Download as pdf
Download as pdf
You are on page 1of 50
IREVIGIONS: 2 - WITHDRAWN STANDARDS AS INDICATED. APR 2021 CC ES54A1 A101 Executive Section A - Introduction Customer Service Acknowledgements WITHDRAWN e ui ‘Summary of Revisions WITHDRAWN fas Change-of Address Form WITHDRAWN, ‘Comments Sheet WITHDRAWN e President Message Notice from the Executive Vice President Transmission and Distribution and DESIGNED RECOMMENDED] Camo | Yefe c.crowson [1 stevanovic ROCEPTED Fea FDENNERT [DISTRIBUTION||SSUED: APR 2021 STANDARDS. |REPLACES: MAR 2016 JORIGINALLY @ BCHydro}icsuep- way 2008 INTRODUCTION TABLE OF CONTENTS. PAGE 1 OF 1 ES54 A0-01 [REVISIONS: UPDATED LEGAL ACKNOWLEDGEMENT FORM. FO MAR ‘6 This Legal Acknowledgement Form shall be governed by the laws of the Province of British Columbia and the applicable federal laws of Canada. In the event of conficts or inconsistencies, if any, between or among this Legal Acknowledgement Form and the terms and conditions of the Standard, the provisions set out in this Legal Acknowledgement Form take precedence. Disclaimer The Standard, and all information and referenced standards therein, is provided as a public service by the Brit- ish Columbia Hydro and Power Authority ("BC Hydro"). Material contained within it carries no guarantee of any kind, express or implied. Neither BC Hydro nor the Standard designer, recommender, or acceptor, are accountable for the manner in which the Standard is used, or in the way its content is applied. Persons using the Standard, including retained ‘engineers and contractors, are responsible and assume full responsibilty and liability for its application, includ- ing but not limited to ensuring that the application of its content is appropriate, and that its application does not compromise operably, safety, reliablity or maintainability. ‘The Standards have been prepared for or by BC Hydro to meet specific purposes of BC Hydro. No person. shall use or rely upon the Standard, in whole or in part, in any manner, except: a) for the purpose of providing services to BC Hydro; ) forthe purpose of connecting equipment to BC Hydro equipment; ©) with the prior written consent of BC Hydro, or d) as required by law. Limitation of Liability BC Hydro, its servants or agents, shall not be liable to any person for injury, loss or damage arising out of the use of or reliance upon this Standard, in whole or in part, except for those situations where the person uses the Standards to provide services to BC Hydro to the extent damages are not due to the fault of the person using the Standard, including but not limited to that person’s misapplication of the Standard, negligence, or miscon- duct ‘Any person using these Standards hereby agrees to release and indemnify BC Hydro, its servants or agents, from any injury, loss, damage or claim arising or alleged to be arising from use of or reliance upon the Stan- ddards, in whole or in part, except for those situations where the person directly uses the Standards to provide services to BC Hydro to the extent damages are not due to the fault ofthe person using the Standard, including but not limited to that person's misapplication of the Standard, negligence, or misconduct. Copyright BC Hydro holds all title and rights, including the copyright, in or to the Standard. Copying all or any part of this Standard is permitted provided copies are used in accordance with this Legal Acknowledgement Farm, credit is glven to BC Hydro, and copies ofthe Standard or parts thereof are not sold for profit. The Standard may be stored in any type of electronic retrieval system provided BC Hydro is clearly indicated as the source and pro- vided no profit accrues from such storage. BC Hydro notes that the Standard may be revised from time to time and recommends that any person using the Standard in accordance with this Legal Acknowledgement Form confit itis using the most recent version, BC Hydro is not liable for reliance on past versions of the Standard that may be stored electronically. DESIRED RECOMMENDED) —ASCEPTED NOTICE FROM THE 3GE EXECUTIVE VICE PRESIDENT sacnoun | rotwenr | ofan TRANSMISSION AND DISTRIBUTION (DISTRIBUTION |ISSUED:MAR 2016 AND CUSTOMER SERVICE IR STANDARDS. |REPLACES:MAY 2004 PACE 3 |ES43/53/54/55/65 A1-01.01 4 JORIGINALLY }@ BCHydro}csuED: Nov 1980 REVISIONS: UPDATED LEGAL ACKNOWLEDGEMENT FORM, FO WAR Scope ‘This manual is one of a series containing standards for construction of the BC Hydro electrical distribution plant within the service area of BC Hydro. A new distribution plant shall be designed, constructed, owned, operated, ‘maintained and repaired to these standards. Purpose of Standards BC Hydro objectives require standardization to: a) Ensure uniform safety requirements comply with BC statutes and regulations. b) Provide uniform system reliability. ©) Provide uniform operating practices. 4) Permit economic bulk purchasing of materials. ) Achieve optimum life cycle cost of plant construction, 1) Effect efficient quality assurance, Responsibility The Distribution Standards Department prepares these standards and verifies that specitied plant and proce- ‘dures will perform adequately under all normally expected conditions encountered throughout the province of British Columbia, These standards are approved by Professional Engineers. Itis the responsibilty of BC Hydro Manegers to ensure that the standards are followed unless abnormal conditions are encountered that require Variations. These variations should be kept to a minimum and their performance shall be the responsibilty of the Professional of Record in charge ofthe project, who will cord and seal the variation based on satisfactory ‘qualifications and experience to do so. As per the latest revision of the BC Hydro Distribution Owner's Engi- neer Guide, these variations must be accepted by BC Hydro's Owner's Engineer. Use of Stock Materials The electrical distribution plant covered by these standards is built using stock materials approved by a Profes- sional Engineer as required by law. The use of non-stock materials for special and unusual situations must be approved by Distribution Standards or the BC Hydro Engineer responsible for the project. Revisions to Manual ‘These standards are revised from time to time to improve the safety, performance, workability, cost effective- ness or appearance of the plant. The existing plant bul to previous standards need not be updated unless 50 specifically advised by BC Hydro. When maintenance or other work, such as voltage conversion or conductor change is being done, updating plant to current standards is encouraged. Malling Addresses ‘The manual has been issued to a corporation or firm rather than to an individual. The corporation or firm is responsible for the safekeeping of the manual, and for keeping it current. Changes of address or in number of copies required must be reported promptly. ‘Suggestions for changes in the manual, or required changes of address may be made on the pre-addressed ‘comment sheet included in the Manual and with each issue of revision, EGRET RECOMMENDED]ACCEPTED | ERO WERT NOTICE FROM THE IGE EXECUTIVE VICE PRESIDENT