Ceci Report (1) Ree
Ceci Report (1) Ree
Ceci Report (1) Ree
Submitted by
LALHMACHHUANI
BACHELOR OF ENGINEERING
In
Civil Engineering
LD COLLEGE OF ENGINEERING, Ahmedabad
1|Page
[L.D. COLLEGE OF ENGINEERING]
Near Gujarat University, Navrangpura, Ahmedabad:380015
CERTIFICATE
This is to certify that LALHMACHHUANI has carried out the project report
submitted along with the project entitled INDUSTRIAL INTERNSHIP under
my guidance in partial fulfillment for the degree of Bachelor of Engineering in
Civil Engineering 8th Semester of Gujarat Technological University,
Ahmedabad, during the academic year 2023.
Sign: Sign:
Prof. A.G Hansora Prof. Dr.
Internal Guide Head Of Department (Civil)
2|Page
[LD COLLEGE OF ENGINEERING]
Near Gujarat University, Navrangpura , Ahmedabad:380018
DECLARATION
We hereby declare that the Internship / Project report submitted along with the
Internship / Project entitled INDUSTRIAL INTERSHIP under VINOD
CONSTRUCTION submitted in partial fulfillment for the degree of Bachelor of
Engineering in Civil Engineering to Gujarat Technological University,
Ahmedabad, is a Bonafide record of original project work carried out by me
under the supervision of Dr. A.G Hansora and that no part of this report has
been directly copied from any students’ reports or taken from any other source,
without providing due reference.
LALHMACHHUANI
5| P a g e
AA
A
A
5| P a g e
ACKNOWLEDGEMENT
"I am deeply thankful to Vinod Construction for entrusting me with the opportunity to intern with their
esteemed construction team. This experience has been enriching and educational, and I am sincerely
grateful for the chance to contribute to real-world projects under the mentorship of seasoned
professionals.
I extend my heartfelt appreciation to my external mentor, Sir Manan Mavani, whose guidance and
expertise have broadened my understanding of the construction industry. His willingness to share
knowledge and provide feedback has significantly contributed to my personal and professional growth.
I am equally grateful to my internal mentor, Prof. A.G Hansora, for his continuous support and
encouragement throughout my internship. His mentorship has enhanced my technical skills and instilled
Furthermore, I would like to express my gratitude to Gujarat Technological University for fostering an
environment conducive to learning and professional development. The knowledge and skills acquired
during my studies at the university have laid a strong foundation for my internship experience, enabling
mentors, and Gujarat Technological University. This internship has been an invaluable stepping stone in
5| P a g e
ABSTRACT
6|Page
LIST OF FIGURE
FIGURE………………………………………………………………construction equipment
FIGURE 4. 1 Location of site ...........................................................................................10
7|Page
Table of Contents
DECLARATION...................................................................................………………………………i
ACKNOWLEDGEMENT…………………………………………………………………………ii
ABSTRACT......................................................................................................................................iii
LIST OF FIGURE..............................................................................................................................iv
1 ) OVERVIEW OF THE COMPANY................................................................................................1
1.1 COMPANY DETAILS…………………………………………………………………………………………………………2
1.2 INDUSTRY MENTOR..........................................................................................................2
2 ) INTRODUCTION OF COMPANY.................................................................................................3
2.1 ABOUT THE COMPANY....................................................................................................3
3 ) OVERALL INTERNSHIP EXPERIENCE..........................................................................................6
3.1 THE SECTIONS THAT I HAD BEEN WORKING IN...............................................................6
3.2 DURING MY INTERNSHIP PROGRAM, I PAID SPECIAL ATTENTION TO ...........................6
3.3 CHALLENGES FACED WHILE PERFORMING OUT TASKS……………………………………………….7
4 ) OVERVIEW OF SITE...................................................................................................................8
4.1 LOCATION OF SITE ………………………………………………………………………………………………………14
4.2 CONSTRUCTION EQUIPMENTS…………………………………………………………………………………….15
4.3 CONSTRUCTION MATERIALS………………………………………………………………………………………..16
5) CONCLUSION……………………………………………………………………………………………………….……………..22
8|Page
SS1.OVERVIEW OF THE COMPANY
Office address: T-1/2 3rd Floor, Radha Arcade, 100 Feet Rd, near Indira Statue,
Ganesh Colony, Anand, Gujarat 388001
Phone:9909984627
E-mail: vinod.const@gmail.com
Website: https://vinodconstruction.co.in/
9|Page
2. INTRODUCTION OF COMPANY
10 | P a g e
3 OVERALL INTERNSHIP EXPERIENCE
I have been working on the site of the consultant and my role was not only limited
to visit sites and supervising the work practically understand the job but also to
study designs and make it work efficiently.
11 | P a g e
3.3 CHALLENGES FACED WHILE PERFORMING OUT
TASKS
Less Brief idea about the site & it’s working nature.
Communication Barrier
Low or less health safety material.
Climatic change.
Learning site language.
Share our experience with Engineers.
Informing about the safety measurements & site precautions.
Adopt climatic problems of the city.
12 | P a g e
4 OVER VIEW OF SITE
13 | P a g e
4.2 CONSTRUCTION EQUIPMENT
Bar Bending Bar bending is the process of shaping reinforcement bars to fit the design of
concrete structures. It's done using specialized machines to bend the bars
accurately according to construction specifications, improving efficiency and
ensuring structural integrity.
Truck Is a large truck usually with a container on the back of it that is used for
carrying and unloading loose material used in the site.
14 | P a g e
4.3 CONSTRUCTION MATERIALS
Cement
Sand
15 | P a g e
Aggregates
Reinforcement Bars
Bricks
16 | P a g e
4.4 MAJOR WORKS ON OUR SITE
Construction of columns
Construction beams and slabs
Construction of staircase
Masonry
Concrete Pouring: Pouring concrete into the formwork, ensuring it reaches all areas
and is
properly compacted to eliminate air pockets.
Curing: Allowing the concrete to cure and harden properly. This often involves keeping
the
concrete moist and at a consistent temperature for a certain period to ensure proper
strength development.
Stripping: Removing the formwork once the concrete has cured sufficiently,
typically after a few days.
17 | P a g e
4.4.2 CONSTRUCTION OF BEAMS AND SLABS
The construction process for beams and slabs is similar to that of columns
Concrete Pouring: Pouring concrete into the formwork, ensuring it reaches all areas
and is properly compacted to eliminate air pockets. Care is taken to prevent segregation
of concrete and ensure proper bonding with the reinforcement.
Curing: Allowing the concrete to cure and harden properly. This may involve
keeping the concrete moist and at a consistent temperature for a certain period to ensure
proper strength development.
Reinforcement: Install steel reinforcement bars (rebar) within the formwork to add
Pouring concrete: Fill the formwork with concrete, ensuring it's properly mixed and
18 | P a g e
Curing: Allow the concrete to cure and gain strength over time, typically by keeping
Finishing: Once the concrete has cured, remove the formwork and finish the
4.4.4 MASONRY
Masonry work involves
Layout: Mark the structure's layout.
19 | P a g e
CONCLUSION