RAJESH KUMAR ROY CHOUDHURY

Mobile: +919748383288, E-Mail: rajesh_kroyc@yahoo.com

~ PROJECT MANAGEMENT ~
SYNOPSIS
- Project Planning & Scheduling
 B.E. (Civil), MIE and C.Eng. with 22 years of experience in Oil and
- Surveying Gas Field, Power Plant Construction, EPC water supply projects,
Piling Works, Water & Sewage Pipeline, Building projects & Project
- Site Management
Management.
- Field Engineering  Adept in planning, executing and spearheading construction projects
- Techno-Commercial Operations involving method engineering, development, contracts
administration, resource planning.
- Contract Management  Possess a flair for adopting advance Construction Methodologies in
- Quality compliance to safety and quality standards.
 Comprehensive knowledge of managing projects, with a proven track
- Documentation
record of executing Civil Projects.
- People Management  Thorough knowledge in project management, planning, organizing
-- TTeeaam
m SSuuppeerrvviisssiioonn and technical aspects of including implementation, troubleshooting
and analysis for improvements.
 Outstanding success of swiftly ramping up projects with competent
skills and ensuring on timely completion.

Core Competencies

Project Management: Supervising project activities and handling the complete cycle of the project management entailing
requirement gathering and final execution of projects. Spearheading project activities involving pre-construction design
review and coordination, construction progress and quality control, project completion, startup, testing and acceptance,
etc. Reviewing the project progress on all aspects viz. material submittals, drawings and actual site construction with
senior staff regularly and taking necessary corrective actions required to meet the project schedule.

Site & Construction Management: Supervising overall construction activities of the projects including providing technical
inputs for methodologies of construction & coordination with site engineers. Preparing and reviewing Method
Statements and construction schedule, Work Specific Quality Control Plans. Efficiently ensuring materials received are in
accordance with the quantity & quality.

Contract Management: Review of technical & commercial proposals of project along with handling contract / billing
related formalities, & documentation. Reviewing sub-contractors’ claims related to civil works and preparing
recommendations for claims approval or rejection.

Quality, HSE & Coordination: Developing an integrated management system in order to meet the standard requirements
of various quality & HSE standards. Taking stringent quality & safety measures including preparation / maintenance of
necessary documents to ensure compliance with standards & customer requirements. Implementing effective quality &
HSE standards.

Special Mentions
 Expertise in:
 Oil and Gas Field Civil Works, Gas Power Plant, Piling Works.
 EPC projects of Water supply scheme which includes WTP, Intake well, MBR, OHSR and pipeline with House
connections.
 Different types of pipeline (DI, GRP, RCP and VC) from 100mm to 2000 mm diameter, pump houses and
concrete tanks.
 11kv, 33kv, 66kv, 132kv, 220kv & 400kv Substations / GIS buildings.
 Construction of Villas as a Main Contractor.

Occupational Contour

July’23 – Present: WPIL Limited, India

Growth Path
July’23 –Present: General Manager (Projects)

Projects Handled

 Lump-Sum Contract for Engineering, Procurement, Construction, Testing, Commissioning, Trial Run, Operation &
Maintenance of Various Components of Multi-Village Scheme in Single Package on ‘Turn-Key Job Basis’ including
Trial Run and Operation & Maintenance of the entire Water Supply scheme for 10 years in the following five
projects of MADHYA PRADESH state

1) Nimrani 2 – District Khargone


2) Lower Narmada – District Dhar
3) Mann Dam – District Dhar
4) Bebus Sunar 2 – District Damoh and Chhatarpur
5) Kutne Rajnagar – District Chhatarpur

Projects include Intake Well cum pump house, Water Treatment Plant, MBR, OHSR, IPS, various diameter DI and
HDPE pipeline, house connections and all electromechanical works.

All these projects are under Jal Jeevan Mission (JJM), Central Government, India.

Posted at Head Office, Kolkata, West Bengal.

Mar’06 – June’23: Simplex Infrastructures Limited, India, Qatar and Dubai

Growth Path
Mar’06 –Mar’08: Project Engineer
Apr’08 – Mar’09: Senior Project Engineer
Apr’09 –Mar’12: Deputy Project Manager
Apr’12 –Mar’14: Project Manager
Apr’14-Mar’16: Senior Project Manager
Apr’16-Mar’21: Chief Project Manager
Apr’21-June’23: Deputy General Manager (Projects)

Projects Handled

 Execution of Civil Works and associated works for Puller Pedestal, Chiller, STP, PCW pool, Raw Water Tank,
Pipe Rack, Transformer Foundation, GIS & Surrounding foundation, ETP building and Tanks for 2GW Ingot and
Wafer (Phase 1) project (Solar plant) at Adani SEZ premises in Mundra, Gujarat.

Main Contractor: Mundra Solar Technology Limited, Adani.

