MECHANICAL:

# MECHANICAL KEYNOTES MECHANICAL GENERAL NOTES


MALE MALE 1. EXISTING BOILER TO REMAIN. 1. ALL LINES SHOWN SCHEMATICALLY AND ARE A GENERAL GUIDELINE. ANY
MAJOR DEVIATION FROM WHAT IS SHOWN IS TO BE APPROVED BY PS
WASHROOM WASHROOM 2. EXISTING JOHN WOOD MODEL JW850540N-PV-E52 GAS-FIRED DIRECT ENGINEERING.
24 131 24 131 VENTED WATER HEATER TO BE REMOVED COMPLETE WITH ELECTRICAL,
CONTROLS, GAS PIPING AND VENT THRU WALL. CAP-OFF GAS LINE AND 2. ALL HOT WATER HEATING AND WATER LINES TO BE INSULATED AS PER
27 27
PS. Engineering Inc
PATCH EXTERIOR WALL AND MAKE GOOD AND LEVEL TO EXISTING SPEC AND CANVAS WRAPPED. PROVIDE PVC JACKET IN EXPOSED AREAS.
W.R. W.R. SURROUNDINGS. LABEL AS PER SPECIFICATION. Mechanical Consulting Engineers
134 134 3. EXISTING PRIMARY HOT WATER HEATING PUMPS TO REMAIN. 3. ALL EQUIPMENT TO BE INSTALLED IN ACCORDANCE WITH THE
200-1815 Rae St. Regina, SK. S4T 2E3
MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS. Contact: Guy Sander
36 36 4. EXISTING SECONDARY HOT WATER HEATING PUMPS TO REMAIN. Phone : (306) 565-0411
37 4. CONTRACTOR TO SUPPLY AND INSTALL PLUMBING VENTS, TRAP SEAL
5 MD-1 16"x10" EF-1 5 16"x10"
Email : gsander@pseng.ca
5. EXISTING DOMESTIC HOT WATER RECIRC PUMP TO REMAIN. PRIMERS, CLEANOUTS, AND ISOLATION VALVES AS PER CODE.
HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS

HWR HWR 212" HWR HWR 212" 6. EXISTING EXPANSION TANK TO REMAIN. 5. PROVIDE FIRE STOPS AT ALL PIPING THAT PASSES THRU FIRE
SEPARATIONS.

HWS

HWS
6 6 7. HYDRALIC SEPARATOR TO REMAIN.
9 9 6. ALL PLUMBING TO BE INSTALLED IN ACCORDANCE WITH THE LATEST
3" 3" 8. EXISTING PUMP TO BE REPLACED. SEE 2/M-1, 1/M-2, AND 2/M-2 FOR VERSIONS OF THE NATIONAL BUILDING CODE, NATIONAL PLUMBING CODE,
CONTINUATION. LOCAL AUTHORITY CONSTRUCTION DESIGN STANDARDS, MUNICIPALITY

HWS

HWS
BYLAWS, AND ALL OTHER APPLICABLE CODES AND REGULATIONS.
13 4 13 4 9. EXISTING SIDE STREAM FILTER TO REMAIN.
1 1 1 1
10 10 7. PROVIDE A COPY OF PLUMBING AND GAS PERMITS TO OWNER.
14 14 10. EXISTING DOMESTIC HOT WATER SUPPLY PUMP TO REMAIN.
HWR

HWR
8. PROVIDE ISOLATION VALVES ON ALL EQUIPMENT AS REQUIRED. ALL
18 18
15 15 11. EXISTING FLOOR DRAIN TO REMAIN. ISOLATION VALVES ARE TO BE ACCESSIBLE.
3
4 4 12. EXISTING HOT WATER UNIT HEATER TO REMAIN. 9. COORDINATE ALL WORK WITH OTHER TRADES.

HWR

HWR
23 P-1 23

HWR

HWR
19
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////

21 HWS HWS HWS 8 21 HWS HWS HWS 13. EXISTING DOMESTIC HOT WATER HEAT EXCHANGER TO REMAIN. 10. ALL WORK TO BE COORDINATED WITH THE BUILDING OWNER AS THE
HWR

HWR
35
FACILITY REMAINS IN OPERATION.
11 12 14. EXISTING RECIRC PUMP TO REMAIN.
11 36
HWS

HWS
7 7 15. EXISTING DOMESTIC HOT WATER STORAGE TANK TO REMAIN.
HWR

HWR
12 3 3
17
BOILER 23 17
BOILER 23 16. EXISTING TRANSFORMER TO REMAIN.
HWR HWR
130 130
HWS

HWS
17 17 17. EXISTING ELECTRICAL PANELS/SWITCH GEAR TO REMAIN.
23 23
HWR

HWR
16 39 16 39
18. EXISTING GAS SERVICE TO REMAIN.
HWS

HWS
26 25 26 25
19. EXISTING GAS LINE TO BE REMOVED FROM DOMESTIC WATER HEATERS
HWR

HWR
TO GAS METER. PATCH EXTERIOR WALL AND MAKE GOOD AND LEVEL TO

HWR

HWR
HWS

HWS
19
EXISTING SURROUNDINGS.
HWS

HWS
20. EXISTING WALL MOUNTED EXHAUST FAN TO REMAIN.
HWR

HWR
HWR

HWR
HWS

HWS
21. EXISTING WATER METER TO REMAIN.
HWS

HWS
22. HOT AND COLD WATER LINES CONTINUE TO WASHROOM/SHOWER.
MECHANICAL EQUIPMENT SCHEDULE
HWR

HWR
HWR

HWR
HWS

HWS
23. SEE BOILER SCHEMATIC 1/M-2 AND 2/M-2 FOR CONTINUATION OF HOT
112"
WATER HEATING SUPPLY AND RETURN LINES. IDH1 & IDH2 - INDIRECT WATER HEATERS #1 & #2
HWS

HWS
ZAMBONI ZAMBONI SUPPLY AND INSTALL AN ADVANCED METALPRES INC. MODEL 80XL INDIRECT
129 129
HWR

HWR
112" 112" 24. DOMESTIC HOT, COLD, AND HOT WATER RECIRC CONTINUES TO BUILDING HOT WATER STORAGE TANK OR EQUAL. UNIT TO PROVIDE 216 MBH HEATING

HWR

HWR
HWS

HWS
DISTRIBUTION. CAPACITY @ 180°F SUPPLY TEMPERATURE, 80 USGALLON, 452 USGPM FIRST
212" 212" HOUR, 372 USGPM SECOND HOUR, 20 GPM, 7 FEET HEAD. UNIT TO BE
HWS

HWS
1 1 25. EXISTING HOT WATER HEATING SUPPLY AND RETURN LINES TO ZAMBONI COMPLETE WITH HEAVY GAUGE 316L STAINLESS STEEL TANK, 2.5"
2" 2"
MELTING PIT. SEE BOILER SCHEMATIC 1/M-2 AND 2/M-2 FOR POLYURETHANE INSULATION, AQUASTAT, STAINLESS STEEL WELL, P&T RELIEF
HWR

HWR
12 12
HWR

HWR
HWS

HWS
112" CONTINUATION. VALVE WITH TEE, AND DRAIN VALVE.
P-1 - PUMP #1
HWS

HWS
26. EXISTING ZAMBONI HOT WATER FILL LINES. SEE BOILER SCEMATIC 1/M-2 SUPPLY AND INSTALL A GRUNDFOS MODEL UPS 75-69F TO PROVIDE 50 GPM @
19 AND 2/M-2 FOR CONTINUATION. 20 FT HEAD WITH A 1.5 H.P. MOTOR @ 208 VOLT, SINGLE PHASE. UNIT TO BE
HWR

