Professional Documents
Culture Documents
E-01 - Chief Engineer Handover
E-01 - Chief Engineer Handover
THIS IS TO DECLARE THAT THE RESPONSIBILITY FOR THE MACHINERY OF THE VESSEL WAS HANDED OVER
AS SHOWN AND STATED IN THE BOX BELOW:
BOTH, THE LEAVING CHIEF ENGINEER AND THE TAKING OVER CHIEF ENGINEER DECLARE, THAT:
-THE MACHINERY OF THE SHIP WAS INSPICTED TOGETHER WITH THE LEAVING CHIEF ENGINEER AND THAT
THE ENTIRE ENGINE PLANT IS IN GOOD OPERATIONAL ORDER.
-ALL INSTRUCTIONS FROM THE VESSEL’S CHARTERERS /OWNERS/ MANAGERS HAVE BEEN DISCUSSED.
-PROPER INFORMATION ABT. EXPECTED BUNKER OPERATIONS AND THE HANDLING OF THE BUNKERING
SYSTEM HAS BEEN GIVEN AND EXPLAINED TO THE NEW CHIEF ENGINEER
-NECESSARY WORKS AS PER MAINTENANCE SCHEDULE HAVE BEEN DISCUSSED
-PROPER BRIEFING ON THE COMPANY’S SAFETY MANAGEMENT SYSTEM INCL. ALL RELEVANT POLICIES HAS
BEEN DONE AND THAT THE NEW CHIEF ENG. IS ADEQUATELY FAMILIARISED WITH THE RELEVANT
PROCEDURES
-THE LOCATION OF THE MOST IMPORTANT MANUALS AND PLANS HAS BEEN MADE KNOWN
-THE QUANTITIES OF THE FUEL OIL , DIESEL OIL AND LUBRICATING OIL AS SHOWN BELOW ARE CORRECT
AND TAKEN OVER :
REDUCTION GEAR
STERNTUBE
AUX. ENGINES
BILGEWATER SEPARATOR
AIR CONDITION
DOMESTIC COOLING
LUBRICATING OIL SYSTEM
INCL. FILTERS , PUMPS
COOLINGWATER SYSTEM
INCL.
PUMPS , COOLERS etc
BUNKERING SYSTEM
ALARMING SYSTEM
ELECTRICAL SYSTEMS
ANCHOR WINCHES
MOORING WINCHES
SUNDRIES