Professional Documents
Culture Documents
03 Product Costing Configuration
03 Product Costing Configuration
03 Product Costing Configuration
KS01 KSH1
Cost Center CC_NO CC_GROUP
Production 1000 1000
Production Support 2000 2000
Quality Control 3000 3000
Research & Development 4000
Packing Department
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Cost Center
Production
Production Quality Packing
Support
Machine
Quality
Labour Machine Setup & Packing
Control
Calibration
KL01 KA06
Cost
Secondary Cost Elements Activity
Elements
Labour 43000 943000
machine 43001 943001
Machine Setup & Calibration 43002 943002
Quality Control 43004 943004
Research & Development 941000
Packing 43005 943005
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Production Cost
Center
Month End Activities
Work Center
Machine Setup & Calibration
Quality Control
Labour Machine
Research & Development
Packing
Raw Material
RM-1000 5
RM-2000 8
Labour 3
Machine 4
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Standard Costing
Variant
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Costing Type :
material ,
activites,
sub contract material ,
external operation and
which costing sheed to be used for overhead calculation.
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Date Controls:
Quanity Structur Date: This field deterimines which date BOM & ROUTING need to be selected
for cost estimate .
Valuation Date : This field deterimined which date prices to be selected for MATERIAL i.e
Components and activities mention in routing for cost estimate.
Quantity Structure Control: it specifies which BOM & ROUTING to be selected for cost estimate.
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Transfer Control : it Controls how the exisitg cost estimate to be used in cositng other product cost
estimate.
Example: we have two semi finished product X, Y . It already released the cost estiamte. At later point of
time we are using Product X to manufacture a new product called “Z”.
While doing cost estimate for the Product “Z” if we don’t specify the Transfer Controls then systme will
do the costing again for the Product X as well .
To avoid the cositng for already costed material , we have to use TRANSFER CONTROL .
It will transfer the existing cost estiamte to the new product as it is without costing it again during NEW
PRODUCT Cost Estimate.
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
End-User Activities:
Costing Steps:
1. Execute Cost estimate – CK11N / CK40N
This step do the required calculation and save the cost estimate in below tables
We have one cost estimate for one period. Here period means month
If we want to release the second cost estimate for the same period then we have to
reorganize (TCODE: CKR1) the release cost estimate, without reorganize (delete)
releasing another cost estimate for the same period is not possible.
When we release the cost estimate it will move the price from future to Current Price in
“Costing Tab 2”. It will become the active price for the product.
If price is different then the price already exists in material as current then system will
do the revaluation of the inventory if inventory available and post the entries in FI for
revaluation as well.
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Steps:
1. Define Calculation Bases
2. Define Overhead Keys
3. Define Overhead Groups
4. Define Percentage Overhead Rates
5. Define Credits
6. Define Costing Sheets
7. Update Material Master – MM02
8. Update Costing Variant OKKN
Base =
Name =
Cost Elements
400000 – RM Consumption
943000
943001
Overhead Keys =
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Valuation Area =
Overhead Group =
Overhead Key =
Overhead Rate
Name =
Dependency =
Click on Save
5. Define Credits
Credit =
Name =
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Click on Save
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Template Allocation
Machine Setup 1
Machine Calibration 3
Machine Setup Before starting production, machine setup is required. It will take 1 hour time for this task
Machine Calibration Calibration is required for every 200 units, it will take 45 minutes for each calibration
Analysis:
Machine Setup is a fixed cost irrespective of the production lot size it is required.
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Setup &
Calibration
Plan Actual
Template = MFG1200
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Click on Save
Template = SETUP_CAL
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
13000 /
Total time for 1000 lot size 72.22
180
OrderYieldConfirmed
* TotalOfBomItems(
FlexibleFunction = '$2' )
/ 60
/ OrderTotalQuantity
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Template = Quality
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Packing:
Actual packing cost should be calculated only when production order is fully delivered .
Packing
Plan Actual
Floor( OrderTotalQuantity
/ ( 10
/ MaterialNetWeight
) )
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes
Valid To =
Click on Save
Valid To =
Click on Save
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing
Template = Quality
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing
Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing
FG-2000
FG-1000
Trainer : M .Rashid