HWR
HWR

HWR
HWS

HWS
3
114" 3
114" 2-SPEED WITH 3" FLANGE INLET AND OUTLET OR EQUAL. UNIT TO OPERATE
4" 4"
27. NATURAL GAS LINE CONTINUES TO BUILDING DISTRIBUTION. CONTINUOUSLY. WIRE TO NEAREST AVAILABLE ELECTRICAL CIRCUIT WITH
HWS

HWS
ON/OFF STARTER SWITCH.
28. CAP-OFF DOMESTIC COLD AND DOMESTIC HOT WATER LINES AND EF1 - EXHAUST FAN #1
HWR

HWR
31 31
HWR

HWR
HWS

HWS
REMOVE PIPING DOWNSTREAM TO ACCOMMODATE REMOVAL AND QUOTE AS SEPARATE PRICE #1 TO SUPPLY AND INSTALL A BROAN MODEL
HWS
REPLACEMENT OF EXISTING WATER HEATERS. SEE 2/M-1, 1/M-2, AND 2/M-2 L900L LOSONE SELECT INLINE VENTILATOR OR EQUAL. UNIT TO EXHAUST 847
33 32 FOR CONTINUATION.
HWR / / / /HWR
/////// CFM @ 0.25" S.P. WITH A 305 WATT MOTOR @ 120 VOLTS VAC. UNIT TO BE
31 COMPLETE WITH BACKDRAFT DAMPER AND VIBRATION ISOLATORS
29. CONNECT NEW HOT WATER HEATER STORAGE TANKS TO EXISTING
HWR

HWR
HWS

HWS
INTERLOCKED TO OPERATE VIA REVERSE ACTING THERMOSTAT WITH

HWS
HWR
29 ZAMBONI FILL LINE IN APPROXIMATE LOCATION SHOWN. CONTRACTOR TO MOTORIZED DAMPER 'MD1' WHEN ROOM TEMPERATURE EXCEEDS 80°F. PROFESSIONAL SEAL:
////////// DETERMINE EXACT LOCATION ON SITE. MD1 - MOTORIZED DAMPER #1
19 112"
//////////////

AS SEPARATE PRICE #1 SUPPLY AND INSTALL A 16"x16" MOTORIZED INLET AIR


28 22 22 30. CONNECT NEW HOT WATER HEATER STORAGE TANKS TO EXISTING COLD DAMPER COMPLETE WITH BELIMO OPERATOR @ 120 VOLT, SINGLE PHASE
///////////////////////////////////////////////

HWS
HWR
40 40 2" 2" WATER LINE AT APPROXIMATE LOCATION SHOWN. CONTRACTOR TO INTERLOCKED TO OPEN ON OPERATION OF EXHAUST FAN 'EF-1'.
38 38
DETERMINE EXACT LOCATION ON SITE.
///// 112"
////////////////////////////////

19 2 31. CAP-OFF EXISTING HOT WATER HEATING SUPPLY AND RETURN LOOP AT

HWS
HWR
/////// IWH-1 APPROXIMATE LOCATION SHOWN. CONTRACTOR TO DETERMINE EXACT
19 ////// ////////// LOCATION ON SITE.
///////////////////////////

HWS
2 34
///////
32. CONNECT NEW HOT WATER HEATING SUPPLY LINE TO EXISTING HOT

HWR
WATER SUPPLY LINE AT APPROXIMATE LOCATION SHOWN. CONTRACTOR
////// ////////// 2 TO DETERMINE EXACT LOCATION ON SITE.
19 3
4"
HWR 3
/////// 4"
22 33. CONNECT NEW HOT WATER HEATING RETURN LINE TO EXISTING HOT
IWH-2 22
////// ////////// 1 WATER RETURN LINE AT APPROXIMATE LOCATION SHOWN. CONTRACTOR
1 2"
// 34 TO DETERMINE EXACT LOCATION ON SITE.

34. NEW INDIRECT ZAMBONI SUPPLY HOT WATER HEATING STORAGE TANKS.
112" 20 20
28 30
35. NEW HOT WATER HEATING CIRCULATION PUMP TO NEW ZAMBONI HOT
WATER STORAGE TANK. WIRE TO NEAREST AVAILABLE ELECTRICAL
CIRCUIT. SEE 1/M-2 AND 2/M-2 FOR CONTINUATION. 23 08 15

36. AS SEPARATE PRICE #1 INSTALL NEW EXHAUST FAN AND MOTORIZED


INTAKE AIR DAMPER WITHIN EXISTING BLANKED-OFF COMBUSTION AIR
1 EXISTING BOILER ROOM FLOOR PLAN 2 PROPOSED BOILER ROOM FLOOR PLAN INTAKE. EXHAUST FAN TO OPERATE AND MOTORIZED DAMPER TO OPEN
WHEN ROOM TEMPERATURE EXCEEDS 80°F VIA AN ADJUSTABLE REVERSE
M-1 SCALE: 1/4"=1'-0" M-1 SCALE: 1/4"=1'-0"
ACTING THERMOSTAT. MOUNT MOTORIZED INTAKE IN OPENING BELOW
FAN OUTLET.

37. PROVIDE METAL MESH STEEL GRILLE ON INTAKE.

38. EXISTING HOT WATER HEATING SUPPLY AND RETURN LINES CONTINUE.

39. EXISTING FIRE EXTINGUISHER TO REMAIN. NO. DESCRIPTION DATE

40. EXISTING WALL MOUNTED MOTORIZED LOUVRE TO REMAIN. THESE DRAWINGS ARE THE PROPERTY OF THE RESPECTIVE
DRAWING LIST CONSULTANTS AND AS SUCH MAY NOT BE USED OR
PIPING SYMBOL LEGEND EXPANSION JOINT PIPING SYMBOL LEGEND REPRODUCED IN ANY MANNER WITHOUT WRITTEN
M-1 EXISTING & NEW BOILER ROOM PLANS CONTROL SYMBOL LEGEND PERMISSION.
SYMBOL DESCRIPTION DIRECTION OF FLOW SYMBOL DESCRIPTION
M-2 EXISTING BOILER ROOM SCHEMATIC SYMBOL DESCRIPTION
GATE VALVE PIPE CAP DOMESTIC COLD WATER CLIENT:
M-3 PROPOSED BOILER ROOM SCHEMATIC BALL VALVE TRIPLE DUTY VALVE DOMESTIC HOT WATER AS H THERMOSTAT/HUMIDISTAT
DOMESTIC HOT WATER
M-4 MECHANICAL SPECIFICATIONS BUTTERFLY VALVE
CHECK VALVE MAV AAV
SUCTION DIFFUSER
RECIRCULATION AS THERMOSTAT c/w GUARD PLA-MOR PALACE
DOUBLE CHECK VALVE AIR VENTS - MANUAL AND AUTOMATIC DOMESTIC COLD WATER - SOFT
S FANSPEED CONTROL
STEAM TRAP - FLOAT AND THERMOSTATIC TEMPERED WATER
GLOBE VALVE
FILTERED DRINKING WATER CO2 CO2 SENSOR
REDUCED PRESSURE PRINCIPLE BACK-FLOW STEAM TRAP - BUCKET
PREVENTOR SANITARY SEWER
STEAM TRAP - THERMOSTATIC PO CONTROL CONNECTIONS
SANITARY SEWER - UNDERGROUND
LOCKSHIELD BALANCING VALVE HOSE BIBB T
STORM SEWER TS TEMPERATURE SENSORS
NF NON-FREEZE HOSE BIBB STORM SEWER - UNDERGROUND
CONTROL VALVES F

