diagram N/A


No.P001 Power Supply and Distribution Device Layout Diagram

A/C A/C

Power & Signal Feeder Window


Air inlet window

Socket-2 Socket-3 Socket-4 Socket-5 Socket-6 Socket-7 Socket-8 Socket-9 Socket-10 Socket-11 Lighting PDB-1 Lighting PDB-2

WY-10A WY-10A WY-10A WY-10A WY-10A WY-10A WY-10A WY-10A WY-10A WY-10A

Socket-14(Air Conditioner)
Lighting-1 Lighting-3 Lighting-5 Lighting-7 Lighting-9 Lighting-11
1000mm*1000mm

Socket-1(Air Conditioner)

WY-10A
A/C A/C
WY-10A

Lighting-2 Lighting-4 Lighting-6 Lighting-8 Lighting-10 Lighting-12

WY-10A
Socket-13
1
Fan Switch-1
Socket-12 1
WY-10A
Lighting Switch-1
Fan-1
Fan-2
Fan-3

1000mm*1000mm

Socket

1
Lighting Switch
1
Fan Switch

Lighting
10A/1P MCB+YO+AUX
QF9

Spare
QF8

10A/1P MCB
Spare
QF7

10A/1P MCB
Socket-10/11
No.P002 Power Supply and Distribution System Diagram

QF6

10A/1P MCB
Socket-8/9
QF5

10A/1P MCB
Socket-6/7
32A/1P RCD

QF4

10A/1P MCB
Customer Input

Socket-4/5
QF3

10A/1P MCB
QF

Socket-2/3
QF2

16A/1P MCB
Lighting PDB-2

Socket-13
QF1

16A/1P MCB
Socket-12
10A/1P MCB+YO+AUX
QF9

Fan Switch-1
QF8

10A/1P MCB
Spare
QF7
10A/1P MCB
Spare

QF6
10A/1P MCB
Spare

QF5
10A/1P MCB
Exit-1

32A/1P RCD

QF4
10A/1P MCB
Customer Input

Emergency Lighting-1/2

QF3
10A/1P MCB

QF
Lighting Switch-1 Lighting-1~14

QF2
16A/1P MCB

Lighting PDB-1
Socket-14(Air Conditioner)

QF1
16A/1P MCB
Socket-1(Air Conditioner)
No.C001 Cooling Device Layout Diagram

A/C A/C

Air inlet window


1000mm*1000mm

A/C A/C
Fan-1
Fan-2
Fan-3

1000mm*1000mm
No.M001 Monitoring Device Layout Diagram

A/C A/C

Power & Signal Feeder


DDF-1 DDF-2 DDF-3 DDF-4 DDF-5 DDF-6 DDF-7 DDF-8

Window

IE Socket-1 IE Socket-2 IE Socket-3 IE Socket-4 IE Socket-5

A/C A/C
No.F001 Fire Extinguishing Device Layout Diagram (CE)

A/C A/C

Power & Signal Feeder


Window

A/C A/C

Exit-1
Emergency Lighting-1 Emergency Lighting-2
Emergency Lighting EXIT Emergency Lighting
No.F003 Emergency Exit Diagram

A/C A/C

Power & Signal Feeder


Window

A/C A/C
FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) A Common Torque Selection Table

A Common Torque Selection Table

NOTE

This table lists only the recommended torque for common screws, bolts, and pipe
connectors. The torques you choose should meet project requirements.

Table A-1 Common torque selection table (for reference)


Item Tightening Torque (Tolerance: ±10%)/
(Unit: Kgf.cm)

Thread Name Tightenin Structura Electrical Connection


Type g Tool l
(for Connecti OT/DT Cord End Positive/
Referenc on Terminal Terminal Negative
e) (Commo Block Battery
n Steel Wiring
Connecto Terminal
r)

M3 Cross Electric 6 \ 6 \
recessed screwdriv
small er
pan head
screw
assembly

M4 Cross Electric 12 12 14 \
recessed screwdriv
counters er
unk head
screw;
cross
recessed
pan head
screw
assembly

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. 6


FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) A Common Torque Selection Table

Item Tightening Torque (Tolerance: ±10%)/


(Unit: Kgf.cm)

M5 Cross Electric 30 \ \ \
recessed screwdriv
pan head er
thread
forming
screw

M5 Cross Pneumati 50 \ \ \
recessed c
counters screwdriv
unk head er
wood
screw

M6 Cross Pneumati 30 50 30 50
recessed c
hexagon screwdriv
head er/
screw Electric
assembly screwdriv
er

M8 Cross Torque 200 130 \ \


recessed wrench
hexagon
head
screw
assembly

Cross Pneumati 80 \ \ \
recessed c
counters screwdriv
unk head er
screw

M10 Hexagon Torque 400 270 \ \


head wrench
screw
assembly

M12 Hexagon Torque 600 470 \ \


head wrench
screw
assembly

M16 Common Torque 1600 1200 \ \


bolt wrench

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. 7


FusionDC1000A40 Prefabricated All-in-One Data
Center
Quick Guide (2021, Zambia, ZESCO) A Common Torque Selection Table

Item Tightening Torque (Tolerance: ±10%)/


(Unit: Kgf.cm)

ST4.8 Cross Pneumati 30 (for \ \ \


recessed c checking,
pan head screwdriv not for
self- er tightenin
drilling g)
tapping
screw

ST6.3 Cross Pneumati 50 (for \ \ \


recessed c checking,
hexagon screwdriv not for
flange er tightenin
self- g)
drilling
tapping
screw

G1/2'' 1/2'' pipe Torque 350 \ \ \


connecto wrench
r

G3/4'' 3/4'' pipe Torque 600 \ \ \


connecto wrench
r

G1'' 1'' pipe Torque 600 \ \ \


connecto wrench
r

Issue 01 (2021-06-18) Copyright © Huawei Technologies Co., Ltd. 8