CVEN30008 Assignment 1 Methodology-1
CVEN30008 Assignment 1 Methodology-1
$$ $ loss
= + =
A health &
safety issue Do I still have
my job?
Students are required to use the example hazards provided with the
case study to identify eight (8) consequential hypothetical risks that
could arise in the planning, or design, or construction of the Eastern
Treatment Plant, Tertiary Upgrade Project.
1 EPA approval is required in stages to Concrete will be exposed to a Large awkward lifts required (key
be defined as the project develops. corrosive environment. (key words words mobile cranes, rigging methods,
(key words fast-track construction). chloride attack on concrete) weather conditions)
2 Community is sensitive to the project Some wide-span structures have Operations labour force &
outcome. (key words community foundations in poor ground construction labour force working on
engagement, project delays, reputation) conditions. (key words ground adjacent sites. (key words managing
improvement techniques) labour relations)
3 Cost budget must be fixed at an early The bio-film in the SEO could Working in confined spaces. (key words
stage of project development. (key jeopardise the discharge quality. (See Worksafe Victoria))
words risk adjusted cost estimates, cost Reference 2 provided)
management)
4 Project must be completed quickly The chlorine disinfection process High rainfall events likely during the
by December 2012. (key words fast-track requires sufficient contact time with construction period. (key words
construction , time management). the effluent (key words management of construction site flood protection)
chlorine contact time)
5 EPA must be convinced to change The project will introduce a large Residential Neighbours (key words EPA
from its initial works instruction chlorine storage requirement. (key noise and EPA dust regulations)
issued to MWC( key words Eastern words, safety in design, HAZOPS process)
Treatment Plant Works Approval submission)
5 Cable Spinning
6 Steelwork Fabrication
1/07/1994
1/03/1993
15/03/1995
14/04/1995
36.8w
111w 1
1
and agree on a work plan working
7 Deck Assembly
15/05/1995
29/12/1995
12/03/1996
123.2w
43.4w
1
1
back from the submission date.
9 Deck Erection, Tsing Yi Approach 15/11/1994 15/11/1995 52.4w 1
•Planning scenario
•Design & approvals scenario
•Construction scenario
Accountant
Community Relations
Manager
Legal Advisor
Risk/Security
Manager
Principal Construction
Designer Contractor
Maintenance Operators
Manager Project
Delivery
Team
Specialist Suppliers & Sub-
Maintenance
Technical contractors
Sub-contractors
Advisors
Responsible Name
Context / Hazard
Corporate Risks
Likelihood (A)
Business Risk
Team
Environmental
Financial
Social
A001 27/3/18 Manual Back MelbUni Student Risk of - Manual 3 ? ? ? ? ? ? ? ?
Handling Injury A inadequate handling
health, safety training
and security of
people, - Standard
property and operating
environment Procedures
- Task Risk
Assessments
- Document Status
1. Introduction and Purpose
2. Executive summary
3. Context of Analysis (organisation, project, stage, key objectives)
4. Methodology used & key stakeholders involved
5. Identified risks: description and existing controls
6. Risk assessment: likelihood & consequence
7. Risk treatments and proposed implementation
8. Findings & recommendations
9. References
Your report can contain narrative, diagrams, charts, tables and photos.
Draft 1
Draft 2
Final Draft
Final for Issue
Your report can contain narrative, diagrams, charts, tables and photos.
Your report can contain narrative, diagrams, charts, tables and photos.