TRAP NATURAL GAS LINE FLOW SENSOR


PRESSURE REDUCING VALVE PROJECT:
FLOOR DRAIN & FUNNEL FLOOR DRAIN SPRINKLER PIPING TEMPERATURE GAUGE
COMPRESSED AIR PIPING
PRESSURE RELIEF VALVE CONNECT NEW PIPE TO EXISTING
CLEAN-OUT EQUIPMENT DRAIN PRESSURE GAUGE ZAMBONI DOMESTIC WATER
AUTOMATIC FLOW CONTROL DEVICE
AUTOMATIC FLOW CONTROL DEVICE WITH
PIPE DROP
HWS

HWR
HWS

HWR
HWS

HWR
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
HEATER TANK REPLACEMENT
INTEGRAL VALVE AND STRAINER PIPE RISE
GLYCOL HEATING SUPPLY
PRESSURE INDEPENDENT AUTOMATIC FLOW PIPE TEE
GLYCOL HEATING RETURN
CONTROL VALVE WITH DDC CONTROL MOTOR PIPE ELBOW MOOSE JAW, SASKATCHEWAN
PLA-MOR PALACE ARENA SOLAR HEATING SUPPLY
O S AND Y VALVE
BOILER ROOM PLANS. PIPE CONTINUATION SOLAR HEATING RETURN
GAS COCK VALVE CONNECT TO DRAIN - INDIRECT
TO DRAIN HEAT PUMP LOOP SUPPLY
FLEXIBLE PIPE CONNECTION TEMPERATURE GAUGE HEAT PUMP LOOP RETURN
DRAWING TITLE:
STRAINER PRESSURE GAUGE CHILLED WATER SUPPLY
UNION P & T PLUG CHILLED WATER RETURN EXISTING & NEW
3-WAY CONTROL VALVE CONDENSER WATER SUPPLY
PIPE ANCHOR
CONDENSER WATER RETURN BOILER ROOM PLANS
PLA-MOR PALACE ARENA REFRIGERANT SUCTION
REFRIGERANT LIQUID
LOW PRESSURE STEAM
3 KEY PLAN LOW PRESSURE CONDENSATE
PROJECT : 23-295 DRAWING NUMBER:
M-1 SCALE: N.T.S. MANHOLE
CATCH BASIN DATE : AUGUST 2023
ROOF PIPE SUPPORTS
SCALE : AS NOTED M-1
DRAWN : SMH
THIS DRAWING IS NOT TO BE SCALED. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND OTHER DATA FROM THE PROJECT AND REPORT ANY DISCREPANCIES TO CONSULTANT TEAM BEFORE PROCEEDING WITH ANY
WORK. ALL WORK TO COMPLY WITH ALL APPLICABLE CODES, STANDARDS AND REGULATIONS. CHECKED : GAS REV:
MECHANICAL:
# MECHANICAL KEYNOTES
8 1. EXISTING BOILER TO REMAIN.

2. EXISTING HOT WATER CIRCULATION PUMP TO REMAIN.

3. EXISTING DOMESTIC HOT WATER RECIRC PUMP TO REMAIN. PS. Engineering Inc
4. EXISTING HYDRAULIC SEPARATOR TO REMAIN. Mechanical Consulting Engineers
200-1815 Rae St. Regina, SK. S4T 2E3
5. EXISTING HOT WATER HEATING CIRCULATOR TO BE REPLACED WITH NEW
CIRCULATOR P-1. SEE 1/M-1, 2/M-1, AND 2/M-2 FOR CONTINUATION.
Contact: Guy Sander
Phone : (306) 565-0411
6. EXISTING EXPANSION TANK TO REMAIN. Email : gsander@pseng.ca
3 HWR HWR HWR HWR HWR HWR HWR HWR HWR 12
7. EXISTING WATER SERVICE/METER TO REMAIN.
PRV HWR HWR

HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR 8. EXISTING DOMESTIC HOT, DOMESTIC COLD, AND DOMESTIC HOT WATER

HWR

HWR
RECIRC LINER CONTINUES TO BUILDING DISTRIBUTION.

HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR 9. EXISTING DOMESTIC HOT WATER STORAGE TANK TO REMAIN.

HWR

HWR
10. EXISTING DOMESTIC HOT WATER HEAT EXCHANGER TO REMAIN.
1
2" 11. EXISTING SIDE STREAM FILTER, SITE GLASS, AND POT FEEDER TO
REMAIN.

HWR

HWR

HWR
3" 6" 6" 6"
HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR 12. HOT WATER HEATING SUPPLY AND RETURN LINES CONTINUE TO BUILDING
13 HOT WATER HEATING DISTRIBUTION SYSTEM.
13
3" 13. EXISTING NATURAL GAS LINE CONTINUES TO BUILDING GAS SERVICE AND
3" 4
212" BUILDING NATURAL GAS DISTRIBUTION SYSTEM.
HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS

HWR
14. EXISTING HOT WATER HEATING SUPPLY AND RETURN LINES DOWN TO
HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS
ZAMBONI MELTING PIT.

HWS

HWR
6"

HWR
FS

HWR
FS 15. EXISTING GRUNDFOS MODEL UPS 26-99FC CIRCULATING PUMP TO

HWS
HWS HWS HWS HWS HWS
3" 6" HWS HWS 12 REMAIN.

HWS
1
2"
HWS

HWS
16. EXISTING HOT WATER UNIT HEATER TO REMAIN IN ZAMBONI ROOM AND

HWR
1

HWR
2"

HWS

HWS
2 2 MECHANICAL ROOM.
HWR

HWS

HWS
HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR
1
2"

HWS
1
2" 17. EXISTING ZAMBONI FILL MANIFOLD, HOSE, BACKFLOW PREVENTOR, ETC.

HWR
HWS

HWS
TO REMAIN.

HWR

HWR
HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS
HWR

HWS
18. EXISTING ZAMBONI GAS-FIRED DOMESTIC HOT WATER HEATERS JOHN
3" 3"

HWS
WOOD MODEL JW850540N-PV-E52 TO BE REMOVED COMPLETE WITH GAS

HWS

HWS
HWS

HWS
13 PIPING, ELECTRICAL, VENT THRU EXTERIOR WALL, ETC. PATCH EXTERIOR

HWS
HWS
HWR

HWR
212" 212" 16 WALL AND MAKE GOOD AND LEVEL TO EXISTING SURROUNDINGS. SEE
HWR

HWS
6"
LL LL 1/M-1 FOR CONTINUATION.