itscin ties Uemee TRANSMISSION AND DISTRIBUTION DISTRIBUTION | 'SSUED:MAR 2016 AND CUSTOMER SERVICE [STANDARDS |REPLACES:MAY 2004 ORIGINALLY [@ BC Hydro) csueD, Nov 1000 Jor 2 PAGE 2 |ES43/53/54/55/65 A1-01.02 Pull/Splice, Service, and Junction Boxes Table of Contents | ES54 B0-01 | et Section B ES54B0 B0-01 B0-02 ES84.B2 82-04 ES54B3 83.01 83-02 83-03 83-04 83-05 83-06 ES54B4 84-01 B4.02 ES54B5 85-01 B5-02 85-03 85-04 ESS54B6 86-01 B6-02 86-03 86-04 ES54B7 87-01 87-02 87-03 Pull/Splice, Service, and Junction Boxes Pull/Splice, Service, and Junction Boxes Table of Contents General Notes 855 Service Box Roadway Duty Lightweight Service Box ‘Small Non-Traffic Duty Large Non-Traffic Duty ‘Small Sidewalk/Lane Duty Large Sidewalk/Lane Duty Rectangular Type 2436 Lane Duty Circular Concrete Service Box 1232 Box Pull/Splice Box Non-Traffic Duty Pull/Splice/Junction Box Sidewalk Duty 832 Box Pull/Splice Box Non-Traffic Duty Pull/Splice/Junction Box Sidewalk Duty Pull/Splice/Junction Box Access Lane Duty Pull/Splice/Service/Junction Box Bottomless 632 Box Pull/Splice Box Non-Traffic Duty Pull/Splice/Service/Junction Box Sidewalk Duty Service/Junction Box Access Lane Duty Service Box Roadway Duty 332 Box Service/Junction Box Sidewalk Duty Service/Junction Box Access Lane Duty Service Box Roadway Duty PullSplice, Service, and Junction | wus zoc21 | STANDARDS Boxes Table of Contents @BCHydro DISTRIBUTION ES54 B0-01 R9 Use only for 19 Wark with or for BO Hydro, See legal disclaimer In ESS4 A 2023-06-27, vo Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at wuw behydro.comiastibutionstahaitt! Of 1 Scope This section covers the installation of medium voltage (primary) splice/junction boxes and low voltage (secondary) service boxes. Underground medium voltage splice boxes are used for duct runs where cable pulling tension or sidewall pressures exceed specification limits. Limiting parameters could be a long cable run, an excessive number of duct bends, sloped terrain, site access, etc. The subject duct run could then be separated into two or more shorter cable sections using splice boxes. Cable sections are spliced together in each splice box. Junction boxes are used for branching and sectionalizing underground circuits. They contain 200 A loadbreak separable insulated connectors (SICs) or a combination of 200 A loadbreak SICs and 600 A deadbreak SICs. Underground secondary service boxes are typically the last structures in the utility power distribution system, facilitating the connection of customer service supply conductors and cables. This section covers the physical size and weight of each structure, design load rating, and construction and installation details. Lifting and Handling Boxes, risers, and collars shall be lifted as per the manufacturer's instructions. All lifting equipment shall be tested and comply with local safety codes and regulations. Confined and Restricted Access Spaces Confined spaces are hazardous for crews to work in and should be avoided if possible. Medium and low voltage service/junction/pull boxes that are part of the confined space inventory include: © 632, 832, 1232 boxes with a depth greater than 1372 mm (54"), regardless of the lid type; © 632 and 555 boxes with manhole lid; and © 332 box with a depth greater than 1524 mm (60°), regardless of the lid type. There is a safe work procedure for 332 boxes with a depth between 1372 mm (54”) and 1524 mm (60°). Contact your OSH specialist for more information. Finished Grade Change The collar and lids are installed flush with the finished grade. Each box shall be installed with a minimum of one and a maximum of two risers, each 150 mm deep, that can be removed to adjust the collar and lid's elevation if needed to accommodate any future finished grade elevation change. Roadway duty boxes with manhole frame and covers shall be installed with one 150 mm precast concrete riser ring. Additional rings may be installed to accommodate finished grade changes, but the total height of all riser rings shall not exceed 750 mm. For details on grade changes see ES54 U1-01. PULL/SPLICE, SERVICE, AND JUNCTION BOXES IREVIGIONS: 9 - REMOVED OFF-ROADWAY DUTY, ADDED 2436 BOX. MAR 2021 CC c-cnowson | stewovic| + oenext DISTRIBUTION|/SSUED: MAR 2021 GENERAL NOTES [STANDARDS [REPLACES NOV 2019 . ORIGINALLY 7 (BBC Hydro}.ssuco, war 2016 mas (OF 5 ES54 B0-02.01 Use only for doing work with ofr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: 9 - REMOVED OFF-ROADWAY DUTY, ADDED 2436 BOX. MAR 2021 CC Secondary Service Boxes Table 1 shows a selection summary of secondary service boxes based upon load duty. Service boxes contain three (for triplex) and four (for quadruplex) 600 V insulated multi-connectors. The multi-connectors allow for branching and splicing of secondary cables. For electrical equipment capacity and box selection criteria, refer to ES53 N3-01 Table 1. Service Box Load Duty and Selection Matrix Load Duty* Splice Box Type Ese Non: ~ latioes Ref. Std.| [ot | Sidewalk | “ono. | Roadway ‘Small lightweight service box (plastic)| 83-01 x Large lightweight service box (pla: B3-02 x ‘Small polymer concrete service box x x ‘clw polymer concrete lid a9 ‘Small polymer concrete service box x x x [clw cast-iron lid Large polymer concrete service box x x /clw polymer concrete lid an Large polymer concrete service box x x x clw castiron lid Lightweight service box, rectangular type 2436 (for maintenance 53-05 x x x replacements only) 332 olw sidewalk duty lids 57-01 x x 332 clw lane duty lids B7-02 x 332 clw manhole cover B7-03 x 632 clw sidewalk duty lids B6-02 x x 632 clw lane duty lids 56-03 x 632 clw manhole cover 36-04 X 555 clw manhole cover B2-04 x * For load duty definitions see S54 U1-02 Roadway duty 332, 632, and 555 boxes with manhole covers may also be used for access lane applications, though this practice is not ideal as it increases operational costs and risks to worker safety. Roadway boxes should only be installed if all other alternatives have first been assessed and deemed impracticable. ‘DESIGNED RECONMVENDED) ACCEPTED | ENGHEERCFRECOR Caen | Yin | > PULL/SPLICE, SERVICE, AND JUNCTION BOXES c.crowson [1 sTEVANOVIC|_F DENNERT DISTRIBUTION] !SSUED: MAR 2021 GENERAL NOTES [STANDARDS beterireamedd a (BCHydro} ssuep: mar 2016 Sete tea ES54 B0-02.02 Use only for doing work with ofr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: 9 - REMOVED OFF-ROADWAY DUTY, ADDED 2436 BOX. MAR 2021 CC Ifa lightweight service box is installed in hilly terrain it can be difficult or impossible to install duct seals into the ducts once cables have been installed. If the meter box entry into a building is more than 1 m below the top of the lightweight service box without riser(s) installed, a 332 service box shall be used instead to allow the installation of effective duct seals. When required, blast-proofing may be installed on service boxes complete with manhole lids. Refer to ES54 U13 for more information on blast-proofing requirements and design. Boxes with lightweight lids of lane duty lids have been designed and tested to be blast-proof. Medium Voltage Splice Boxes Table 2 shows a selection summary for medium voltage splice boxes based upon load duty. For electrical equipment capacity and selection criteria, refer to ES53 813-01. Table 2. Medium Voltage Splice Box Load Duty and Selection Matrix mn Load Duty Splice BoxType | ref. std.