The purpose of steam line blowing is to remove pipe slag, weld bead deposits and other foreign
material from the main and reheat steam systems prior to turbine operation. The cleaning is
accomplished by subjecting the piping systems to heating, blowing steam and cooling cycles in
sufficient number and duration until clean steam is obtained.
To ensure that sufficient cleaning forces are applied to the piping, the steam momentum
during the steam blow must be equal to or greater than the steam momentum at normal
maximum load condition. The Cleaning Force Ratio (CFR) is typically used to evaluate if
satisfactory blow conditions are obtained.
PRE STEP # 1 : Separator – SH - main steam line- Temporary pipe - martyr valve - tailpipe to
atmosphere.
PRE STEP # 2 : Separator - main steam line- HPBP – CRH Line – CRH Isolator - martyr valve -
tailpipe to atmosphere.
PROCEDURE
Start the Boiler as per normal working principle
COMPLETION CRITERIA
Clean White Smoke to be observed at the Exhaust of Tail Pipe
NOTE :
CFR < 1.0 AND NO TARGET PLATE IS TO BE USED DURING THIS STEP
First Blow at every Step to be given at much reduced pressure to check the temporary piping
healthiness
MAIN STEP
PROCEDURE
Start the Boiler as per normal working principle
o
Raise the Seaprator Pressure to 80 Ksc ( SH O/L Temp : 370 C)
NOTE :
CFR > 1.0 AND NO TARGET PLATE IS TO BE USED DURING THIS STEP
First Blow at every Step to be given at much reduced pressure to check the temporary piping
healthiness
COMPLETION CRITERIAN
A Target Plate is used to access the impacts of particle during steam Blowing. Steam Blowing
will be declared when
ESV
MSV
ESV
MSV
HP Bypass
RH O/L Hdr
LP Bypass
Open Close Martyr Valve
LPBP V/ v
Steam Blow Line
Temporary Line
Pre Step # 2 : HPBP / CRH Line Steam Blowing
Martyr V/v
Final SH
ESV
MSV
Martyr V/v
MS Line
Final SH
ESV
MSV
HP Bypass
RH O/L Hdr
LP Bypass
Open Close Martyr Valve
Temporary Line
Main Step # 1 : HRH Line Steam Blowing
Martyr V/v
Final SH
ESV
MSV
Martyr V/v
MS Line
Final SH
ESV
MSV
HP Bypass
RH O/L Hdr
LP Bypass
Open Close Martyr Valve
Temporary Line
Main Step # 2 :LPBP Line Steam Blowing
Martyr V/v
Final SH
ESV
MSV
Martyr V/v
MS Line
Final SH
ESV
MSV
HP Bypass
RH O/L Hdr
LP Bypass
Open Close Martyr Valve
Temporary Line
From Separator
To Separator
From Separator
STORAGE TANK
SH D.S.H. No1
FLASH TANK
MIXING PIECE
ZR
WR
TO DRAIN HDR
FLASH TANK
ZR
WR
Condensor
Condensor
Dummy
Temporary Connection
To Station Drain