HWS
6
HWS

HWS

19. CAP-OFF EXISTING DOMESTIC COLD WATER LINE AND DOMESTIC HOT

HWS
HWR

HWR
1 1 WATER LINE AND REMOVE PIPING TO ACCOMMODATE REPLACEMENT OF
HWR

HWS
DOMESTIC HOT WATER HEATERS. SEE 1/M-1 FOR CONTINUATION.
5 212"

HWS
HWS

HWS

HWS
HWR

HWR
4"
HWR

HWS
9

HWS
10
HWS

HWS

MASTER

HWS
HWS
HWR

HWR
BOILER
HWR

HWS
CN1 CN2 2
HWS HWS
2"
HWS

HWS
HWR

HWR
HWS
3
HWS

3 3
4" 4"
HWR

HWR
HWS
7 3
4"
11

HWS

HWS
3
4"
HWS
HWR

HWR
HWS
HWS PROFESSIONAL SEAL:
HWS

11
HWR

HWR
HWS
HWS
HWR

HWR
HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS

HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR
HWS

HWS
HWR

HWR
BOILER ROOM
ZAMBONI ROOM
212" 15
HWS

HWR
HWS
1"
HWR

HWS 112"
2" 23 08 15
14
HWR HWR HWR
HWS

HWR
HWS
2"
HWR

112"
112" 16
HWS

17

HWR
HWS
HWR

112" 212" 3
4"
HWS
HWR

12
HWS HWS
NO. DESCRIPTION DATE

BF 17 HWR HWR
THESE DRAWINGS ARE THE PROPERTY OF THE RESPECTIVE
CONSULTANTS AND AS SUCH MAY NOT BE USED OR
17 REPRODUCED IN ANY MANNER WITHOUT WRITTEN
17 PERMISSION.

CLIENT:
1
2"
112" PLA-MOR PALACE
8
19
19 19
///////

19 112"
///////////////////////////////////////////////////////////////////
///////////

///////////

///////////

//////////////////////////////////////////////////////////////////////
///////

///////

///////

PROJECT:

ZAMBONI DOMESTIC WATER


HEATER TANK REPLACEMENT
MOOSE JAW, SASKATCHEWAN
18 18 18

DRAWING TITLE:

/// /// /// EXISTING BOILER ROOM


////

////

////

18

/////////////////////////////////////////////////////////////////////////// 18
SCHEMATIC
18

PROJECT : 23-295 DRAWING NUMBER:


1 EXISTING BOILER ROOM SCHEMATIC DATE : JULY 2023
M-2 SCALE: N.T.S.
SCALE : AS NOTED M-2
DRAWN : SMH
THIS DRAWING IS NOT TO BE SCALED. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND OTHER DATA FROM THE PROJECT AND REPORT ANY DISCREPANCIES TO CONSULTANT TEAM BEFORE PROCEEDING WITH ANY
WORK. ALL WORK TO COMPLY WITH ALL APPLICABLE CODES, STANDARDS AND REGULATIONS. CHECKED : GAS REV:
MECHANICAL:
8
MECHANICAL KEYNOTES
1. EXISTING BOILER TO REMAIN.

2. EXISTING HOT WATER CIRCULATION PUMP TO REMAIN.


PS. Engineering Inc
3. EXISTING DOMESTIC HOT WATER RECIRC PUMP TO REMAIN.
Mechanical Consulting Engineers
4. EXISTING HYDRAULIC SEPARATOR TO REMAIN. 200-1815 Rae St. Regina, SK. S4T 2E3
5. EXISTING HOT WATER HEATING CIRCULATOR TO BE REPLACED WITH NEW Contact: Guy Sander
3 HWR HWR HWR HWR HWR HWR HWR HWR HWR 12 CIRCULATOR P-1. SEE 1/M-1, 2/M-1, AND 2/M-2 FOR CONTINUATION. Phone : (306) 565-0411
PRV HWR HWR Email : gsander@pseng.ca
6. EXISTING EXPANSION TANK TO REMAIN.
HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR

HWR

HWR
7. EXISTING WATER SERVICE/METER TO REMAIN.

HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR
8. EXISTING DOMESTIC HOT, DOMESTIC COLD, AND DOMESTIC HOT WATER
RECIRC LINER CONTINUES TO BUILDING DISTRIBUTION.

HWR

HWR
9. EXISTING DOMESTIC HOT WATER STORAGE TANK TO REMAIN.
1
2"
10. EXISTING DOMESTIC HOT WATER HEAT EXCHANGER TO REMAIN.

HWR

HWR

HWR
3" 6" 6" 6" 11. EXISTING SIDE STREAM FILTER, SITE GLASS, AND POT FEEDER TO
HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR
13 REMAIN.
13
3" 12. HOT WATER HEATING SUPPLY AND RETURN LINES CONTINUE TO BUILDING
3" 4 HOT WATER HEATING DISTRIBUTION SYSTEM.
1
2 2"
HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS

HWR
13. EXISTING NATURAL GAS LINE CONTINUES TO BUILDING GAS SERVICE AND
HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS BUILDING NATURAL GAS DISTRIBUTION SYSTEM.

HWS

HWR
6"

HWR
FS
14. EXISTING HOT WATER HEATING SUPPLY AND RETURN LINES DOWN TO

HWR
FS

HWS
HWS HWS HWS HWS HWS
3" 6" HWS HWS 12 ZAMBONI MELTING PIT.

HWS
1
2"
HWS

HWS
15. EXISTING GRUNDFOS MODEL UPS 26-99FC CIRCULATING PUMP TO

HWR
1

HWR
2"

HWS

HWS
HWR 2 2 REMAIN.

HWS

HWS
HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR
1
2"

HWS
1
2" 16. EXISTING HOT WATER UNIT HEATER TO REMAIN IN ZAMBONI ROOM AND

HWR
HWS

MECHANICAL ROOM.

HWS
HWR

HWR
HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS
HWR

HWS
17. EXISTING ZAMBONI FILL MANIFOLD, HOSE, BACKFLOW PREVENTOR, ETC.
3" 3"

HWS
TO REMAIN.

HWS

HWS
HWS

HWS
13

HWS
HWS
HWR

HWR
212" 212" 16 18. CAP-OFF EXISTING LOOPED HOT WATER HEATING SUPPLY AND RETURN
HWR

HWS
6" LINES IN ZAMBONI ROOM TO ACCOMMODATE CONNECTION TO EXISTING
LL LL

HWS
ZAMBONI INDIRECT HOT WATER HEATING TANKS. SEE 2/M-1 FOR
6
HWS

HWS
CONTINUATION.

HWS
HWR

HWR
1 1
HWR

HWS
19. CONNECT NEW 2" HOT WATER HEATING SUPPLY AND RETURN LINES TO
5 212" NEW ZAMBONI INDIRECT DOMESTIC HOT WATER HEATING TANKS AT

HWS
HWS

HWS

APPROXIMATE LOCATION SHOWN. CONTRACTOR TO DETERMINE EXACT

HWS
HWR

HWR
4" LOCATION ON SITE. SEE 2/M-1 FOR CONTINUATION.
HWR

HWS
9 20. REPLACE EXISTING ZAMBONI GAS-FIRED DOMESTIC HOT WATER HEATERS

HWS
10
HWS

WITH NEW INDIRECT HOT WATER HEATERS COMPLETE WITH ADJUSTABLE


HWS

MASTER

HWS
HWS
HWR

HWR
BOILER AQUASTAT CONTROL, P&T SAFETY RELIEF, THERMOSTAT, AND DRAIN
HWR

HWS
2 VALVE. SEE 2/M-1 FOR CONTINUATION.
CN1 CN2
HWS HWS
2" 21. NEW 3-WAY CONTROL VALVES TO BE CONTROLLED BY ADJUSTABLE
HWS

HWS
HWR

HWR
INDIRECT TANK AQUASTAT TO MAINTAIN DOMESTIC HOT WATER
SETPOINT. SEE 2/M-1 FOR CONTINUATION.

