08

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

MRP: from the supplier to the point of production and

It stands for Material Requirement Planning. It’s a Finished Goods Supply chain management from the
solution that helps manufacturers plan what raw point of dispatch from factory to the point of delivery
materials are needed for production. When and how to the customer.
much is needed. MRP is a stand-alone system that Logistics Operations in Supply Chain Network
works with production related features. Knowing Logistics has aided and contributed to enabling
MRP system meaning, you can use this software to global trade. Third Party Logistics Service Providers
ensure the right material is always available, the right both at global levels and local levels form major
quantity, at the right time for production. partners to manage and offer Supply Chain services
ERP: and the second major factor being the Internet and IT
It stands for Enterprise Resource Planning. A technology that helps manage information and data
comprehensive software system or package for ahead of or along with flow of materials and goods.
managing day to day business operations. Thus, ERP Supply Chain Consultants and professionals find it
systems are more suitable for large business and very essential to have knowledge of the operational
enterprises. To distinguish ERP vs MRP the primary field and how things work on the ground. Theoretical
function that ERP manages include: Accounting, models can be effectively deployed only when
Sales, Marketing, Project Management, Logistics, realities on the ground are understood and adapted to.
Supply Chain. ERP systems can automatic business Take an example of DELL which has successfully
operations, synchrony reports on key business implemented its Supply Chain strategy built around
metrics and streamline all business process. the concept of JIT manufacturing and Direct
Marketing. Dell has manufacturing facilities located
Objectives of Material Requirements Planning in Austin-Texas, North Carolina, Miami, Florida that
The primary objective of MRP is to make sure that service US Markets.
materials and components are available when needed One can imagine the complexities involved in
in the production process and that manufacturing designing procurement systems. Dell does not buy
takes place on schedule. Effective inventory raw materials and components and maintains
management and optimization is another goal of inventory. Dell’s vendors use third party service
MRP. While MRP is designed to ensure adequate providers to set up logistics parks and distribution
inventory at the required times, a company can be warehouses close to Dell’s plants and deliver
tempted to hold more inventory than is necessary, materials just in time to the plant against an order for
thereby driving up inventory costs. MRP can also production that is triggers based on an order
improve manufacturing efficiency by using accurate confirmed by the customer on the internet
scheduling to optimize the use of labor and Under procurement logistics, in this case, some
equipment. logistics service providers play a major part in
Logistics - An Integral Component of Supply ensuring smooth operations. Vendors are based out of
Chain Management Europe, Taiwan, China, Singapore, Hong Kong,
Supply Chain Management encompasses, planning, Korea, and Japan, etc.
design, control and implementation of all business
processes related to procurement, manufacturing,
distribution and sales order fulfillment functions of a
business. All these activities involve multiple
networks of vendors and service providers which are
integrated and co-coordinated by the Supply Chain
Experts of the organization to move raw materials
and finished goods from and to all distant locations
across the globe.
Logistics is the backbone on which Supply Chains
are driven. Logistics refers to the management of the
flow of goods and supplies involving information,
data and documentation between two entities or
points. Logistics plays important role in post
procurement function of delivery of raw material

You might also like