GENERAL CHECK
CT DETAILS:
CT RATIO 75/1A
CBCT RATIO 70/1A
INJECTED VALUES
MEASURED VALUES
REF (Secondary Values)
(In terms of Primary Values)
A B C
PH CT
From 1A 1A 1A P-
IA-1: 75.00 IB-1: 75.00 IC-1: 75.01
MEASUR 0˚ -120˚ 120˚ N
EMENT-1
PH CT
From 5A 5A 5A P-
IA-1: 376.6 IB-1: 376.6 IC-1: 377.9
MEASUR 0˚ -120˚ 120˚ N
EMENT-1
CBCT
From
1A N IN: 70.00
MEASUR
EMENT-1
CBCT
From
2A N IN: 140.1
MEASUR
EMENT-1
I>2 Function DT
I>2 Current Set 5.80 A
I>2 Time Delay 40.00 mS
PICKUP TEST
FUNCTION Set Current PICK UP CURRENT (Amp)
(Amp) R Y B RYB
I>2 5.80 5.772 5.784 5.784 5.772
TIMING TEST
Expected Time Actual Operating time (m Sec)
Injected
FUNCTION (Sec) RYB
Current (Amp) R Y B
I>2 8 0.04 61.0 62.3 63.2 60.10
ISEF>1 Function DT
ISEF>1 Direction Non Directional
ISEF>1 Current 60.0 mA
ISEF>1 T. Delay 100.0 mS
PICKUP TEST
PICK UP CURRENT
FUNCTION Set Current
(Amp)
(Amp)
N
Site: KHAPERKHEDA TPS
Page 2 of 8
IN>1 0.06 0.062
TIMING TEST
Expected Time Actual Operating
Injected
FUNCTION (Sec) time (m Sec)
Current (Amp)
N
IN>1 0.2 0.1 111.8
I2>1 Status DT
I2>1 Current Set 100.0 mA
I2>1 Time Delay 10.00 s
I2>2 Status IDMT
I2>2 Current Set 200.0 mA
I2>2 TMS 2.000
PICKUP TEST
PICK UP
FUNCTION Set Current CURRENT
(Amp) (Amp)
I2
I2>1 0.1 0.1
TIMING TEST
Expected Time Actual Operating
Injected
FUNCTION (Sec) time (Sec)
Current (Amp)
I2
I2>1 0.2 10 10.03
TIMING TEST
Expected Time Actual
Injected Times of (Sec) Operating time
FUNCTION
Current (Amp) I2setting (Sec)
I2
I2>2 0.4 2 times 1.2 1.220
I2>2 0.3 1.5 TIMES 1.6 1.548
PROLONGED
1.5
START 6 6.039
I>1 Function DT
I>1 Current Set 1.500 A
I>1 Time Delay 3.000 s
52A CONTACT REMOVED
LOCKED ROTOR
1.5
WITHOUT 52A 3 3.025
Actual Expected
FUNCTION Expected Relays Operated LED Status
Operated Relay’s LED’s
SHORT LED1
CIRCUIT
R1, R2, R3, R8 R1, R2, R3, R8 LED1 Verified Ok
Latch
LED-2
EARTH FAULT R1, R2, R3, R8 R1, R2, R3, R8 LED-2 Verified Ok
Latch
LED-3
NPS STAGE 1 R1, R2, R3, R8 R1, R2, R3, R8 LED-3 Verified Ok
Latch
LED-4
NPS STAGE 2 R1, R2, R3, R8 R1, R2, R3, R8 LED-4 Verified Ok
Latch
PROLONGED LED-5
START
R1, R2, R3, R8 R1, R2, R3, R8 LED-5 Verified Ok
Latch
LOCKED LED-6
ROTOR
R1, R2, R3, R8 R1, R2, R3, R8 LED-6 Verified Ok
Latch
THERMAL R8 R8 LED-7
ALARM
LED-7 Verified Ok
Latch
THERMAL LED-8
TRIP
R1, R2, R3, R8 R1, R2, R3, R8 LED-8 Verified Ok
Latch
FUNCTION LED’s:
Actual
Expected
FUNCTION Operated Expected LED’s Operated LED Status
Relays
Relay’s
FN
START IN FN
--- --- LED1(ORANGE) Verified Ok
PROGRESS LED1(ORANGE)
Non Latch
MODEL NO P242916D6M0600K
SL NO 35223653/12/20
PANEL CE PUMP A
RESULT PASS - RELAY FOUND HEALTHY ON ALL ASPECTS.
REMARKS NO
Witnessed By Tested By
For M/s. KPKD For M/s. Super Spares
1)
2)
Name: Name:
1)Amol Bhalerao. 1) Vivek Padhye
2)Vaibhav Khare