HWS
3
HWS

3 3
4" 4"
HWR

HWR
HWS
7 3
4"
11

HWS

HWS
3
4"
HWS
HWR

HWR
HWS
HWS
HWS

11 PROFESSIONAL SEAL:
HWR

HWR
HWS
HWS
HWR

HWR
HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS HWS

HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR HWR
HWS

HWS
HWR

HWR
BOILER ROOM
ZAMBONI ROOM
212" 15
HWS

HWR
HWS
1"
HWR

HWS 112"
14 2"
HWR HWR HWR
23 08 15
HWS

HWR
HWS
2"
HWR

112"
112" 16
HWS

17

HWR
HWS
HWR

112" 212" 3
4"
HWS
HWR

18
12
HWS HWS
19
19
17
/////////////// NO. DESCRIPTION DATE
BF HWR HWR
2" 2"
HWR HWR HWR HWR HWR
17 THESE DRAWINGS ARE THE PROPERTY OF THE RESPECTIVE
HWS

17 112" CONSULTANTS AND AS SUCH MAY NOT BE USED OR


HWR

REPRODUCED IN ANY MANNER WITHOUT WRITTEN


112" 112" PERMISSION.
1 HWR
1
1 2"
2"
21 21 CLIENT:
112"
112"
PLA-MOR PALACE
HWS

8
HWR HWR HWR HWR
112"
HWR
HWR

112"
HWS

HWS HWS HWS HWS


112"
HWS

112" 1" 1"


HWR

112" PROJECT:
HWR
HWS

HWS
HWR

112" 112" ZAMBONI DOMESTIC WATER


20 20
HEATER TANK REPLACEMENT
HWR
HWS

HWS
HWR

IWH-1 IWH-2
AS 112" AS

MOOSE JAW, SASKATCHEWAN

DRAWING TITLE:

PROPOSED BOILER ROOM


1" 1"
SCHEMATIC
112"

PROJECT : 23-295 DRAWING NUMBER:


