03 Product Costing Configuration

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

sap.rashid@yahoo.

com Product Costing Notes

Cost Center Planning

2 % overhead charged to product on Raw


material and Activity Cost

Research & Providing Machine Setup and Calibration.


Development
1. Machine Setup requires 1 Hour
2. Machine Calibration required for every 200
units, it requires 45 minutes to do calibration

Packing Production Production


Support

Separate Packing is required based on the


dangerous profile.
Quality
Packing prices determined by packing
Control
department are applied to products

If Final product is dangerous then 2 minutes required


for inspection of BOM Components else NO QC

1. Create Cost Centers: KS01

KS01 KSH1
Cost Center CC_NO CC_GROUP
Production 1000 1000
Production Support 2000 2000
Quality Control 3000 3000
Research & Development 4000
Packing Department

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

2. Create Secondary Cost Elements and Activity

Cost Center

Production
Production Quality Packing
Support

Machine
Quality
Labour Machine Setup & Packing
Control
Calibration

KL01 KA06
Cost
Secondary Cost Elements Activity
Elements
Labour 43000 943000
machine 43001 943001
Machine Setup & Calibration 43002 943002
Quality Control 43004 943004
Research & Development 941000
Packing 43005 943005

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

3. Create GL Accounts & Cost Elements

GL Accounts & Cost Elements FS00 KAH1


Depreciation 400700 400700
Power 400701 400701
Repairs & Maintenance 400703 400703
Salaries 400704 400704
Staff Welfare Expenses 400705 400705
Travelling Expenses 400706 400706
medical Expenses 400707 400707

4. Cost Center Planning

Total Planned Costs (KP06)


𝑃𝑙𝑎𝑛𝑛𝑒𝑑 𝐴𝑐𝑡𝑖𝑣𝑖𝑡𝑦 𝑃𝑟𝑖𝑐𝑒(𝐾𝑆𝑃𝐼) =
Total Planned Activity (KP26)

 For planning using average price


 For actual using Periodic Price

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

5. Create Work Center – CR01

Production Cost
Center
Month End Activities

Work Center
Machine Setup & Calibration

Quality Control
Labour Machine
Research & Development

Packing

Production Team Should Confirm this operation from CO11N

6. Create Bill of Material – CS01

Raw Material
RM-1000 5
RM-2000 8

7. Create Routing – CA01

Labour 3
Machine 4

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

8. Define Cost Component Structure OKTZ


SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for
Material Costing-->Define Cost Component Structure

10 Raw Material 400000


20 Labour 943000
30 Machine 943001

40 Research & Development 941000

50 Setup & Calibration 943002


60 Quality Check 943004
70 Packing 943005

**** Activate Cost Component Structure

9. Define Costing Variant – OKTZ

Standard Costing
Variant

PPC1 – (CO11N / PPP1 – Production PPP2 – Production


CK40N) Order Planned Cost Order Actual Cost

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

Costing Type :

 It specifies purpose of the costing.

 Controls whether to update or not material master

 If master master is updated , which field need to be updated

Valuation Variant: It specifies the sequence of price search strategy for

 material ,
 activites,
 sub contract material ,
 external operation and
 which costing sheed to be used for overhead calculation.

********We need to create cositng variant for plant

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

Date Controls:

 Costing Date From / To is for validity of the Cost Estimate

 Quanity Structur Date: This field deterimines which date BOM & ROUTING need to be selected
for cost estimate .

 Valuation Date : This field deterimined which date prices to be selected for MATERIAL i.e
Components and activities mention in routing for cost estimate.

Quantity Structure Control: it specifies which BOM & ROUTING to be selected for cost estimate.

Click on Course Link:

SAP FICO Product Cost by Order Simplified for Beginner

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

Transfer Control : it Controls how the exisitg cost estimate to be used in cositng other product cost
estimate.

Example: we have two semi finished product X, Y . It already released the cost estiamte. At later point of
time we are using Product X to manufacture a new product called “Z”.

While doing cost estimate for the Product “Z” if we don’t specify the Transfer Controls then systme will
do the costing again for the Product X as well .

To avoid the cositng for already costed material , we have to use TRANSFER CONTROL .