| Non-Traffic | Sidewalk access Roadway 632 c/w slab lids B6-01 x 632 c/w sidewalk duty lids B6-02 x x 632 c/w lane duty lids B6-03 x 832 c/w slab lids B5-01 x 832 c/w sidewalk duty lids B5-02 x x 832 c/w lane duty lids B5-03 x 1232 ciw slab lids B4-01 x 1232 c/w sidewalk duty lids| B4-02 x x | 600 A cable systems require regular access for inspection and maintenance, which may preclude the use of slab lids. This limitation applies to 1232 boxes only. Medium Voltage Junction Boxes Table 3 shows a selection summary for medium voltage splice and pull boxes based upon load duty. For electrical equipment capacity and installation details, refer to ES53 Section D. Operational clearance is a critical consideration when determining the placement of junction boxes. Power system workers operate 200 A loadbreak equipment while energized, using a hotstick. Workers shall be able to assume an ergonomic operating position on level footing without any ‘obstructions or tripping hazards. Junction boxes shall be located such that the unobstructed area is. level and free of tripping hazards and other obstructions. ‘DESIGNED RECONMVENDED) ACCEPTED | ENGHEERCFRECOR Caen | Yin | > PULL/SPLICE, SERVICE, AND JUNCTION BOXES c.crowson [1 sTEVANOVIC|_F DENNERT DISTRIBUTION] !SSUED: MAR 2021 GENERAL NOTES [STANDARDS beterireamedd a (BCHydro} ssuep: mar 2016 Sete tea ES54 B0-02.03 Use only for doing work with ofr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: 9 - REMOVED OFF-ROADWAY DUTY, ADDED 2436 BOX. MAR 2021 CC Table 3. Medium Voltage Junction Box Load Duty and Selection Matrix a Load Duty Junction Box Type | pet. std. | Non-Traffic | Sidewalk access Roadway 332 c/w sidewalk duty lids B7-01 x x 332 c/w lane duty lids B7-02 x 632 c/w sidewalk duty lids B6-02 x x 632 c/w lane duty lids B6-03 x 832 c/w sidewalk duty lids B5-02 x x 832 olw lane duty lids 85-03 x 1232 clw sidewalk duty lids B4-02 x x The use of junction boxes and junction pads is functionally equivalent. Junction boxes have advantages in terms of aesthetics, immunity to traffic accidents, low risk of graffiti and vandalism, etc. However, there are situations where junction pads are preferred, specifically: ‘* High-water table areas: If a box is installed in a high-water table area, the box will usually be filled with water. This accelerates galvanic corrosion and makes inspection, maintenance, and operation more difficult and time consuming. In the event of flooding, it may be impossible to access and operate equipment installed in a junction box. ‘* High snowfall areas: Boxes are difficult to locate and access when under snow and ice. ‘* Contaminated sites: Old industrial areas, decommissioned mines, landfills, abandoned petrochemical storage sites (fuel stations), etc. may result in contaminated soil and/or groundwater. Such areas should use junction pads instead of junction boxes to help ensure worker safety and equipment reliability Refer to ESS54 Section D for more information on junction pads. Box Location Roadway placement should be avoided whenever possible. Using non-traffic or access lane duty lids improves worker safety and operational efficiency. Pu \g Irons Splice or pull boxes 632, 832, and 1232 are equipped with threaded TELUS (25 mm diameter) inserts cast in the side walls under the duct window knockouts. 25 mm diameter eyebolts (material number 97002787) should be screwed into the inserts and tightened firmly against the face of the concrete to develop full strength ‘DESIGNED JRECOUMENDED) ACCEPTED | ~ENGHEER OF RECORT Cowen | Ya | PE c.crowson [1 sTEVANOVIC|_F DENNERT PULL/SPLICE, SERVICE, AND JUNCTION BOXES DISTRIBUTION] !SSUED: MAR 2021 GENERAL NOTES [STANDARDS beterireamedd a (BCHydro} ssuep: mar 2016 Sete tea ES54 B0-02.04 Use only for doing work with ofr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: 9 - REMOVED OFF-ROADWAY DUTY, ADDED 2436 BOX. MAR 2021 CC The insert ultimate tested pullout capacity is 65 kN and the 25 mm diameter eyebolt ultimate tensile capacity is 142 KN. Pulling at an angle reduces the eyebolt capacity drastically. Assuming a load safety factor of 1.3, this type of pulling iron is rated for a maximum pulling force of 25 KN. Duct Entry Locations The standards indicate duct entry and alternate duct entry locations for each box type. The abbreviations LV and MV indicate low voltage (120 V to 600 V) and medium voltage (4 kV to 35kV) respectively. For secondary boxes, use only duct entry knockouts or alternate duct entry knockouts to avoid cable crossover. Do not use a combination of both. For junction boxes, both duct entry and alternate duct entry knockouts (where applicable) may be used. Duct entry knockouts are preferred as they allow for more orderly cable training. For splice and pull boxes, duct entry and altemate duct entry knockouts may be used without restriction. Consideration should be given to using the same knockout on both ends of the box so the ducts will be aligned to allow for pull-through cable installation. Cast-in-Place Boxes Cast-in-place boxes are used for maintenance installations over an existing duct bank. Alternatively, bottomless precast boxes may be used. ‘DESIGNED RECONMVENDED) ACCEPTED | ENGHEERCFRECOR Caen | Yin | > PULL/SPLICE, SERVICE, AND JUNCTION BOXES c.crowson [1 sTEVANOVIC|_F DENNERT DISTRIBUTION] !SSUED: MAR 2021 GENERAL NOTES [STANDARDS beterireamedd a (BCHydro} ssuep: mar 2016 root a|06mES ES54 B0-02.05 Use only for doing work with ofr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: R4- REMOVED LIFTING HOLES, BAR AND 200 Mid RISER. ADDED TEXT 8OX PGI. OCT 18 CC ID Number engraved in {grout by the Contractor 1590 1520 a _-@ Y ANT r {aston of Kee Knock outs important: This installation is a confined space DESIGNED RECOMMENDED) ACCEPTED | ~ENGWEER OF RECTORS c.crowson [1 stevanovic|_F DENNERT \DISTRIBUTION||SSUED: OCT 2018 555 SERVICE BOX ROADWAY DUTY er noanne REPLACES. MAR 2016 so ORIGINALLY i (@ BC Hydro} ssueo: sun 1991 Sawa c|ocdea ES54 B2-04.01 Use only for doing work with ofr BC Hydro. Complete Legal Acknowledgement is at www bchydro.comlistibutonstandards IREVIGIONS: R4- REMOVED LIFTING HOLES, BAR AND 200 Mid RISER. ADDED TEXT 8OX PGI. OCT 18 CC Grout all around at 45° Unobstructed ‘Area Finished grade ‘DESIGNED RECOMMENDED) ACCEPTED c.crowson [1 stevanovic|_F DENNERT \DISTRIBUTION||SSUED: OCT 2018 555 SERVICE BOX ROADWAY DUTY STANDARDS. |REPLACES: MAR 2016 JORIGINALLY OBC Hydro} aun sos seer Sea bewanoe Use only for doing work with or fr BC Hydro, Complete Legal Acknowledgement is at wu. bchydro.convlistbutonstandards IREVIGIONS: R4- REMOVED LIFTING HOLES, BAR AND 200 Mid RISER. ADDED TEXT 8OX PGI. OCT 18 CC Notes 4, Depth of cover shall comply with C0-02. Excavation and backfilling shall comply with W1-01 Grounding shall comply with 2-01 Duct entry shall comply with H1-06. For specific application of 555 box refer to ES53 N3-01 eReNn Bill of Material Item | Description ae Quantity | Supplied By 1__| Service box and collar type 555 400-0955 i BC Hydro Tormore 2 | 150 mm riser ring 97000964 BC Hydro (as required) 3_| Heavy duty frame 400-0401 1 BC Hydro 4 [Heavy duty cover clw locknut 400-0411 1 BC Hydro. 