1 PROPOSED BOILER ROOM SCHEMATIC DATE : AUGUST 2023
M-3 SCALE: N.T.S.
SCALE : AS NOTED M-3
DRAWN : SMH
THIS DRAWING IS NOT TO BE SCALED. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND OTHER DATA FROM THE PROJECT AND REPORT ANY DISCREPANCIES TO CONSULTANT TEAM BEFORE PROCEEDING WITH ANY
WORK. ALL WORK TO COMPLY WITH ALL APPLICABLE CODES, STANDARDS AND REGULATIONS. CHECKED : GAS REV:
ACCURACY OF PLUS OR MINUS 1 PERCENT OF RANGE SPAN. DAMPER MD-1 WHEN ROOM TEMPERATURE EXCEEDS 80°F.
MECHANICAL:
2.6. PRESSURE GAUGE 7. ELECTRICAL SPECIFICATION
MECHANICAL SPECIFICATIONS 2.6.1. ASME B40.100, PHOSPHOR BRONZE BOURDON-TUBE TYPE WITH BOTTOM
CONNECTION, LIQUID FILLED CASE TYPE.
7.1. GENERAL
7.1.1. ELECTRICAL INSTALLATION SHALL BE IN ACCORDANCE WITH THE CURRENT
2.6.2. DRAWN STEEL, BRASS ,OR ALUMINUM CASE WITH 421" DIAMETER GLASS EDITION OF THE CANADIAN ELECTRICAL CODE, PROVINCIAL, MUNICIPAL,
1. GENERAL LENS. AND OTHER CODES, RULES, AND REGULATIONS.
1.1. GENERAL PROVISIONS 2.6.3. CONNECTOR: BRASS NPS 41(DN8). 7.1.2. THE CONTRACT SHALL INCLUDE THE FURNISHING OF LABOR, NEW
1.1.1. THE CONTRACTOR SHALL PROVIDE A COMPLETE AND FULLY OPERATIONAL 2.6.4. SCALE: WHITE COATED ALUMINUM WITH PERMANENTLY ETCHED MARKINGS. MATERIAL, EQUIPMENT AND SERVICES NECESSARY AND REASONABLY
MECHANICAL SYSTEM. 2.6.5. RANGE: TWO TIMES OPERATING PRESSURE OR 0 TO 100PSI WITH GRADE A IMPLIED AND/OR INCIDENTAL TO THE COMPLETE INSTALLATION OF THE PS. Engineering Inc
1.1.2. ANY DISCREPANCIES AND OMISSIONS DISCOVERED SHALL BE REPORTED ELECTRICAL WORK AS SHOWN ON THE PLANS AND OR SPECIFIED. SUPPLY
TO THE ENGINEER IMMEDIATELY AND PRIOR TO TENDER CLOSING FOR
ACCURACY PLUS OR MINUS 1 PERCENT OF MIDDLE 50 PERCENT OF SCALE . Mechanical Consulting Engineers
2.6.6. PRESSURE GAUGE FITTINGS TO INCLUDE VALVES NPS 41(DN8) BRASS AND INSTALL ALL DEVICES REQUIRED FOR THE COMPLETE APPROVED
RECERTIFICATION BY ADDENDUM. SYSTEM, OPERATING TO THE COMPLETE SATISFACTION OF THE 200-1815 Rae St. Regina, SK. S4T 2E3
NEEDLE TYPE WITH ROUND KNURLED HANDLE AND SNUBBERS TO ASME
1.1.3. EACH CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR LAYING RESPONSIBLE PROFESSIONAL ENGINEER. Contact: Guy Sander
OUT THEIR WORK AND FOR ANY DAMAGE CAUSED BY IMPROPER B40.5 NPS 41(DN8) EXTENDED STEM BRASS BUSHING WITH CORROSION
RESISTANT POROUS METAL DISK OF MATERIAL SUITABLE FOR SYSTEM
7.1.3. PREPARE AND SUBMIT TO THE PROPER AUTHORITIES ALL NECESSARY Phone : (306) 565-0411
EXECUTION OF THEIR WORK. CONTRACTOR TO CARRY ALL NECESSARY PERMITS AND PAY ALL FEES. PROVIDE RESPONSIBLE PROFESSIONAL
INSURANCE COVERAGE. FLUID AND WORKING PRESSURE. Email : gsander@pseng.ca
ENGINEER A PDF COPY OF ALL ELECTRICAL PERMITS.
1.2. WARRANTY 2.7. SUPPORTS 7.1.4. UPON COMPLETION AND BEFORE FINAL PAYMENT IS MADE, PRESENT TO
1.2.1. THE MECHANICAL CONTRACTOR AS A CONDITION PRECEDENT TO FINAL 2.7.1. MECHANICAL ROOM PIPING SHALL BE SUPPORTED WITH CLEVIS HANGERS
ENGINEER A CERTIFICATE OF APPROVAL FOR ALL ELECTRICAL WORK FROM
PAYMENT AFTER COMPLETION OF THIS WORK SHALL PROVIDE THE OWNER TO PREVENT EXCESSIVE STRESS ON BOILERS AND CIRCULATING PUMPS.
THE INSPECTION DEPARTMENT HAVING JURISDICTION.
WITH A WRITTEN GUARANTEE WARRANTING ALL MATERIALS, LABOUR, AND 2.8. EXPANSION JOINTS 7.1.5. ELECTRICAL INSTALLATION INCLUDING ELECTRICAL EQUIPMENT SUPPLIED,
EQUIPMENT FOR ONE (1) FULL YEAR FROM DATE OF ACCEPTANCE. 2.8.1. INNER HOSE STAINLESS STEEL CORRUGATE, BRAIDED WINE MESH OUTER INSTALLED OR CONNECTED SHALL BE TESTED IN THE PRESENCE OF THE
1.3. WORK, PRODUCTS, AND QUALITY JACKET, LENGTH AS PER MANUFACTURE'S RECOMMENDATION. OWNER ON COMPLETION OF THE WORK.
1.3.1. EQUIPMENT AND MATERIALS TO BE NEW AND FREE FROM DEFECTS AND 2.8.2. THREE FLEXIBLE GROOVE COUPLING PLACED IN CLOSE PROXIMATE TO 7.1.6. THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE AND ASCERTAIN
HAVE DESIGN CHARACTERISTICS AS SPECIFIED. VIBRATION SOURCE FOR VIBRATION ATTENTION RELIEF. THAT ALL WORK INDICATED CAN BE CARRIED OUT WITHOUT ADDITIONAL
1.3.2. ALL WORK AND MATERIALS SHALL BE INSTALLED AS SHOWN AND IN 2.8.3. PIPE ALL DRAIN LINES TO DRAINS. COST TO THE OWNER.
ACCORDANCE WITH THE NATIONAL BUILDING CODE AND ALL LOCAL CODES 2.8.4. PROVIDE GUARDS FOR ALL EXPOSED DRIVES. 7.1.7. THE ELECTRICAL CONTRACTOR SHALL GUARANTEE THE SATISFACTORY
AND BUILDING REGULATIONS. 3. PLUMBING OPERATION OF ALL WORK AND APPARATUS INCLUDED AND INSTALLED
1.3.3. ALL EQUIPMENT SHALL BE C.S.A. APPROVED. 3.1. GENERAL UNDER THIS SECTION OF THE SPECIFICATION FOR A PERIOD OF TWELVE
1.4. FEES AND PERMITS 3.1.1. PROVIDE COMPLETE DOMESTIC WATER, DRAINAGE, AND VENT PIPING (12) CALENDAR MONTHS AFTER THE FINAL ACCEPTANCE OF THE COMPLETE
1.4.1. THE MECHANICAL CONTRACTOR WILL OBTAIN AND PAY FEES FOR ALL SERVING ALL NEW EQUIPMENT. ALL WATER AND SEWER PIPING SHALL BUILDING.
PERMITS NECESSARY FOR COMPLETION OF THIS CONTRACT. EXTEND TO THE EXISTING SITE SERVICES. ENSURE THAT SEWER SERVICES 7.1.8. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE
1.4.2. CONTRACTOR TO FURNISH ALL CERTIFICATES NECESSARY AS EVIDENCE ARE RUN WITH SUFFICIENT SLOPE FOR DRAINAGE WITH ADEQUATE COVER CAUSED THE OWNERS OR THEIR CONTRACTORS BY IMPROPERLY
THAT THE WORK CONFORMS WITH STANDARDS AND REQUIREMENTS OF TO PREVENT FREEZING. CARRYING OUT THIS CONTRACT.
THE AUTHORITIES HAVING JURISDICTION. 3.1.2. PROVIDE VACUUM BREAKERS ON LINES SERVING EQUIPMENT OR FIXTURES 7.1.9. MECHANICAL AND ELECTRICAL CONTRACTORS ARE RESPONSIBLE FOR THE
