CONCRETE VOLUMES

AREA (SQ.M) THICKNESS/ LENGTH


C1 F1 1.21 0.25
C2 F2 1.96 0.25
FOOTING C1 F3 2.42 0.275
C1 F4 1 0.25
C2 F1 1.21 0.25

C1 F1 0.08 6.4
C2 F2 0.125 6.4
COLUMN C1 F3 0.08 6.4
C1 F4 0.08 6.4
C2 F1 0.125 6.4

B1 0.08 0.125
BEAM
B2 0.06 0.125

90.54 0.25
SLAB ON GRADE

S1 120.32 0.2
SLAB - 2F
S2 92.28 0.2
VOLUME QTY TOTAL VOLUME (CU.M)
MIXTURE CLASS
0.3025 9 2.7225
0.49 2 0.98 A
0.6655 1 0.6655 B
0.25 2 0.5
0.3025 2 0.605
5.473

0.512 9 4.608 FOOTING


0.8 2 1.6
0.512 1 0.512 COLUMN
0.512 2 1.024
0.8 2 1.6 BEAM
9.344
SLAB ON GRADE
0.01 8 0.08
0.0075 5 0.0375 SLAB - 2F
0.1175

22.635 1 22.635
22.635

24.064 1 24.064
18.456 1 18.456
42.52
CONCRETE PORTIONS
CEMENT IN BAG
PROPORTIONS SAND IN CU.M GRAVEL IN CU.M
40 KG 50 KG
124 9 7 0.5 1
1 : 2 1/2 : 5 7.5 6 0.5 1

CEMENT
40 KG 50 KG SAND IN CU.M
49.257 50 BAGS 38.311 39 BAGS 2.7365

84.096 85 BAGS 65.408 66 BAGS 4.672

1.0575 2 BAGS 0.705 1 BAG 0.05875

169.7625 170 BAGS 135.81 136 BAGS 11.3175

318.9 319 BAGS 255.12 256 BAGS 21.26


GRAVEL IN CU.M
5.473

9.344

0.1175

22.635

42.52