It will transfer the existing cost estiamte to the new product as it is without costing it again during NEW
PRODUCT Cost Estimate.

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

End-User Activities:

Costing Steps:
1. Execute Cost estimate – CK11N / CK40N

This step do the required calculation and save the cost estimate in below tables

KEKO - Product Costing - Header Data.


KEPH - Product Costing: Cost Components for Cost of Goods Mfd.
CKIS - Items Unit Costing/Itemization Product Costing.

2. Marking Cost Estimate – CK24 / CK40N

we can do marking “n” number of times


when we do the marking it will update the material master in “Costing Tab 2 ” as future Cost

3. Releasing Cost Estimate – CK24 / CK40N

 We have one cost estimate for one period. Here period means month

 If we want to release the second cost estimate for the same period then we have to
reorganize (TCODE: CKR1) the release cost estimate, without reorganize (delete)
releasing another cost estimate for the same period is not possible.

 When we release the cost estimate it will move the price from future to Current Price in
“Costing Tab 2”. It will become the active price for the product.

 If price is different then the price already exists in material as current then system will
do the revaluation of the inventory if inventory available and post the entries in FI for
revaluation as well.

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

Click on Course Link:

SAP FICO Product Cost by Order Simplified for Beginner

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

Costing Sheet Configuration

Steps:
1. Define Calculation Bases
2. Define Overhead Keys
3. Define Overhead Groups
4. Define Percentage Overhead Rates
5. Define Credits
6. Define Costing Sheets
7. Update Material Master – MM02
8. Update Costing Variant OKKN

1. Define Calculation Bases

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Overhead-->Costing Sheet: Components-->Define Calculation Bases

Click on “New Entries”

Base =

Name =

Select base and click on “Details”

Controlling Area = Press Enter

Click on “New Entries”

Cost Elements

400000 – RM Consumption

943000

943001

2. Define Overhead Keys

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Overhead-->Define Overhead Keys

Click on “New Entries”

Overhead Keys =

Description = Click on Save

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

3. Define Overhead Groups

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Overhead-->Define Overhead Groups

Click on “New Entries”

Valuation Area =

Overhead Group =

Overhead Key =

Description = Click on Save

4. Define Percentage Overhead Rates

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Overhead-->Costing Sheet: Components-->Define Percentage Overhead Rates

Click on “New Entries”

Overhead Rate

Name =

Dependency =

Select “Overhead Key “ and click on details

Click on “New Entries”

01.01.2021 31.12.2021 1200 1 2%


01.01.2021 31.12.2021 1200 2 2%

Click on Save

5. Define Credits

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Overhead-->Costing Sheet: Components-->Define Credits

Click on “New Entries”

Credit =

Name =

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

Select the line and click on “details “

Controlling Area = Press Enter

Valid to Cost Element OrgGrp Fxd % Cost Center


31.12.9999 *

Click on Save

6. Define Costing Sheets

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Overhead-->Define Costing Sheets

7. Update Material Master – MM02

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

8. Update Costing Variant - OKKN

9. Simulate Cost Estimate - CK11N

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

Template Allocation

Machine Setup & Calibration:

Machine Setup 1
Machine Calibration 3

Machine Setup Before starting production, machine setup is required. It will take 1 hour time for this task

Machine Calibration Calibration is required for every 200 units, it will take 45 minutes for each calibration

Analysis:

Machine Setup is a fixed cost irrespective of the production lot size it is required.

Machine Calibration Calculations:

Lot Size 1000


Less: First 200 units 200
Balance Units 800
No of Calibrations 800/200
4
units

Time for each Calibration 45 Minutes

Total Time for 4 Calibrations -


180 Minutes
4*45

Time in Hours 180 / 60 3 Hours

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

Sap Template Formula

Setup &
Calibration

Plan Actual

Cost Estimate Production Order


Plan Cost

1. Create Main Template CPT1

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Templates-->Maintain Templates

Double Click on “Create Template”

Controlling Area = 1200 Press Enter

Template = MFG1200

Environment = 001 Press Enter

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

2. Assign Templates - KTPF

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Templates-->Assign Templates