1.5. TESTING WHERE CONTAMINATION OF DOMESTIC WATER MAY OCCUR. MUTUAL COORDINATION OF ALL ELECTRICAL REQUIREMENTS OF
1.5.1. TEST ALL EQUIPMENT AND MATERIALS WHERE REQUIRED BY THE 3.1.3. INSTALL WATTS SERIES 900 BACKFLOW PREVENTER OR APPROVED EQUAL MECHANICAL EQUIPMENT. COORDINATION IS TO INCLUDE THE
SPECIFICATIONS OR AUTHORITIES HAVING JURISDICTION TO ON ALL POTABLE WATER WHERE BACKFLOW AND CROSS CONNECTION MAY COMMUNICATION OF ALL FINAL ELECTRICAL NAMEPLATE INFORMATION
DEMONSTRATE ITS PROPER OPERATION TO THE OWNER. OCCUR. FROM THE MECHANICAL CONTRACTOR TO THE ELECTRICAL CONTRACTOR,
1.5.2. CARRY OUT ALL HYDRAULIC TESTS PRIOR TO COVERING PIPE IN ANY WAY. 3.1.4. PROVIDE ALL VALVES AS SHOWN ON THE DRAWINGS OR AS REQUIRED BY THE COMMUNICATION OF THE DETAILED CONTROL INFORMATION AS WELL
1.5.2.1. TEST DOMESTIC HOT WATER, DOMESTIC COLD WATER, AND HOT THE AUTHORITIES HAVING JURISDICTION. INSTALL ISOLATION VALVES AT AS ANY ANCILLARY INFORMATION REQUIRED FOR THE FINAL SYSTEMS TO
WATER HEATING PIPING AT 100 PSI PRESSURE FOR A PERIOD OF (2) ALL CONNECTIONS TO EQUIPMENT AND IN ALL BRANCHES. OPERATE AS INTENDED BY THE RESPONSIBLE PROFESSIONAL ENGINEER.
HOURS WITH NO APPRECIABLE PRESSURE DROP. 3.1.5. PLUMBING EQUIPMENT SHALL BE AS SPECIFIED, OR APPROVED EQUAL, ON THE COORDINATION IS TO OCCUR PRIOR TO THE ORDERING OF EQUIPMENT
1.6. MAINTENANCE MANUALS DRAWING M-1. BY EITHER TRADE. NO EXTRA COMPENSATION WILL BE ALLOWED DUE TO
1.6.1. FURNISH THREE (3) SETS OF MAINTENANCE MANUALS WITH INFORMATION 3.1.6. STERILIZE WATER SERVICE WITH CHLORINE AS PER TOWN AND PROVINCIAL FAILURE TO CARRY OUT THIS COORDINATION. REPORT AT ONCE TO THE
OUTLINED BELOW TO THE ENGINEER PRIOR TO FINAL INSPECTION FOR PLUMBING CODE STANDARDS AND PROVIDE A WRITTEN REPORT FLUSH CONSULTANT ANY DEFECT, DISCREPANCY, OMISSION, OR INTERFERENCE
APPROVAL. SYSTEM AND HAVE BACTERIOLOGICAL TESTS COMPLETED AT A AFFECTING THE SATISFACTORY COMPLETION OF WORK.
1.6.2. MAINTENANCE MANUALS SHALL CONTAIN THE FOLLOWING: RECOGNIZED CERTIFIED LABORATORY. 7.1.10. CONDUITS SHALL BE ELECTRIC METALLIC TUBING UNLESS OTHERWISE
3.2. PIPE AND FITTINGS NOTED ON DRAWINGS OR UNLESS PROHIBITED BY REGULATIONS.
1.6.2.1. WARRANTY CERTIFICATE 3.2.1. ALL PIPING SHALL MEET THE REQUIREMENTS OF THE PROVINCIAL CONDUITS IN DIRECT CONTACT WITH EARTH OR IN CONCRETE SHALL BE
1.6.2.2. DESCRIPTION OF ALL SYSTEMS PLUMBING CODE AND NATIONAL BUILDING CODE. PVC OR ABS PIPING IS RIGID PVC. PVC CONDUIT EXPOSED TO THE EXTREMES OF OUTDOOR
1.6.2.3. DESCRIPTION OF COMPONENTS OF EACH PIECE OF EQUIPMENT NOT PERMITTED THROUGH A FIRE SEPARATION. TEMPERATURES SHALL NOT BE USED WITH PRIOR APPROVAL FROM THE
1.6.2.4. DESCRIPTION OF CONTROL SYSTEM 3.2.2. DOMESTIC WATER ABOVE GROUND: TYPE K OR TYPE L, HARD COPPER, 95/5 RESPONSIBLE ENGINEER. CONDUITS SHALL BE CONCEALED UNLESS
1.6.2.5. COMPLETE SET OF DRAWINGS SOLDER JOINTS, WROUGHT COPPER OR BRONZE FITTINGS. OVER 75mm (3"): OTHERWISE NOTED ON THE DRAWINGS. CONDUITS SHALL NOT BE EXPOSED
1.6.2.6. DETAILED MAINTENANCE AND LUBRICATION SCHEDULE GALVANIZED STEEL, SCREWED JOINTS. IN ANY AREA WHERE CONCEALED WORK IS REQUIRED WITHOUT PRIOR
1.6.2.7. OPERATING AND MAINTENANCE INSTRUCTIONS FOR MAJOR 3.2.3. DOMESTIC WATER BELOW GRADE: TYPE K SOFT COPPER, FLARED JOINTS. WRITTEN APPROVAL.
EQUIPMENT OVER 50mm (2"): CAST IRON PIPE, CAST IRON FITTINGS, MECHANICAL 7.1.11. OUTLET, JUNCTION, AND SWITCH BOXES SHALL BE GALVANIZED PRESSED
1.6.2.8. LIST OF EQUIPMENT SUPPLIERS AND MANUFACTURERS JOINTS. STEEL OF SIZE AND TYPE TO SUIT THE REQUIREMENTS OF EACH OUTLET.
1.6.2.9. DATA TO BE ASSEMBLED IN HARD COVER BINDERS 3.2.4. WASTE AND VENT PIPING ABOVE GROUND: TYPE DWV OR HARD DRAWN OUTLET BOXES SHALL BE ACCESSIBLE.
1.6.2.10. IDENTIFY FRONT COVER WITH PROJECT NAME & PROJECT LOCATION DRAINAGE TUBE, CAST BRASS FITTINGS, 50/50 SOLDER JOINTS. CAST IRON 7.1.12. ALL WIRING SHALL BE IN CONDUIT, EXCEPT THAT ARMOURED CABLE MAY
1.6.2.11. LIST OF CONTRACTORS AND CONSULTANTS SOIL PIPE AND FITTINGS, MECHANICAL JOINTS. BE USED IN STUD PARTITIONS AND FOR DROPS TO RECESSED LUMINAIRES
1.6.2.12. PROVIDE INDEX AND INDEX LABELS 3.2.5. WASTE AND VENT PIPING BELOW GRADE: 150mm (6") AND SMALLER, CAST (MAX. 4 LUMINAIRES PER DROP). ARMOURED CABLE DROPS (INCLUDING
1.7. OPERATING INSTRUCTIONS IRON PIPE, CAST IRON FITTINGS, MECHANICAL JOINTS. ANY DAISY CHAIN) SHALL NOT EXCEED 9m IN TOTAL LENGTH.
1.7.1. ARRANGE AND PAY FOR THE SERVICE OF FULLY QUALIFIED PERSONNEL 3.3. VALVES 7.1.13. WIRE AND CABLE SHALL BE COPPER OF STANDARD AWG SIZES WITH 600V
INCLUDING MANUFACTURER'S REPRESENTATIVES TO INSTRUCT THE 3.3.1. VALVES ON COLD, HOT, AND HOT WATER RECIRC WATER PIPING SHALL BE (90 DEGREE C) INSULATION. INSULATION SHALL BE X-LINK POLYETHYLENE
OWNER IN OPERATION AND PREVENTIVE MAINTENANCE OF EACH PIECE OF AS FOLLOWS: UNLESS OTHERWISE NOTED ON DRAWINGS OR PROHIBITED BY
EQUIPMENT AND SYSTEM SUPPLIED AND INSTALLED. 3.3.1.1. GATE VALVES 50mm (2") AND SMALLER: CRANE No. 1320C REGULATIONS. ALUMINUM CONDUCTORS WILL NOT BE ACCEPTED, UNLESS
3.3.1.2. GATE VALVES 65mm (2 1/2") AND LARGER: CRANE No. 465 1/2C OTHERWISE INDICATED. MINIMUM WIRE SIE SHALL BE # 12 AWG.
1.8. SUPPORTS, ANCHORS, AND SLEEVES
1.8.1. INSTALL SUPPORTS OF STRENGTH AND RIGIDITY TO SUIT LOADING 3.3.1.3. GLOBE VALVES 50mm (2") AND SMALLER: CRANE No. 1310
WITHOUT UNDULY STRESSING OF BUILDING. LOCATE ADJACENT TO 3.3.1.4. GLOBE VALVES 65mm (2 1/2") AND LARGER: CRANE No. 351
EQUIPMENT TO PREVENT UNDUE STRESS IN PIPING AND EQUIPMENT. 3.3.1.5. CHECK VALVES 50mm (2") AND SMALLER: CRANE No. 1342