5 | 75mm bell ends 401-0183 | Specified by | Contractor OR | 100 mm bell ends 96021454 | Designer | Contractor © | 75mm duct plugs 407-0197 | Specified by | Contractor OR_| 100 mm duct plugs 96021457 | Designer_| Contractor 7 | Grounding kit 412-0022 1 BC Hydro 4" x 8! ground rod 420-1093 1 BC Hydro 8 | Sump cover 400-0426 1 BC Hydro gr | 9%" x 1000 mm col rod, B-12 Dayton a A —— Superior 10° | 9%" coll nut B-13 Dayton Superior NA 2 Contractor 11_[@ x3" 18 TPI SIS security bolt 96005248 2 BC Hydro ‘Items 9 and 10 are optional, specified by Designer Reference Standards S54 00-02 Vaults, General Notes S54 R201 Grounding of URD and UD Subsurface Structures in Public Corridors S54 H1-06 Duct Entry at Vaults and Boxes S54 W1-01 Excavation and Backfill S53 N3-01 Service Box Installation Details ~ Electrical Service Box Capacities DESIGNED RECOMMENDED) ACCEPTED | ~ENGWEER OF RECTORS c.crowson [1 stevanovic|_F DENNERT IDISTRIBUTION|/SSUED: OCT 2018 555 SERVICE BOX ROADWAY DUTY er noanne REPLACES. MAR 2016 ORIGINALLY (@ BC Hydro} ssueo: sun 1991 Sawa c|ociea ES54 B2-04.03 Use only for doing work with ofr BC Hydro. Complete Legal Acknowledgement is at www bchydro.comlistibutonstandards IREVIGIONS: R'- METHODS AAND 8 ELIMINATED, CAST IRON COVER ADDED. MAR 6 MK 760 Le @ ® AN CAUTION Rated for non-traffic applications only. Do not install in areas accessible by vehicular traffic ‘DESIGRED RECONMIENDED) ACCEPTED W.| YA : Le Ai Ma : vweewn_[LsteNone | & oewent [pISTRIBUTION]ISSUED: MAR 2016 ISTANDARDS. |REPLACES: JAN 1099 JORIGINALLY’ (@ BC Hydro}issuep: mar 1990 LIGHTWEIGHT SERVICE BOX SMALL NON-TRAFFIC DUTY ee ES54B3-01.01 |" Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at wuw bchydro.comlistibutonstandards IREVIGIONS: R'- METHODS AAND 8 ELIMINATED, CAST IRON COVER ADDED. MAR 6 MK 1500 MIN, Finished grade © \ [ON Access ane \, Sidewalk | or roadway Service ducts (4 MAX) sack Option 1: Precast Cover Finished grade Sidewalk or roadway. Option 2: Cast-Iron Cover DESIGNED RECORNTENDED]NCEPTED | ~ENOREENOFRECORE Yt LIGHTWEIGHT SERVICE BOX eel SMALL xen |. srewnowc|_F oenent [DISTRIBUTION||SSUED: MAR 2016 NON-TRAFFIC DUTY ISTANDARDS. |REPLACES: JAN 1099 pce 2 - JORIGINALLY . JO BC Hydrol NAY. scan [eee ES54B3-01.02 |" Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at wuw bchydro.comlistibutonstandards IREVIGIONS: R'- METHODS AAND 8 ELIMINATED, CAST IRON COVER ADDED. MAR 6 MK Notes 2Ren Excavation and backfiling shall comply with W1-01 Grounding shall comply with R2-01 Duct entry shall comply with H1-06. Cast-iron covers should be used for cover replacements, ‘A maximum of one (1) riser may be used for grade changes. Bill of Material em Description Catalogue ID | Quantity | Supplied By 1_| Small ightweight service box 400-0485 1 BC Hydro 2__| Small lightweight riser 400-0481 [1 | BC Hydro 3 | Small concrete collar 400-0484 1 BC Hydro OR | Small concrete cover 400-0483 1 BC Hydro 5*_| Small cast-iron cover geo0ses8_ | 1__—|_ BC Hydro 6 | 75mm bell ends 401-0183 | Specified by OR _| 100 mm bell ends 96021454 | Designer _| Contractor 7 [75 mm duct plugs 401-0197 | Specifiedby OR_| 100 mm duct plugs 96021457_| Designer | Contractor g | Grounding kt 412-0022 7 BC Hydro $4" x8! ground rod 420-1093, 1 BC Hydro “Note: Item 5 is optional, selected by Designer, per applicable CUG. For more information, see Distribution Stan- dards Equipment Advisory EA2012-010 Ri — Secondary Services Plastic Boxes Maintenance and New Replacement Covers. Reference Standards ES54 R201 Grounding of URD and UD Subsurface Structures in Public Corridors. E854 H1-06 Duct Entry at Vaults and Boxes S54 W1-01 Excavation and Backfill ES53 N3-01 Service Box Installation Details — Electrical Service Box Capacities ‘DESIGRED RECOMENDED) ACCEPTED | ~ENGHEER OF RECORS LIGHTWEIGHT SERVICE BOX i SMALL. 4 L.STEVANOWIC|_F DENNERT IDISTRIBUTION||SSUED: MAR 2016 STANDARDS |REPLACES: JAN 1999 y lo BCHydro| R'SINAL NON-TRAFFIC DUTY ES54 3-01.03 |"6 ISSUED: MAR 1980 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at wuw bchydro.comlistibutonstandards IREVIGIONS: 8.1 - METHODS AAND 8 ELIMINATED, CAST IRON COVER ADDED. MAR 6 MK JM, caunion t Rated for non-traffic applications only. Do not install in areas accessible by vehicular traffic 8 @ 1 DESIGNED RECOMMENDED] ACCEPTED [BIG OFRECORD 1 lu LIGHTWEIGHT SERVICE BOX u ASiae | Oe LARGE exe [1 stevnowo | F oewneRr [DISTRIBUTION] 'SSUED: MAR 2016 NON-TRAFFIC DUTY [STANDARDS BRIG PAGE 1 R (® BC Hydro} ss yep van 1999 OF 3 ES54 B3-02.01 1 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: 8.1 - METHODS AAND 8 ELIMINATED, CAST IRON COVER ADDED. MAR 6 MK 865, i 1500 MIN : Fished grade @r Access ine Sidewalk | or roadway ‘Secondary duct duct (6 MAX) ~ Backfill Option 1: Precast Cover Finished grade © Access lane Sidewalk or roadway Option 2: Cast-Iron Cover ‘DESIGRED RECOMMENDED) ACCEPTED | ~ENGHEER OF RECORS LIGHTWEIGHT SERVICE BOX LARGE (di-\ yt ASiae | Oe sxe | srevanovic | F DENNERT [DISTRIBUTION|'SSUED: MAR 2016 NON-TRAFFIC DUTY [STANDARDS |REPLACES: JAN 1999 JORIGINALLY [© BCHydro} Ss san 1000 E854 B3-02.02 "4 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: 8.1 - METHODS AAND 8 ELIMINATED, CAST IRON COVER ADDED. MAR 6 MK Notes 1. Excavation and backfilling shall comply with W1-01 2. Grounding shall comply with R2-01 3. Duct entry shall comply with H1-06. 4, Castiron covers should be used for cover replacements. 5. Amaximum of one (1) riser may be used for grade changes. Bill of Material Item Catalogue ID | Quantity | Supplied By 4_| Large lightweight service box 400-0486 4 BC Hydro 2 | Large lightweight riser 400-0482 1 BC Hydro 3__| Large concrete collar 400-0494 | BC Hydro OR | Large concrete cover 400-0493 1 BC Hydro 5*_| Large cast-iron cover 96008857 1 BC Hydro 6 | 75mm bell ends 401-0183 | Specifiedby | Contractor OR | 100 mm bell ends 96021454 | Designer_| Contractor 7 | 75mm duct plugs 401-0197 | Specifiedby | Contractor OR | 100 mm duct plugs 96021457 _|_Designer_| Contractor g | Grounding kit 412-0022 1 BC Hydro 6" x 8 ground rod 420-1093 fl BC Hydro Replacement Covers. Reference Standards “Note: Item 5 is optional, selected by Designer, per applicable CUG. For more information, see Distribution Standards Equipment Advisory EA2012-010 R1 ~ Secondary Services Plastic Boxes Maintenance and New sxe | srevanovic | F DENNERT IDISTRIBUTION|/SSUED: MAR 2016 E854 R201 Grounding of URD and UD Subsurface Structures in Public Corridors. E854 H1-06 Duct Entry at Vaults and Boxes: E854 W1-01 Excavation and Backfill E853 N3-01 Service Box Installation Details ~ Electrical Service Box Capacities ‘DESIGRED RECOMMENDED) ACCEPTED | ~ENGHEER OF RECORS fq ud LIGHTWEIGHT SERVICE BOX A Sane > LARGE NON-TRAFFIC DUTY [STANDARDS |REPLACES: JAN 1999 JORIGINALLY (@ BC Hydro}.ssuep: Jan 1909 ES54 B3-02.03 R 4 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: R2- REVISED LOND DUTY. MAR 2021 C6 