Click on Create “New Entries”

Controlling Area 1200


Costing Sheet U00000
OH Key
Environment 001
Template MFG1200

Click on Save

3. Create Template for Setup & Calibration CPT1

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Templates-->Maintain Templates

Double Click on “Create Template”

Controlling Area = 1200 Press Enter

Template = SETUP_CAL

Environment = 001 Press Enter

4. Assign Template in Main Template CPT2

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Templates-->Maintain Templates

Double Click on “Create Template”

Controlling Area = Press Enter

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

Cost Estimate Simulation:

Quality Control for Components:

Dangerous Goods Time required for Quality Check is 20 Seconds

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

BOM Components for 1000 lot size

Bom Items Qty


RM-1000 5
RM-2000 8
Total Component Qty for 1 FG A 13
Costing lot size B 1000
A*B 13000

No of Components checked per hour

QC Time for components 20 Seconds


For 1 Minutes 60 / 20 3 Components
For 1 Hours 60*3 180 Components

13000 /
Total time for 1000 lot size 72.22
180

OrderYieldConfirmed
* TotalOfBomItems(
FlexibleFunction = '$2' )
/ 60
/ OrderTotalQuantity

TotalOfBomItems( FlexibleFunction = '$1' )


/ 180

Plan time formula = Total of bom items/180


/
Actual time formula = OrderYiedConfirmed ∗

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

1. Create Template for Setup & Calibration CPT1

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Templates-->Maintain Templates

Double Click on “Create Template”

Controlling Area = 1200 Press Enter

Template = Quality

Environment = 001 Press Enter

2. Assign Template in Main Template CPT2

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Templates-->Maintain Templates

Double Click on “Create Template”

3. Simulate Cost Estimate – CK11N

Click on Course Link:

SAP FICO Product Cost by Order Simplified for Beginner

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

Packing:
Actual packing cost should be calculated only when production order is fully delivered .

Packing

Plan Actual

Cost Estimate Production Order Plan


Cost Floor( OrderTotalQuantity
/ ( 10
/ MaterialNetWeight
) )

Floor( OrderTotalQuantity
/ ( 10
/ MaterialNetWeight
) )

OrderShipped checks the Production Order Status equal to “ DLV “ or not.

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing Notes

1. Create Business Process – CP01

Business Process = BP120001 Click on “Organization” Tab

Valid From = Plant =

Valid To =

Name = Normal Packing Click on “Allocation” Tab

Description = Unit of measurement = HR

Person Responsible = Allocation category =

Hierarchy Area = Allocation cost elem =

Act. price indicator =

Click on Save

2. Create Business Process – CP01

Business Process = BP120002 Click on “Organization” Tab

Valid From = Plant =

Valid To =

Name = Dangerous Packing Click on “Allocation” Tab

Description = Unit of measurement = HR

Person Responsible = Allocation category =

Hierarchy Area = Allocation cost elem =

Act. price indicator =

Click on Save

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing

3. Maintain Plan Price for the Business Process – CP26

4. Create Template for Setup & Calibration CPT1

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Templates-->Maintain Templates

Double Click on “Create Template”

Controlling Area = 1200 Press Enter

Template = Quality

Environment = 001 Press Enter

5. Assign Template in Main Template CPT2

SAP IMG-->Controlling-->Product Cost Controlling-->Product Cost Planning-->Basic Settings for Material


Costing-->Templates-->Maintain Templates

Double Click on “Create Template”

6. Execute Standard Cost Estimate – CK11N

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing

7. Mark the Standard Cost Estimate – CK24

8. Release the Standard Cost Estimate – CK24

Trainer : M .Rashid
sap.rashid@yahoo.com Product Costing

FG-2000

1. Update Material Master MM01


a. DG Profile
b. Net Weight
c. Overhead Group
2. Create BOM CS01
3. Create Routing CA01
4. Execute Standard Cost Estimate CK11N
5. Mark / Release CK24

FG-1000

1. Delete / Reorganize standard Cost estimate CKR1


2. Execute Standard Cost Estimate CK11N
3. Mark / Release CK24

Trainer : M .Rashid