 Execution of BCIS Pile Works (Package-1) and Pile Cap works including associated works (Package-2) for
20% scope of works (approx. min 10000 piles) for Green PVC project, Adani (SEZ premises) in Mundra
Petrochem Ltd, Mundra, Gujarat.

Main Contractor: Mundra Petrochem Limited, Adani

Job Profile: Project Head.

 Posted in Registered Office, Kolkata, India in M/s. Simplex Infrastructures Limited


from 1st January 2020 to 3rd November 2022.

Job Profile:
1) Project Coordinator for:
a) Construction of Medical College and Upgradation of District Hospital at Chaibasa, Jharkhand.
b) Construction of Medical College and Upgradation of District Hospital at Koderma, Jharkhand.

2) In- charge of foreign operations to:


(a) Contractually close out of all existing projects in Qatar and Dubai.
(b) Business Development of Qatar and Dubai Branch.

 Transferred to Dubai from Qatar w.e.f 1st July 2018

1) 216 Villas at Amazonia Cluster in Phase-3, Dubai, UAE.


Project commenced on 21st February 2016 and completed on 31st August 2019.
2) 134 Villas at Trixis Cluster in Phase -2, Dubai, UAE.
Project commenced on 30th April 2017 and completed on 30th November 2019

Main Contractor: Simplex Infrastructures Limited, Dubai Branch


Owner: Damac, UAE
Consultant: BH. NS Engineering Consultants
Details of Project: Construction of Villas (Civil & MEP), Handing over of Villas to Owner and also liasoning with
all Government Authorities.

 Umm Al Houl Independent Water and Power Project, Al Wakra, Qatar


Main Contractor: M/s. Samsung C&T Corporation
Owner: Umm Al Houl Power
Consultant: Mott Macdonald.
Capacity: 2520 MW. Awarded on 31st July 2015. Project Commenced on 1st October 2015 and completed
on 30th June 2018.
Details of few structures are given below.

Description:
 Construction of 400 KV GIS, 220 KV and 132 KV GIS buildings of Kahramaa along with
transformer foundations and other buildings such as Transformer building, CCR,
Administration, Electro-chlorination, BSDG, Waste Water Treatment, Air Compressor, Fuel
Gas Shelter, Circulation cooling water Pump house, Turbine Building, workshop Building,
guard house, mosque etc.
 6 numbers of Gas turbine foundations with HRSG foundations along with By-pass stack
foundations and 4 numbers of STG foundations.
 Intake Pump House which is more than 16 mts deep and Seal weir pit
 Fire water, Dimineralised water and Distillate water tank foundations along with Fire water
pump houses.
 Sewage network, Oil waste water line network, storm water network.
 85 km of PVC duct pipe laying
 Road works with Interlock pavements
 Fencing works.

 Third Party Gas Interconnecting Pipeline Project at Ras Laffan Industrial City, Qatar- From July 2014 to June
2015
Client: M/s. Dolphin Energy Ltd
Main Contractor: M/s. Larsen & Toubro Ltd.
Description:
 Excavation, pipe bedding and backfilling of 5000 mt pipeline.
 28 existing utility crossing works with manual excavation, bedding, backfilling along with
precast concrete slab protection
 Construction of various pipe support foundation, valve pits, metering skid and anchor blocks in
existing stations.
 Construction of Asphalt Road, Paving and Gravel filling works.
 All foundation and main pipelines are below water table. Dewatering work is a major activity.

 Export Gas Compression Facilities Upgrade Project at Ras Laffan Industrial City, Qatar (Brown Field & Green Field
Works – Extension of an Existing Gas plant)- From Feb 2013 to March 2015
Client: M/s. Dolphin Energy Ltd and
Main Contractor: M/s. Larsen & Toubro Ltd.
Description:
 Construction of Gas turbine, compressor, HRSG, Lube Oil, Deluge Valve and other
miscellaneous foundation.
 Construction of Main Pipe Rack.
 Construction of Substation and ITR building with all related finishing works (internal and
external)
 Construction of Asphalt Road, Paving and Gravel filling works
 Construction of Cable Trench, Duct banks, GRE and GRV pipeline works.

 Civil and Piping works for Doha North Sewerage Treatment and Associated Works at Umm Salal Ali, Qatar- From Feb
2011 to Jan 2013.
Client: M/s. Ashghal.
Project Management Consultant: M/s. KEO International Consultants.
Developer : M/s. Keppel Seghers Engineering Singapore Pte. Ltd.
Description:
 Di pipes from 100 mm dia to 2000 mm dia
 GRP pipes from 800 mm dia to 2000 mm dia
 RCC pipes from 1000 mm dia to 2000 mm dia
 VC pipes from 100 mm to 300 mm dia.
 Construction of Manholes (Diameter from 0.9 mtr. to 7.0 mtr.), valve chambers, Flow meter
chambers and Inspection chambers with GRP lining and epoxy lining.
 Construction of Embankments and grading works
 Supply of pipes, fittings, valves, gaskets and other accessories are by the Client.