Application This standard applies to the installation of polymer concrete lightweight secondary service boxes. Lightweight boxes installed with polymer concrete risers and lids are rated for sidewalk duty applications. This includes sidewalks and other pedestrian areas separated from traffic by a barrier curb with a vertical face. Lightweight boxes installed with polymer concrete risers and cast-iron covers are suitable for access lane duty applications. This includes areas for parking, private driveway, sidewalk or pedestrian walkway not separated from traffic by vertical curb, or other areas restricted to occasional non-deliberate heavy vehicular traffic with speed limited to 30 km/h. y DESIGNED JRECOUMENDED) ACCEPTED | ENGHEER OF RECORT Vet Ke LIGHTWEIGHT SERVICE BOX SMALL c.crowson [1 sTEVANOVIC|_F DENNERT IDISTRIBUTION||SSUED: MAR 2021 SIDEWALK / LANE DUTY STANDARDS. |REPLACES: APR 2018) JORIGINALLY {PBC Hydro}issuco. ocr 2017 oF 3 ES54 B3-03.01 2 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: R2- REVISED LOND DUTY. MAR 2021 C6 Plan Finished grade ~_ 879 7 Backfill essoneo"RECOMUENDED,-nccePrEO™ | moneenor econo TSbime. | GP c.crowson [1 sTEVANOVIC|_F DENNERT LIGHTWEIGHT SERVICE BOX SMALL SIDEWALK / LANE DUTY [DISTRIBUTION| STANDARDS (@ BC Hydro} ISSUED: MAR 2021 REPLACES: APR 2018) JORIGINALLY ISSUED: OCT 2017, moves OF 3 ES54 B3-03 .02 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: R2- REVISED LOND DUTY. MAR 2021 C6 Bill of Material kia | FEF L.STEVANOWIC|_F DENNERT \DISTRIBUTION|'SSUED: MAR 2021 STANDARDS. |REPLACES: APR 2018) @ BCHydro} ssucp: oct 2017 SMALL Material ity | Supplied tom Description Number | Quantity a 1__| Small sidewalk duty lightweight service box | 97002910 1 BC Hydro 2__| Small sidewalk duty lightweight riser 97003109 1 BC Hydro 3or | Small polymer concrete cover 97002912 1 4*__| Small cast-iron cover 96008858 1 BC Hydro 75 mm bell ends, or 401-0183 | Specifiedby 5 | 100 mm bell ends 96021454 | designer | Conrec 75 mm duct plugs, or 401-0197 | Specified by 8 | 100 mm duct plugs 96021457 | designer | Contactor Grounding kit 412-0022 1 7 | s¢¢x8 ground rod 420-1093 1 Coe 8 |G %'x3" 13 TPI SIS security bolt 96005248 2 BC Hydro * Note: Item 4, castuiron cover, may be selected by the designer for lane duty applications. Notes 4. Excavation and backfilling shall comply with W1-01. 2. Grounding shall comply with R2-01 3. Duct entry shall comply with H1-06. 4. Amaximum of one additional riser may be used for grade changes. Reference Standards ES53N3-01 Service Box Installation Details Electrical Service Box Capacities ES54H1-06 General Trenching Details Duct Entry Details ES54R2-01 Grounding of URD and UD Subsurface Structures in Public Corridors ES54W1-01 Construction Materials Excavation and Backfill DESIGNED” RECOMMIENDED|-ACCEPTED [RICHER OFRECORD LIGHTWEIGHT SERVICE BOX SIDEWALK / LANE DUTY JORIGINALLY ES54 B3-03.03 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: Ra - REVISED LOND DUTY. MAR 2021 C6 Application This standard applies to the installation of polymer concrete lightweight secondary service boxes. Lightweight boxes installed with polymer concrete risers and lids are rated for sidewalk duty applications. This includes sidewalks and other pedestrian areas separated from traffic by a barrier curb with a vertical face. Lightweight boxes installed with polymer concrete risers and cast-iron covers are suitable for access lane duty applications. This includes areas for parking, private driveway, sidewalk or pedestrian walkway not separated from traffic by vertical curb, or other areas restricted to occasional non-deliberate heavy vehicular traffic with speed limited to 30 km/h. ' ‘DESIGNED JRECOUMENDED) ACCEPTED | ENGHEER OF RECORT Dawns | Yee KZ LIGHTWEIGHT SERVICE BOX a LARGE c.crowson [1 sTEVANOVIC| _F DENNERT DISTRIBUTION] !SSUED: MAR 2021 SIDEWALK / LANE DUTY STANDARDS. |REPLACES: APR 2018) JORIGINALLY {PBC Hydro}issuco. ocr 2017 zaam (OF 3 ES54 B3-04.01 3 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: Ra - REVISED LOND DUTY. MAR 2021 C6 Finished grade Fr + ¥ MFI fo Backfill ey) DESIRED” RECORMENOED-HOCEPTED Ganon => LIGHTWEIGHT SERVICE BOX Coane | Yemen | E> LARGE c.cnowson | stevmowe | oenent SIDEWALK/ LANE DUTY \DISTRIBUTION|'SSUED: MAR 2021 ISTANDARDS. |REPLACES: APR 2018 ame? JORIGINALLY 7 (© BCHydro}issyeo: ocr 2017 mn OF 3 ESS4 B3-04 02 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: Ra - REVISED LOND DUTY. MAR 2021 C6 Bill of Material Reference Standards Material Supplied tem Description Naren! | Quantity Be 1__| Large sidewalk duty lightweight service box | 97002911 1 BC Hydro 2__| Large sidewalk duty lightweight riser 97003110 1 BC Hydro 3or | Large polymer concrete cover 97002913 1 4* | Large cast-iron cover 96008857 1 eC ag, 5 | 75mm bell ends, or 401-0183. | Specitedby | Castor 400 mm bell ends 96021454 | designer 7 mm duct plugs, or 401-0197 | Specified by 5 | 100 mm duct plugs 96021457 | designer | Comactor Grounding kit 412-0022 1 7 | s4"x8" ground rod 420-1093 1 oe 8 | @%"x3" 13 TPI SIS security bolt 96005248 2 BC Hydro * Note: Item 4, cast-iron cover, may be selected by the designer for lane duty applications. Notes 1. Excavation and backfiling shall comply with W1-01. 2. Grounding shall comply with R2-01 3. Duct entry shall comply with H1-06 4. Amaximum of one additional riser may be used for grade changes. c.crowson [1 stevanovic F_DENNERT [DISTRIBUTION|'SSUED: @ BCHydro}ssuco, STANDARDS. |REPLACES: APR 2018) JORIGINALLY MAR 2021 ES53N3-01 _ Service Box Installation Details Electrical Service Box Capacities ES54H1-06 General Trenching Details Duct Entry Details, ES54R2-01 Grounding of URD and UD Subsurface Structures in Public Corridors ES54W1-01 Construction Materials Excavation and Backfill TBESTGRED | RECONVENED) RCCEPTED | ~ STOTEER OF RECORS 5 => LIGHTWEIGHT SERVICE BOX Camo | Yet, | EP LARGE SIDEWALK / LANE DUTY OCT 2017 2021-08-03, OF 3 ES54 B3-04.03 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards Application This box is intended as a replacement for old secondary service boxes installed in residential utility corridors with limited space where a 332 box cannot fit. 2436 boxes installed with polymer concrete risers and lids are rated for access lane duty applications in accordance with ES54-U1-02 on lip for connection to box, 4 places typ. — >> penta-head screw {to secure lid to box 23kg Ly Neff / fh K SS "0% a7 kg Ly " Lee \ Wy NCCC \ YS a 11kg [REVIGIONS: Rt - UPDATED BILL OF MATERIALS. MAY 2021 LS DETCRET ERB FOOEPTET LIGHTWEIGHT SERVICE BOX bin | CC | E> “ RECTANGULAR TYPE 2436 Loran snatern | etat lbisTRIBUTION]ISSUED: NAY 2021 | § LANE DUTY \STANDARDS \|REPLACES: DEC 2020], GAGE (BCHydra| Ssccp oc 20 | wre OF ES54 B3-05.01 Use only for doing work with ofr BC Hydro. Complete Legal Acknowledgement is at wu bchydto.com/istibutonstandards 2 7 igement [REVIGIONS: Rt - UPDATED BILL OF MATERIALS. MAY 2021 LS Plan Finished grade i Service ducts Z (4 MAX per wall) ‘DESIGNED JRECOUMENDED) ACCEPTED | ~ENGHEER OF RETORT 5 ees Si LIGHTWEIGHT SERVICE BOX Mytin | Coons | BED | eSB, o [POOR RECTANGULAR TYPE 2436 |L.STEVANOVIC] C.CROWSON | F DENNERT 