1.8.2. PROVIDE CHROME PLATED FLOOR, CEILING, AND WALL ESCUTCHEONS AS 3.3.1.6. CHECK VALVES 65mm (2 1/2") AND LARGER: CRANE No. 373
REQUIRED FOR PIPING IN FINISHED AREAS. 3.3.1.7. BALL VALVES 6mm (1/4") THRU 50mm (2"): GRINNELL FIG. 1550
1.8.3. SEISMIC RESTRAINTS SHALL BE PROVIDED AS REQUIRED BY LOCAL CODE. 4. INSULATION
WHEN LOCAL CODE HAS NO STANDARDS, SEISMIC RESTRAINTS SHALL BE 4.1. GENERAL
PROVIDED AND INSTALLED PER SMACNA STANDARDS. 4.1.1. ALL INSULATION AND MATERIALS ASSOCIATED WITH INSULATION SHALL
PROFESSIONAL SEAL:
1.9. IDENTIFICATION HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE
1.9.1. THE MECHANICAL CONTRACTOR SHALL SUPPLY AND PERMANENTLY DEVELOPED CLASSIFICATION OF NOT MORE THAN 50.
INSTALL LAMACOIDS TO PROVIDE IDENTIFICATION OF ALL INSTALLED 4.1.2. ALL PIPING INSULATION SHALL BE FIBROUS GLASS WITH K VALUE MAXIMUM
EQUIPMENT LIKE WATER HEATERS, PUMPS, ETC. 0.3 W/m DEGREES CELSIUS AT 24 DEGREES CELSIUS WITH FACTORY
1.9.2. IDENTIFY ALL PIPING BY MEANS OF COLORED, SELF-ADHESIVE LABELS AND APPLIED JACKET - MANSON AK PIPE INSULATION OR APPROVED EQUAL.
DIRECTIONAL ARROWS USING 19mm (3/4") HIGH LETTERING TO MATCH APPLY PAINTABLE PVC JACKET ON ALL EXPOSED PIPING IN FINISHED
EXISTING. AREAS.
1.9.3. LABEL ALL VALVES LARGER THAN 25mm (1"). 4.1.3. INSULATION SCHEDULE:
1.10. RECORD DRAWINGS HOT WATER SUPPLY AND RETURN PIPING - 25mm (1"); DOMESTIC HOT,
1.10.1. THE MECHANICAL CONTRACTOR SHALL KEEP ON SITE EXTRA SETS OF COLD, AND HOT WATER RECIRC PIPING - 25mm (1").
PRINTS AND SPECIFICATIONS ON WHICH ALL CHANGES AND DEVIATIONS 5. HEATING/VENTILATION
FROM THE ORIGINAL DESIGN SHALL BE RECORDED DAILY. THESE CHANGES 5.1. GENERAL
MUST BE NEATLY ADDED TO A CLEAN SET OF DRAWINGS AND GIVEN TO THE 5.1.1. DUCTWORK SHALL BE GALVANIZED STEEL AND LOCK FORMING QUALITY.
OWNERS MARKED "AS-BUILT". ALL DUCTWORK SHALL BE CONSTRUCTED BRACED, CONNECTED, JOINTED,
1.11. EQUIPMENT AND MATERIALS CLEAN-UP AND INSTALLED IN ACCORDANCE WITH THE LATEST ISSUE OF ASHRAE
1.11.1. PIPING, FIXTURES, DUCTS, AND EQUIPMENT SHALL BE THOROUGHLY GUIDE AND DUCT CONSTRUCTION STANDARDS ISSUED BY SMACNA, NFPA
CLEANED OF DIRT, GREASE, ADHESIVE LABELS, AND FOREIGN MATERIALS. 90 AND 90A, PROVINCIAL CODE, AND LOCAL REGULATIONS. INSTALL ALL
SUPPLY, RETURN, AND EXHAUST DUCTS COMPLETE WITH GRILLES AND
2. HOT WATER HEATING SYSTEM DIFFUSERS AS SHOWN ON THE DRAWINGS.
2.1. GENERAL 5.1.2. ALL EQUIPMENT SHALL BE AS SPECIFIED ON DRAWING M-1 OR APPROVED
2.1.1. FURNISH AND INSTALL THE COMPLETE HOT WATER HEATING SYSTEM AS EQUAL.
SHOWN INCLUDING: PIPING, PIPE INSULATION, VALVES, FITTINGS, ETC. 5.1.3. ALL DUCTWORK SHALL BE GALVANIZED STEEL: 28 GAUGE FOR UP TO 305mm
(12") WIDE OR 203mm (8") DIAMETER, 24 GAUGE FOR 330mm (13") TO 760mm 23 08 15
2.2. SUPPLY AND RETURN PIPE MAINS
2.2.1. HOT WATER HEATING PIPING: BLACK STEEL SCHEDULE 40, THREADED (30") WIDE OR 230mm (9") TO 760mm (30") DIAMETER. ALL FITTINGS TO MEET
SCHEDULE 40 FITTINGS, SCREWED JOINTS. GROOVED JOINTS FOR SIZES SMACNA DESIGN STANDARDS.
63mm (2 1/2") AND LARGER. COPPER PIPING: 95/5 SOLDERED JOINTS ALSO 5.1.4. PROVIDE FLEX CONNECTIONS, 6mm (1/4") DURODYNE CONFLEX PVC
ACCEPTABLE. COATED POLYESTER AT INLET AND OUTLETS OF ALL ROOF TOP UNITS AND
2.2.2. INSULATE PIPING AS PER INSULATION SECTION. FAN UNITS.
2.2.3. PROVIDE PIPING EXPANSION COMPENSATION BY MEANS OF EXPANSION 6. CONTROLS
LOOPS AND OFFSETTING PIPES. 6.1. GENERAL
2.2.4. BRANCH TAKE-OFFS OFF HEATING PIPES SHALL BE OFF THE TOP HALF OF 6.1.1. PROVIDE WATER HEATER AQUASTAT CONTROLS TO CONTROL 3-WAY HOT
MAINS. WATER SUPPLY VALVE TO MAINTAIN ADJUSTABLE DOMESTIC WATER
2.3. VALVES TEMPERATURE.
2.3.1. RED AND WHITE, RISING STEM, 125 PSIG RATING. 6.1.2. PROVIDE AS SEPARATE PRICE: AN ADJUSTABLE REVERSE ACTING
2.4. VENTS THERMOSTAT TO OPERATE EXHAUST FAN EF-1 AND OPEN MOTORIZED
DAMPER MD-1 WHEN ROOM TEMPERATURE EXCEEDS 80°F. NO. DESCRIPTION DATE
2.4.1. INSTALL MAID-O-0MIST NO.71 AUTOMATIC VENTS AT ALL HIGH POINTS.
2.5. THERMOMETERS ELECTRICAL SPECIFICATION
2.5.1. LIQUID IN GLASS GAUGE THERMOMETERS TO BE ASHCRAFT INC, MARCH THESE DRAWINGS ARE THE PROPERTY OF THE RESPECTIVE
BELLOFRAM, WEISS INSTRUMENT INC. OR EQUAL. CONSULTANTS AND AS SUCH MAY NOT BE USED OR
2.5.2. THERMOMETER TO BE DIECAST AND ALUMINUM FINISHED IN BAKED REPRODUCED IN ANY MANNER WITHOUT WRITTEN
EPOXING ENAMEL, GLASS FRONT, SPRING SECURED, 9" LONG. PERMISSION.
2.5.3. ADJUSTABLE JOINT WITH FINISH TO MATCH CASE, 180 DEGREE ADJUSTABLE
IN VERTICAL PLANE, 360 DEGREE ADJUSTMENT IN HORIZONTAL PLANE WITH
CLIENT:
LOCKING DEVICE.
2.5.4. TUBE RED OR BLUE READING, MERCURY FILLED WITH MAGNIFYING LENS.
2.5.5. SCALE: SATIN FACED NON REFLECTING ALUMINUM WITH PERMANENTLY
ITCHED MAKINGS.
PLA-MOR PALACE
2.5.6. STEM: BRASS FOR SEPARATE SOCKET OF LENGTH TO SUIT INSTALLATION.
2.5.7. SCALE RANGE 30 TO 240 DEGREE F WITH 2 DEGREE SCALE DIVISION AND
ACCURACY OF PLUS OR MINUS 1 PERCENT OF RANGE SPAN.
PRESSURE GAUGE

PROJECT:

ZAMBONI DOMESTIC WATER


HEATER TANK REPLACEMENT
MOOSE JAW, SASKATCHEWAN

DRAWING TITLE:

MECHANICAL SPECIFICATIONS

PROJECT : 23-295 DRAWING NUMBER:


DATE : AUGUST 2023
SCALE : AS NOTED M-4
DRAWN : SMH
THIS DRAWING IS NOT TO BE SCALED. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND OTHER DATA FROM THE PROJECT AND REPORT ANY DISCREPANCIES TO CONSULTANT TEAM BEFORE PROCEEDING WITH ANY
WORK. ALL WORK TO COMPLY WITH ALL APPLICABLE CODES, STANDARDS AND REGULATIONS. CHECKED : GAS REV: