Assignment
DCC40132 – PROJECT MANAGEMENT AND PRACTICE
LECTURER PROGRAMME DKA
SESSION CLASS DKA4
NAME REG. NO. A
IYLIA INSYIRAH BINTI MOHD KHAIRUL 17DKA20F1018
RIZAL
Upon completion of this course, students should be able to:
CLO1 Apply correctly the fundamental engineering C3, PLO1 DK3 – Engineering Fundamentals
concepts of project management DK4 – Specialist Knowledge
DP1 - Depth of knowledge required
DP4 – Familiarity of Issues
DP5 – Extensive Applicable Codes
CLO3 Perform efficient management of time and A2,
resources in civil engineering field PLO 11 None
QUESTION 1
On 21th August 2021, falling debris has trapped a construction worker at a site in Ara
Damansara as Figure 1. According to a report by the operations commander, a 32-year-old
Bangladeshi excavator operator, was hit by a falling stone wall. The victim is unconscious
and efforts are underway to rescue him with the use of a crane.
- First aid and medical facilities should be made readily available in sites
according to the size of site and number of workers in the site.The employer
must be responsible for this and should ensure the availability of medicines
and first aids in the sites.
b. Identify the FIVE (5) factor were contributed the stone wall fall.
10 marks
(CLO1, C3)
c. Discuss the importance of implantation ISO 9001 in the construction industry base on
the above situation.
15 marks
(CLO3, A2)