4 [DISTRIBUTION|'SSUED: May 2021) LANE DUTY SSoanoS'|REPLAces: DEC 2020) 5 GET @ @BCHydiralesiep occ am | ms OF ES54 B3-05.02 1 Use only for ding work with or fr BC Hydra, Complete Legal Acknowledgement is at wu: bchydro.convlistbutonstandards, [REVIGIONS: Rt - UPDATED BILL OF MATERIALS. MAY 2021 LS Notes Field cut holes for bell ends shall not be oversized and shall not cut the ribs. Excavation and backfiling shall comply with W1-01 Grounding shall comply with R2-01 Duct entry shall comply with H1-06. ‘A maximum of one top riser may be installed for future grade changes. If overbuilding an existing primary, cut the box bottom as minimally as necessary, and use a pure plain F1 class concrete footing to cover the entire base of the box. 7. Ifa deeper box is required, apply the following procedure: ‘a. Place box on extension; b. Align edges and secure parts in place with vice grips; c. Slide four clips (provided with the extension) over ribs at locations shown on page 1; and d._ Use mallet to knock clips all the way in on the ribs. eakena Bill of Material ap Material ; , Item Description Number | Quantity | Supplied By 1,23 | 2436 service box, riser, and lid * 97007034 1 BC Hydro 1,3. | 2436 service box and lid * 97008048 _| Asneeded | BC Hydro 1_| 2436 service box NIA NIA NIA 2_| 2436 riser* 97007035 _| Asneeded | BC Hydro 3__| 2436 lid * 97007036_| Asneeded | BC Hydro 75 mm bell ends, or 401-0183 | Specifiedby 4 | 100 mm bell ends 96021454 | designer | Contactor 75 mm duct plugs, or 401-0197 | Specifiedby 5 | 100 mm duct plugs 96021457 | designer | Contactor Grounding kit “412-0022 1 8 | sx 8' ground rod 420-1093 1 Beare) 7__ | 2436 box extension c/w clips (optional) 97008223 1 BC Hydro * Box is suppled with riser and lid as a kit. Individual material numbers for lid and riser are used if needed for maintenance replacement SIRES RECORSTENOE) ACCEPTED HOFER OF ECO Coan |Z LIGHTWEIGHT SERVICE BOX ~ RECTANGULAR TYPE 2436 LLstevnowel c caowsow |r oenest [DISTRIBUTION|ISSUED: MAY 2021 LANE DUTY IStANDARDS. |REPLACES. DEC 2020] 5,“ / . KB BC Hydro} sje. bec 2020 ewan (OF 4 ES54 B3-05.03 Use only for doing work with ofr BC Hydro. Complete Legal Acknowledgement is at wu bchydto.com/istibutonstandards [REVIGIONS: Rt - UPDATED BILL OF MATERIALS. MAY 2021 LS Reference Standards ES53 N3-01 Service Box Installation Details Electrical Service Box Capacities S54 H1-08.05 General Trenching Details Duct Entry Details, ES54 R2-01 Grounding of URD and UD Subsurface Structures in Public Corridors E854 U1-02 Design Criteria Design Loads Es54 W1-01 Construction Materials Excavation and Backfill SIRES RECORSTENOE) ACCEPTED HOFER OF ECO Coan |Z LIGHTWEIGHT SERVICE BOX ~ RECTANGULAR TYPE 2436 LLstevnowel c caowsow |r oenest [DISTRIBUTION|ISSUED: MAY 2021 LANE DUTY IStANDARDS. |REPLACES. DEC 2020] 5,“ ’ KB BC Hydro} sje. bec 2020 een (OF 4 ES54 B3-05.04 Use only for doing work with ofr BC Hydro. Complete Legal Acknowledgement is at wu bchydto.com/istibutonstandards ightweight Service Box Circular Concrete Service Box (EREYAEREUG Application This standard applies to the installation of circular concrete secondary service boxes. Circular concrete service boxes installed with cast-iron covers are suitable for both sidewalk duty and access lane duty applications. ‘Sidewalk duty applications include: a. Sidewalks; and b. Other pedestrian areas separated from traffic by a barrier curb with a vertical face. Lane duty applications include: a. Areas for parking: b. Private driveway; ©. Sidewalk or pedestrian walkway not separated from traffic by vertical curb; and 4d. Other areas restricted to occasional non-deliberate heavy vehicular traffic with speed limited to 30 kmvh. Revision Notes New standard, released concurrently with Standards and Equipment Advisory Information Bulletin 2023-019 Release of ES54 B3-06 Circular Concrete Service Box. Items Required Material Item | Description number | Quantity | Supplied by 1_ [Large circular concrete service box 9701-0149 1 BC Hydro 1 _ |Latge circular concrete service box extension 701182 | SPedtfed by | Bc yyaro (optional) designer Large circular concrete service box riser 9701-0150 1 BC Hydro Large circular concrete service box collar 9701-0151 1 BC Hydro Large cast-iron cover ‘9600-8857 1 BC Hydro 75 mm bell ends, or 401-0183 | Specified by © | 100 mm bell ends 9602-1454 | designer _| Comractor 75 mm duct plugs, or 401-0197 | Specified by 7 | 100 mm duct plugs 9602-1457 | designer | Comractor Grounding kit, and 442-0022 fl 8 | 4x8" ground rod 420-1093 1 Cees a 5s reseed —— x ia Lightweight Service Box ieee LS Circular Concrete Service Box fstnem| AAeiwlracht | weiinn —[BRAREUTON | = STANDARDS 7 laporove: Vietall 2029-06-28 ES54 B3-06 RO bch ng Steswe masis2s | & BCHydro Use only for doing work with or for BO Hydro, See legal disclaimer In ESS4 Av 2025-06-26, 1ev0 Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at wu bchydro.comiistibutionstahatts! f 4 Lightweight Service Box Circular Concrete Service Box (EREYAEREUG References BC Hydro Distribution Standards S53 N3-01 Service Box Installation Details Electrical Service Box Capacities ESS4H1-06 General Trenching Details Duct Entry Details S54 R2.01 Grounding of URD and UD Subsurface Structures in Public Corridors ES64W1-01 Construction Materials Excavation and Backfill Notes Excavation and backfiling shall comply with ES54 W1-01 Grounding shall comply with ES54 R2-01 Duct entry shall comply with ES54 1-06. When using a standard configuration of one circular concrete service box, riser, and collar, a maximum of one large circular concrete service box extension or one additional riser may be used for grade changes. The large circular concrete service box extension is intended for exceptional cases when deeper box installations are required. ise only for doing wrk with or for BG Hydro, See logal disclaimer in ESS4 AT-01 2025-06-26, 1ev0 Use only fr doing work with or for BC Hydro. Complete Legal Acknowledgement is at wu bchydro.comlaistibutionstahAtE? Of 4 Lightweight Service Box Circular Concrete Service Box ES 51 152, 152_, 305 Lifting insert ANP) 674 Figure 1 ~ Circular concrete service box Use only for doing work with or for BC Hydro. See legal disclaimer in ESS4 A101 2023-06-26, rev0 Use only for doing work with or for BC Hydro, Complete Legal Acknowledgement is at wu bchydro.comlaistibutionstahatGe? Of 4 ightweight Service Box Circular Concrete Service Box (EREYAEREUG Finished grade - O \ Service ducts ‘Secondary =3 Max per window ducts Figure 2 — Circular concrete service box, plan view Use only for doing work with or for BO Hydro, See legal disclaimer In ESS4 A 2023-06-26, rev Use only for doing work with or for BC Hydro, Complete Legal Acknowledgement is at wu bchydro.comlistibutionstahatee! f 4 REVISIONS: R.0- PREVIOUSLY INB1-02. MAR 16 MK| Rt “ADDED SECOND RISER, REMOVED LIFTING HOLESIBARS. OCT 18 6C important 1232 box installed with two risers has a depth greater lthan 4.5 feet (1350 mm) and is a confined space Si 400 Kg @ — Knock outs DESTGRED [RECOMMENDED] ACCEPTED Cone fim | FEE“ cc crowson |, srEvaNovio|_F. DENNERT [DISTRIBUTION||SSUED: OCT 2018 STANDARDS. |REPLACES: MAR 2016 JORIGINALLY (@ BC Hydro} ssuep: Nov 1989 1232 BOX PULL/SPLICE BOX NON-TRAFFIC DUTY PAGE 1 Jor 3 Es54B4-01.01 [4 Use only for doing work with or fr Hydra, Complete Legal Acknowledgement is at wu. bchydro.convlistbutonstandards Foul Falshederde entry Backfill 1000_ TYP [Duct | a ee DESTGNED [RECOMMENDED] ACCEPTED Cow Yemen | SER- cc crowson |, srEvaNovio|_F. DENNER [bistRIBUTION|ISSUED: OCT 2016 ISTANDARDS. |REPLACES: Mar 2016 loiciNALLY \ BCHydro}ssuco: Nov 1989 REVISIONS: R.0- PREVIOUSLY INB1-02. MAR 16 MK| Rt “ADDED SECOND RISER, REMOVED LIFTING HOLESIBARS. OCT 18 6C 1232 BOX PULL/SPLICE BOX NON-TRAFFIC DUTY £s54B4-01.02 [4 Use only for doing work with or fr Hydra, Complete Legal Acknowledgement is at wu. bchydro.convlistbutonstandards REVISIONS: R.0- PREVIOUSLY INB1-02. MAR 16 MK| Rt “ADDED SECOND RISER, REMOVED LIFTING HOLESIBARS. OCT 18 6C Notes 1. Excavation and backfiling shall comply with W1-01. 2. Sump and drain are optional, selected by Designer. 3. Grounding shall comply with R2-01 Bill of Material Item Description Catalogue ID | Quantity | Supplied By 1 _| Splice or pull box type 1232 400-0915 i BC Hydro 2_| Riser type 1232 400-0984 2 BC Hydro 3__| Type “A” slab 400-0960 1 BC Hydro 4_| Type "8" slab 400-0961 15 BC Hydro 5 | 75 mm duct plugs 401-0197 | 5 ccineany | contractor OR | 100 mm duct plugs geoztas7 | SpeCeNPY | Contractor OR | 125 mm duct plugs 96021459 2 BC Hydro 6 | 75mm bell ends 401-0183 | 5 ccineapy | contractor OR | 100 mm bell ends g60214s4 | Sheriner | Contractor OR_| 125 mm bell ends 96021455 2 BC Hydro Grounding kit 412-0022 1 BC Hydro 2" x 8' ground rod 420-1093 1 BC Hydro &_| Sump cover 400-0426 1 BC Hydro Reference Standards ES54 R2-01 Grounding of URD and UD Subsurface Structures in Public Corridors ES54.H1-06 Duct Entry at Vaults and Boxes E8546 Drainage Assemblies E854. W1-01 Excavation and Backfill CESTGRES RECOMMENDED} ACCEPTED | SIGHEEROF RECORD 1232 BOX Cun cote | bm SA- PULL/SPLICE BOX c.crowson | steviniowo | F oeNNeERT IDISTRIBUTIONIISSUED: OCT 2018 NON-TRAFFIC DUTY ISTANDARDS. |REPLACES: MAR 2016 maces z loricinaLty _ (@ BCHydro}.ssup: nov 1989 jor 3 ES54 B4-01.03 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/istibutonstandards important 1232 box installed with two risers has a depth greater than 4.5 feet (1350 mm) and is a confined space 3865 3,500 kg DESIGNED RECOMMENDED) ACCEPTED Pa Sep 1232 BOX aa PULL/SPLICE/JUNCTION BOX eee |e eee \DISTRIBUTION|'SSUED-OCT 2018 SIDEWALK DUTY PLSTRIBTION ACES: Mat 219 = . ]OBCHydrol ss ep aR 2016 meee lor 8 ES54 B4-02.01 1 Use only for ding work with or fr BC Hydra, Complete Legal Acknowledgement is at wu: bchydro.convlistbutonstandards 41000, Finished grade Plan DESIGNED RECOMMENDED) ACCEPTED Como Yate aR- .crowson |, sTEvaNovio|_F. DENNERT |DISTRIBUTION|'SSUED:OCT 2018 ISTANDARDS. REPLACES: MAR 2016 ORIGINALLY’ (OBC Hydro} ssuco: war 2016 1232 BOX PULL/SPLICE/JUNCTION BOX SIDEWALK DUTY PAGE 2 Jor 3 Es54.B4-02.02 |" 4 Use only for ding work with or fr BC Hydra, Complete Legal Acknowledgement is at wu: bchydro.convlistbutonstandards Notes 1. Excavation and backfilling shall comply with W1-01 2, Sump and drain are optional, selected by Designer. 3. Grounding shall comply with R2-01. 4. Duct entry shall comply with H1-06. 5. Unobstructed area may be reduced to 1000 for pull/splice boxes. Bill of Material Item Description Catalogue ID | Quantity | Supplied By | 1 _| Splice or pull box type 1232 400-0945 1 BC Hydro _| 2_| Riser type 1232 400-0984 2 BC Hydro | '3_| Collar clw frame type 1232 400-0916 4 BC Hydro | 4_ [tid {96007598 3 BC Hydro | 5 | Hardware for id 412-0042 3 BC Hydro | ‘Contractor 6 | 75mm duct plugs 401-0197 OR | 100 mm duct plugs 96021457 acer Cue OR | 125 mm duct plugs 96021459 peri Contractor 7. | 75mm bell ends 401-0183 OR | 100 mm bell ends 96021454 cae, Seal OR | 125 mm bell ends 96021455 : i Contractor g_ | Grounding kit 412-0022 1 BC Hydro W'x8 ground rod 420-1093 1 BC Hydro 3 [Sump cover 400-0426 i BC Hydro_| Reference Standards ES54 R2-01 Grounding of URD and UD Subsurface Structures in Public Corridors S54 H1-06 Duct Entry at Vaults and Boxes ES546 Drainage Assemblies S54 W1-01 Excavation and Backfill S53 D4-02 Three-Phase 1232 Junction Vaults (600 A/200 A) DESIGNED [RECOMMENOED) ACCEPTED | BYGHEER OF RECORO Chane Yi | ep .crowson |, sTEvaNovio|_F. DENNERT [DISTRIBUTION|'SSUED-OCT 2018 1232 BOX PULL/SPLICE/JUNCTION BOX SIDEWALK DUTY [STANDARDS REPLACES: MAR 2016 loriciNaLLy \O BCHydro}ssvep: war 2016 roios (OF ES54 B4-02.03 4 Use only for ding work with or fr BC Hydra, Complete Legal Acknowledgement is at wu: bchydro.convlistbutonstandards REVISIONS: Rt: REMOVED LIFTING HOLESIBARS, ADDED TEXT BOX. OCT'186C important: Non traffic duty 1832 box installed with more lthan 165 mm of earth cover has a depth greater than [4.5 feet (1350 mm) and is a confined space 100 2790 2,000 ig 3 oe _— EOD REEEEACCERTES" “RUA 832 BOX Cosmas] Ae | SBP PULLISPLICE BOX ce | teenies fecetoer NON-TRAFFIC DUTY \DISTRIBUTION|/SSUED: OCT 2018 [STANDARDS REPLACES: MAR 2016 . [ORIGINALLY (DBCHydro}esur5: war 2016 moon |OF 3 ES54 B5-01.01 4 Use only for doing work with or fr BC Hydra, Complete Legal Acknowledgement is at wu. bchydro.convlistbutonstandards REVISIONS: Rt: REMOVED LIFTING HOLESIBARS, ADDED TEXT BOX. OCT'186C Unobstructed area 1000, TYP’ Finished grade Plan Cover 150 MIN ‘500 MAX Road side Section ‘S) ey, esr Coane RECOMMENDED) ACCEPTED Skim | F- L.STEVANOVIC|_F DENNERT \DISTRIBUTION|/SSUED: OCT 2018 STANDARDS _|REPLACES: MAR 2016 [ORIGINALLY (@ BCHydro}ssueo: war 2016 832 BOX PULL/SPLICE BOX NON-TRAFFIC DUTY ES54 B5-01.02 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards REVISIONS: Rt: REMOVED LIFTING HOLESIBARS, ADDED TEXT BOX. OCT'186C Notes 4. Excavation and backfiling shall comply with W1-01 2. Sump and drain are optional, selected by Designer. 3. Grounding shall comply with R2-01 4. Duct entry shall comply with H1-06. Bill of Material Item Description Catalogue ID | Quantity | Supplied By 1__| Splice or pull box type 632 400-0990 1 BC Hydro 2_| Riser type 832 400-0992 1 BC Hydro 3_| Type “A slab 400-0960 1 BC Hydro 4 [Type “B" slab 400-0961 i BC Hydro. Contractor 5. | 75mm duct plugs 401-0197 , OR | 100 mm duct plugs aeoatas7 | Specitedby | Contractor OR | 125 mm duct plugs 96021459 ‘a ye Contractor Contractor 6 | 75mm bell ends 401-0183 OR | 100 mm bell ends 96021454 aoe bi ae OR | 125 mm bell ends 96021455 ae eer Contractor Grounding kit #Z0022 7 BC Hydro 8' ground rod 420-1093 4 BC Hydro ‘Sump cover 400-0426 1 BC Hydro Reference Standards E854 R201 E854 H1-06 Duct Entry at Vaults and Boxes ES54G Drainage Assemblies E854 W1-01 Excavation and Backfill Grounding of URD and UD Subsurface Structures in Public Corridors. esr Coane [RECOMMENDED] ACCEPTED | ENGWEER OF RECORT Skim | F- L.STEVANOVIC|_F DENNERT IDISTRIBUTION|!SSUED: OCT 2018 STANDARDS. |REPLACES: MAR 2016 (@ BCHydro}ssueo: war 2016 [ORIGINALLY 832 BOX PULL/SPLICE BOX NON-TRAFFIC DUTY OF ES54 B5-01.03 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards REVISIONS: R2- REVISED NOTE 5 TO ALLOW USE OF ALTERNATE DUCT ENTRY KNOCKOUT ON JUNCTION BOXES. 