0. REVISION CHECK
ISSUE NAME
Prepared: J. Menzel 2017-06-23
A Checked: R. Hug
Released: J. Huser
CHANGES
PAGE NO ITEM
1. OBJECTIVE
This Technical Specification defines the supply and control voltages, frequencies and their tolerances
as well as the system earthing for the auxiliary power distributions in the Combined Cycle Power
Plant EVM II.
2. SCOPE OF APPLICATION
This Technical Specification is valid for Turbine Auxiliaries, Power Island and the Balance of Plant
(BoP) Systems in the Project EVM II.
3. REFERENCE DOCUMENTS
Table 1 defines the voltages and frequencies for alternating current (AC) and direct current (DC)
systems, the applicable tolerances and the system earthing.
Distribution Boards/ Loads/
Remark
Supply 1 Consumers 2
Frequency
Frequency 60 Hz 60 Hz
Tolerance +4% / –5% +4% / –5%
AC Voltages
Medium Voltage
Voltage 6'900 V 6'600 V
Tolerance +5 % / –15 % +10% / –10% For Motor Start: – 20 % at terminals
System earthing Resistance earthed,
10 , 400 A/10sec {ON HOLD} Motor Heaters: 127 V AC, 1-phase,
Distribution network 3 phases, 3 wires (L1, L2, L3) 3 wires (L, N, PE)
Low Voltage three-phase
Voltage 600 V3 575 V Motors
Tolerance +5% / –15% +10% / –10% Loads > 63 A without Neutral4
System earthing Solidly earthed, TN-S System
Distribution network 3 phases, 4 wires For Motor Start: – 25% at terminals
(L1, L2, L3, PE)
Motor Heaters: 127 V AC, 1-phase,
3 wires (L, N, PE)
Voltage 480 V 460 V Motors
Tolerance +5% / –15% +10% / –10% Loads > 63 A without Neutral4
System earthing Solidly earthed, TN-S System
Distribution network 3 phases, 4 wires For Motor Start: – 25% at terminals
(L1, L2, L3, PE)
Motor Heaters: 127 V AC, 1-phase,
3 wires (L, N, PE)
Voltage 220 / 127 V 220 / 127 V BoP & Actuators
Tolerance +10% / –10% +10% / –10% Loads with Neutral, Ir < 63 A4
System earthing Solidly earthed, TN-S System
Distribution network 3 phases, 5 wires Dedicated voltage level for e.g. small
(L1, L2, L3, N, PE) power & lighting
Low Voltage single-phase
Voltage 127 V 127 V Only for BoP
Tolerance max. +10% / –10% +10% / –10%
System earthing Solidly earthed
Distribution network 3 wires (L, N, PE)
Low Voltage UPS single-phase
Voltage 127 V 127 V At distribution board:
Tolerance max. +10% / –10% +10% / –10% - via DC/ AC Converter: + 1% / – 1%
System earthing Solidly earthed, TN-C-S System - via Bypass: +10% / –10%
Distribution network 3 wires (L, N, PE)
DC Voltages
Low Voltage
Voltage 220 V 220 V
Tolerance +10% / –15% +10% / –20% Floating voltage: +10% continuously
System earthing Isolated from earth, IT System For Motor Start: –30% at terminals
Distribution network 3 wires (L+, L-, PE)
Low Voltage
(Solenoid valves)
Voltage 24 V 24 V From the control system, for solenoid
Tolerance +10% / –5% +10% / –15% valves with rated current of max. 3.15
System earthing Isolated from earth, IT System A. 220 V DC for higher current ratings
Distribution network 3 wires (L+, L-, PE)
Table 1: Voltages and Frequencies