APPENDIX 1, SHEET 1 TO SECTION J, ATTACHMENT J.

11 DC BUS INSTALLATION
TEST

Battery Load Test and Baseline

Note & Record All battery Manufacturer Data on Battery Load ok


1 Test Data Sheet (next tab)
ok
2 Check for Cell Cracks or Electrolyte Leakage on Flooded Cells.
ok
3 Check for Corrosion & Post Seal Integrity.
ok
4 Check integrity of Battery Racks.
ok
5 Check and Record Ambient Temperature and Ventilation.
6 Obtain initial Cell Corder data of battery string(s). ok

7 Measure and record total battery system (string) voltage. ok

8 Measure and record individual cell voltages. ok

9 Perform Internal Cell Resistance and Intercell Resistance Tests. ok

ok
10 Provide hard copy of Cell Corder data.
Disconnect battery string to be tested using installed disconnect device or ok
11 by disconnecting the negative cable connection and insulating.
12 Connect Load Bank to Battery Quick Disconnect ok

Initiate Load (Capacity) Test for 6 hours of testing, at the Battery


ok
13 Manufacturer's recommended Load to 1.75 VPC.
14 Record discharge data on Battery Load Test Data Sheet ok

15 Record measured capacity (in %) on Battery Load Test Data Sheet ok

ok
16 Upon completion of Load Test, initiate off-line recharge of tested string.
17 Upon completion of charge, place string back on-line. ok
Record any battery problems in "Notes" section of Battery Load Test
ok
18 Data Sheet.

Page 3 of 4
8/27/07
APPENDIX 1, SHEET 1 TO SECTION J, ATTACHMENT J.11 DC BUS INSTALLATION
TEST

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

See Comments

Page 3 of 4
8/27/07
APPENDIX 1, SHEET 2 TO SECTION J, ATTACHMENT J.11 DC BUS INSTALLATION TEST

Customer :__________________________________ Battery Manufacturer______________ Installers


Site :_______________________________________ Battery Model______________ Battery AH 1)._______________________
City: ________________ State: _________________ _________________ 2)._______________________
Contact:____________________________________ Battery String_______________ 3)._______________________
On Site Date:________________________________ Site Reserve Time___________ 4)._______________________

BATTERY ON DISCHARGE
AS CELL
RECEIVED VOLTAGE CELL CELL
CELL CELL CELL UNDER VOLTAGE TEMP.
NO. SERIAL VOLTAGE LOAD AFTER (NEG. POST
NUMBER (OPEN (START OF RECHARGE OF CELL)
CIRCUIT) TEST)
10 MIN. 20 MIN. 30 MIN. 1 HR 2 HR 3 HR 4 HR 5 HR 6 HR
Cell 1
Cell 2
Cell 3
Cell 4
Cell 5
Cell 6
Cell 7
Cell 8
Cell 9
Cell 10
Cell 11
Cell 12

Total Batt
Voltage
Amb. Temp

Test Amps

% Capacity
(Tested)

Page 4 of 4
8/27/07
APPENDIX 1, SHEET 2 TO SECTION J, ATTACHMENT J.11 DC BUS INSTALLATION TEST

NOTES:

Page 4 of 4
8/27/07