2940 [DISTRIBUTION||SSUED: NOV 2019 g = L- s 2,000 kg ped erage eee DER AA iw > Ser PULL/SPLICE/JUNCTION BOX son [Lsrewove| cones |f A gneRme } SRENTC CUT, STANDARDS. |REPLACES: OCT 2018) [ORIGINALLY (@ BCHydro}ssuep: mar 2016 ES54 B5-02.01 Use only for doing work with or fr BC Hydra, Complete Legal Acknowledgement is at wu. bchydro.convalistbutonstandards 1000, Unobstructed 1000, duct entry ‘Alternate duct entry Finished grade Plan 3000 ‘See note 6 L Backfill Section A Se DESIGNED RECOMMENDED) ACCEPTED REVISIONS: R2- REVISED NOTE 5 TO ALLOW USE OF ALTERNATE DUCT ENTRY KNOCKOUT ON JUNCTION BOXES. kis, 832 BOX Siitis AA hin. GP [Lee PULL/SPLICEMJUNCTION BOX asnones | stemove| enewenr |( ‘aznomne | Saeaaiccun |DISTRIBUTION|!SSUED: NOV 2019 so / |STANDARDS |REPLACES: OCT 2018) [ORIGINALLY Sree |PAGE 2 (BC Hydro} ssuco: mar 2016 sais (OF 8 ESS4 BS-02.02 Use only for ding work with or fr BC Hydra, Complete Legal Acknowledgement is at wu. bchydro.convlistbutonstandards, REVISIONS: R2- REVISED NOTE 5 TO ALLOW USE OF ALTERNATE DUCT ENTRY KNOCKOUT ON JUNCTION BOXES. Notes 1. Excavation and backfiling shall comply with W1-01 2. Sump and drain are optional, selected by Designer. 3, Grounding shall comply with R2-01 4, Duct entry shall comply with H1-06. 5. For junction boxes, use of “alternate duct entry” knockout is permitted; however, use of “duct entry” knockout shall be preferred. Refer to ESS4 BO-02 6. Unobstructed area may be reduced to 1000 for pull/splice boxes. Bill of Material Item Description Catalogue ID | Quantity | Supplied By 1 _| Splice or pull box type 832 400-0990 1 BC Hydro 2__| Riser type 832 400-0992 1 BC Hydro 3_| Collar ciw frame type 832 400-0993 1 BC Hydro 4_[ud [96007598 3 BC Hydro) 5 | Hardware for id 412-0042 3 BC Hydro Contractor 6 | 75mm duct plugs 401-0197 OR | 100 mm duct plugs 96021457 oot Peron OR | 125 mm duct plugs 96021459 ‘a ve | Contractor Contractor 7. | 75mm bell ends 401-0183 OR | 100 mm bell ends 96021454 ae Restriagll OR | 125 mm bell ends 96021455 2 a Contractor g_| Grounding kit 412-0022 7 BC Hydro 4" x 8! ground rod | 420-1093 1 BC Hydro ‘2 [Sump cover 400-0426 1 BC Hydro. Reference Standards ES54 R2-01 Grounding of URD and UD Subsurface Structures in Public Corridors S54 H1-06 Duct Entry at Vaults and Boxes S546 Drainage Assemblies S54 W1-01 Excavation and Backfill E853 D4-01 Three-Phase 832 Junction Vault (200 A) DESIGNED RECOMMENDED) ACCEPTED | ENGWEER OF RECORT sai ite 832 BOX AA Sim | EP Ee PULL/SPLICEMJUNCTION BOX ISTANDARDS REPLACES: OCT 2018 feces (BC Hydro} ssuco: mar 2016 mie |OF 3 ES54 B5-02.03 ! e L STEVANOWIC|_F_DENNERT { ‘AS RORAS } SIDEWALK DUTY [DISTRIBUTION|'SSUED: NOV 2019 4 oe Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards IREVIGIONS: R.2- REVISED NOTE 5 TO ALLOW USE OF ALTERNATE DUCT ENTRY KNOCKOUT FOR JUNCTION BOXES. / important: This installation is a lconfined space DESIGNED RECOMMENDED) ACCEPTED AuNornis |1, srevanovic| F DENNERT \DISTRIBUTION||SSUED: NOV 2019 STANDARDS. |REPLACES: OCT 2018) JORIGINALLY (@ BCHydro}ssuep: mar 2016 Ee, oN \ ‘gone | 832 BOX PULL/SPLICE/JUNCTION BOX ACCESS LANE DUTY Qe e Sey PAGE nest” PA 1 3 £854 5-03.01 |" 2 Use only for doing work with or fr BC Hydra, Complete Legal Acknowledgement is at wu. bchydro.convalistbutonstandards IREVIGIONS: R.2- REVISED NOTE 5 TO ALLOW USE OF ALTERNATE DUCT ENTRY KNOCKOUT FOR JUNCTION BOXES. Building wall 200 MIN to wall Alternate duct entry Unobstructed area Match finished,” ’\\ grade slope f) vote 6 3000 See ni Building wall © _— Non-shrink grout placed on box, riser & collar keyways for entire perimeter DESIGNED JRECOMMENDE ROCEPTED AZ| 6k, Sie; 832 BOX ny FDP | nN PULLISPLICE/JUNCTION BOX asnonnis [L stewnove| roewexr | f “& NORRIS rea FISH ISSUED: NOV NI soe } ACCESS LANE DUTY ISTANDARDS. |REPLACES: OCT 2018 JORIGINALLY Sree” |PAGE 2 |B BCHydro} este war 2016 eee lor 3 ES54 B5-03.02 Use only for ding work with or fr BC Hydra, Complete Legal Acknowledgement is at wu. bchydro.convlistbutonstandards, IREVIGIONS: R.2- REVISED NOTE 5 TO ALLOW USE OF ALTERNATE DUCT ENTRY KNOCKOUT FOR JUNCTION BOXES. Notes asso [_stewore coe | f Tyrome } |DISTRIBUTION|'SSUED: NOV 2019 4 [STANDARDS |REPLACES: OCT 2018 if O BCH! JORIGINALLY Nae lydro}.ssuep: MAR 2016 Diets AZ) im FP | er 1. Excavation and backtiling shall comply with W1-01 2. Sump and drain are optional, selected by Designer. 3. Grounding shall comply with R2-01 4. Duct entry shall comply with H1-06. 5. Forjunction boxes, use of “alternate duct entry” knockout is permitted; however, use of “duct entry’ knockout shall be preferred. Refer to ES54 B0-02 6. Unobstructed area may be reduced to 1000 for pull/splice boxes. Bill of Material tem Description Catalogue ID | Quantity | Supplied By 1__| Pullplice/unction box type 832 400-0990, 1 BC Hydro 2 [Riser type 832 400-0992 1 BC Hydro 3__| Lane duty collar ciw frame type 632 96016179 1 BC Hydro. 4 [Lane duty tid 96016176 3 BC Hydro 5 | Hardware for lane duty id 412-0042 6 BC Hydro Contractor 75 mm duct plugs 401-0197 6 | 100 mm duct plugs 96021457 ooaaae ae 125 mm duct plugs 96021459 pa Contractor 7 | 75mm bell ends 401-0183 OR | 100 mm bell ends geo2t4s4 | Specifedby Rsetiiniagl OR | 125 mm bell ends 96021455 ae eae Contractor | Grounding kt 412-0022 7 BC Hydro %" x 8" ground rod 420-1093 1 BC Hydro [Sump cover 400-0426 1 BC Hydro Reference Standards ES54 R2-01 Grounding of URD and UD Subsurface Structures in Public Corridors S54 H1-06 Duct Entry at Vaults and Boxes ES54G Drainage Assemblies E854 W1-01 Excavation and Backfill £853 04-01 Three-Phase 832 Junction Vault (200 A) DESIGNED” RECOMMIENDED|-ACOEPTED [PIER OFRECORD 832 BOX PULL/SPLICE/JUNCTION BOX ACCESS LANE DUTY PAGE 3 OF 3 ES54 B5-03.03 Use only for doing work with or fr BC Hydro. Complete Legal Acknowledgement is at www bchydro.com/listibutonstandards 3350 . DESIGNED RECONMEROED]AOCEFTED Ae t 832 BOX honed SE PULL/SPLICE/SERVICE/JUNCTION BOX c.cnowson | srevmwowe | oenent g |DISTRIBUTION||SSUED: OCT 2018 BOTTOMLESS SIgrANDARDS. |REPLACES: NA mea 5 3 JORIGINALLY §}@ BCHydro} csc: apr 2018 mene [OF 4 ES54 B5-04.01 0 Use only for ding work with or fr BC Hydra, Complete Legal Acknowledgement is at wu: bchydro.convlistbutonstandards Revisions, - 780, + Ground ~ £ pad i rr 2608 10 7 ! ie 250 Hole Knock Out Drain Detail Detail DESIGNED” RECOMMIENDED|-ACOEPTED [PIER OFRECORD : 832 BOX C008) Ae | SBE PULL/SPLICE/SERVICE/JUNCTION BOX .crowson|L stevnowo | F oenNeRr BOTTOMLESS [DISTRIBUTION||SSUED: OCT 2018 STANDARDS. |REPLACES: NIA JORIGINALLY }@ BCHydro}.ssurp: APR 2018 PAGE 2 lor 4 ES54 B5-04.02 Use only for ding work with or fr BC Hydra, Complete Legal Acknowledgement is at wu: bchydro.convlistbutonstandards 1000, Unobstructed Finished grade Plan Tout a SS 1 a 8 5 1 Khe Backfill~ Section A ey DESIGNED RECOMMENDED) ACCEPTED Crewe] Yee | AB c.crowson [1 sTEVaNOviC|_F DENNERT \DISTRIBUTION||SSUED: OCT 2018 PULL/SPLICE/SERVICE/JUNCTION BOX 832 BOX BOTTOMLESS S]efaonnoe ReP.aces Nia os s 2 Y g}@ BCHydro} sce apr 2018 meee lors ES54 B5-04.03 |" 0 Use only for ding work with or fr BC Hydra, Complete Legal Acknowledgement is at wu: bchydro.convlistbutonstandards

You might also like