Professional Documents
Culture Documents
2.EBS1-EPFA76-EBRT-CNPR-1002-D00 Fire Water Demand Report
2.EBS1-EPFA76-EBRT-CNPR-1002-D00 Fire Water Demand Report
EBS1-EPFA76-EBRT-CNPR-1002
2022.12.05
CONTRACT NO: 004-SC-22-EBS
CONTRACTOR: Alyarmuk for General Contract
Co.Ltd.
Date Sign
Code I Information only Submission - Accepted
Rejected – Major Comments – Data Provider to revise and re-submit. Work
Code R should NOT proceed in the affected areas until comments are resolved.
Comments Returned – Data provider to revise and re-submit for the further
Code C
review.
Reason for
Rev. Date Prepared by Reviewed by Checked by Approved by
Issue
S2 Temporary Firefighting Modification
Revision
Rev Date Issued Update / Amendment Details
Description
D00 IFC 4-Dec-22 Issued for Comments
Fire Water Demand Report
Project Number : 004-SC-22-EBS Reporting Date
Project Name: S2 Camp Temporary Firefighting System Modification Rev D00
Document No.: EBS1-EPFA76-EBRT-CNPR-1002
HOLDS NOTES
1 The table is mainly used to check fire water volume and foam volume.
Using the largest Firewater demand, Pump capacity can be selected. Storage facility can then be
2
defined.
Firewater quantity should normally be not less than 210m3/hr ,the total water supply within the refinery
3 should be capable of supplying the maximum folw for a period of not less than four to six hours, as this
design is considered according to 4h.
Foam for surface application system need to consider 30 minutes supply (flashpoint between 37.8℃
4
and 600℃-actual flash point 55℃).
Foam discharge outlet need to consider 1 outlet,and hose stream operating times continuous to 20
5
minutes at a rate of 190L/min.
Foam concentrates are available in 3 percent and 6 percent concentrations,and this foam design uses
6
3 percent .
A 1000 m 3 fire water tank has been built on site, with a water refill level of 9.5m and a mud discharge
7 level of 0.8m. Therefore, the effective fire fighting volume is 903 m 3, which can meet the requirements
of accounting.
3
8 Two of 1 m foam storage tank has been built on site, which can meet the requirements of accounting.
Two of 1 m 3 foam storage tank has been built next to tank area, which can meet the requirements of
9
accounting.
Foam handlines shall not be permitted to be used as the primary means of procetion for fixed-roof
3
10 tanks over 30ft(9m) in diameter or those over 20ft(6.1m) in height,so 500m diesel tank need to install
foam system,please confirm Whether the tank is equipped with a foam generator.
Fire Water Demand Report
Project Number : 004-SC-22-EBS Reporting Date
Project Name: S2 Camp Temporary Firefighting System Modification Rev D00
Document No.: EBS1-EPFA76-EBRT-CNPR-1002
Part 1
Fire Water Tank & Pump Capacity Sizing
Part 2
Foam Base surface application system for Diesel Storage Tank
3
Foam water consumptiont(m ) 21.84
Part 3
System calculation
3
Total Firewater Quantity(m ) 861.84