Submittal For Approval Of Materials

Date: 23 Aug. 2021


Request no: MAT-CSCEC-05-EL-LC-0019-00
Project No. & Title: E18066-0200S - The Central Business District of the New Administrative Capital of Egypt

Employer: Engineer: Contractor:

1. Material description (one item only on this form) :


INTEGARTED AUDIOVISUAL SYSTEM(without Sample)

Area of application : C04


Drawing ref. : B.O.Q. ref. no.: 274100 & 274116.21
Specification Ref. :
SECTION 274100-GENERAL CONDITION FOR
INTEGRATED AUDIOVISUAL SYSTEM
SECTION 274116.21 - INTEGRATED AUDIOVISUAL
SYSTEMS AND EQUIPMENT - FOR FM MEETING
ROOMS Standards: CE , ISO , SPEC.
Attach all relevant technical literature marked to identify relevant description, current Test Certificates, samples as appropriate.

2. Manufacturer / supplier
Company Name : AUDIO
Address : 95 A,EI-Merghany St,Heliopolis,Cario,11341 Egypt
Local agent : AUDIO

3. Delivery :
Country of origin : USA/Germany/Switzerland/Japan
Availability
Locally Manufactured Overseas

Delivery : Ex-works/ total duration [ ] [ ]


Estimated time of arrival on site [ 20 Aug. 2021]

Program : Date material required on site [ 20 Aug. 2021]


Latest date for order [ ]

We certify that the above submitted items have been reviewed in detail and are correct and in strict conformity with the contract drawings and specifications
except as otherwise stated; also that the material sources indicated above have been reviewed in detail and that they will supply the submitted items in conformity
with the above and deliver same timely.

Submitted by : Lin Xiangjun Signature:


蔺向军

4. Engineer's Representative comments: Approved


Approved as noted
Refer to attached comments sheet. Revise and
Christine Fadel resubmit
23/08/2021 Rejected
Sample required
Tests required
Additional
information
required
Manufacturer's
Signature: Khaled Belal Date: 24.08.2021 guarantee
required
Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents.
AM-1

S-PRC-SS-02(F26) Rev 2
CENTRAL BUSINESS DISTRICT – NEW ADMINISTRATIVE CAPITAL

Project Central Business District - New Administrative Capital


Submittal Number MAT-CSCEC-05-EL-LC-0019
Subject GENERAL CONDITION FOR INTEGRATED AUDIOVISUAL
SYSTEM
Manufacturer PHILIPS – EXTRON
Supplier Audio
Revision 00
Specs Ref. 24100
Code B

1- This material submittal has been reviewed based on general material submittal ref. MAT-
CSCEC-00-EL-LC-0263.
2- The contractor is responsible to provide all accessories, tools and all needed equipment that
may be essential for proper operation.
3- Installation details shall be submitted with the shop drawing including (Mounting method,
height, power requirements,…,etc).
4- Testing and commissioning procedure document as well as training document shall be
submitted in later stage.
5- Warranty certificate shall be signed and stamped by the main contractor, system supplier and
manufacture and to be complied with the general warranty conditions of the project.
6- Main Contractor shall coordinate to provide the required power feeding for all submitted
materials.
7- Sample of AV box integrated with the floor box is still required.

The Engineer Signature


Yasser Adel
Christine Fadel

Page 1 of 1