 Civil and Building works for Combined Cycle Gas Power Plant at Qatar Aluminium Plant (Qatalum) in Messaied,
Qatar. Owner is Hydro and Qatar Petroleum - From Feb 2008 to Jan 2011
Client: M/s. Doosan Heavy Industries and Construction Company Ltd.
Capacity: 1350 MW
Description:
 Construction of various buildings with finishing works and plumbing works (ACCR, BSDG,
EDG, 400 KV GIS, Water Treatment, Waste Water Treatment, H2, N2, Air Compressor, Fuel
Oil Pump House, Miscellaneous water Pump house, Turbine Building, workshop Building, etc.).
 7 numbers of transformer foundations with fire walls.
 4 numbers of Gas turbine foundations with HRSG foundations and 2 numbers STG foundations.
 Cooling water basin along with pump house
 Fire water and potable water tank foundations.
 Turbine building roof sheeting and wall cladding works (Sandwich Panels)
 Sewage network, Oil waste water line network, storm water network (RCC pipe of diameter
1400 mm to 800 mm and UPVC pipe of diameter 700 mm to 100 mm) with manholes, catch pits
and gully pots.
 Road works with Interlock pavements
 Landscaping work with irrigation network.
 Chain Link Fencing works.
 Construction of overall Infrastructure and Utilities Facilities in Support Facilities Areas for Qatar Petroleum at Dukhan,
Qatar- From March 2006 to Jan 2008
Client: Qatar Petroleum
Description:
 10 numbers of Sub-substation buildings (Range from 66 KV to 11 KV).
 20 km of potable water (D.I. pipe), sewage (Vitreous clay pipe) and fire water (D.I pipe) pipeline
network, 8 km of storm water network (RCC pipe) with soak ways and road gullies. One
number of potable water pump house, two numbers of Fire water pump house, three numbers
of sewage pump house.
 One number of potable water RCC tank.
 Two numbers of Glass Fused steel tank (Fire Water tank).
 22 km of road works with 14 km of pavement works, 25 km of fencing work, fixing of 254
numbers of Lighting Poles and 2 numbers of storm water outfalls.
 Plumbing and Irrigation works.

Significant Attainments

 Awarded Appreciation Certificate from M/s. Umm Al Houl Power


 The Doha North Sewerage Treatment pipeline project originally was awarded for QR 23.00 Million. But due to our
good performance, client subsequently increased our scope by offloading from other sub contractors and finally the
project closed at QR 78.00 Million.
 Awarded Appreciation Certificate by M/s. Dolphin Energy for completing project in time maintaining good quality &
HSE standards.

Jan’03 – Feb’06: Electrosteel Castings Limited, India

Growth Path
Jan’03 – Mar’04: Project Executive
Apr’04 – Feb’06: Senior Project Executive

Projects Handled

 Supply, Laying and Hydro Testing of 180 km of Potable Water DI Pipeline (Diameter from 100 mm to 600 mm) along
with construction of thrust blocks, valve chambers, 2 pump houses and one storage tank at Ranchi, Jharkhand.

 Supply, Laying and hydro testing of Potable water DI pipes (Testing Pressure is 18 bar) along with construction of
thrust blocks and valve chambers at Mangalore. Client is KUIDFC. Consultant is M/s. Binny Black and Veatech.

 Supply, Laying and testing of Water supply and Underground drainage works in Anjanapura area at Bangalore. The
project was under Bangalore Development Authority and Bangalore Water Supply and Sewarage Board.

Career Commencement

Oct’01 – Dec’02: SYConE Inc., Bangalore, India


Site Engineer

 Construction of 1000 rooms Men’s New Hostel Complex in Indian Institute of Science, Bangalore.
Academic Credentials

 Member of Institution of Engineers (India) and Chartered Engineer (India)


 Bachelor of Engineering (Civil) from M.S. Ramaiah Institute of Technology, Bangalore (1997-2001)
 Class 12th from Hooghly Mohsin College, West Bengal in 1996.
 Class 10th from Don Bosco School, West Bengal in 1994.

Certificate Trainings

 Working at Height.
 First-Aid.
 Scaffolding Supervisor.

Technical Know-How

Well versed with MS Office & Internet Applications and having knowledge about Primavera.

Personal Snippets

Date of Birth: 29th August, 1978


Nationality: Indian
Passport Status: T6715397 valid up to 30th October 2029
Marital Status: Married
No. of Dependants: Two (Wife and Son)
Driving License Details: Having valid Indian Driving License
Languages: English, Bengali and Hindi
Permanent Address: Flat No= A-407, Siddha Pines, Rajarhat Main Road, Rajarhat, Gopalpur, Opposite
Derozio College, Kolkata- 700136, West Bengal, India.
WhatsApp No: +91 9748383288.

You might also like