Creep & Degree of Consol
Creep & Degree of Consol
GCU
ZONE 1A-2
Degree of Consolidation
TIME (YEARS)
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0
20
DEGREE OF CONSOLIDATION (%)
40
60
80
100
120
Z:\1.1 Project TCL\JJ013 RAPID SI for UIO Technip\Design\Phase 2\GAR 2 - Utilities, Interconnecting, Offsites & Offplot\Section 1\Pad Foundation\Degree of Consolidation\Zone 1A-2 27/10/2015
RAPID SI FOR OUI JV (GAR 2 - SECTION 1)
GCU
ZONE 1C
Degree of Consolidation
TIME (YEARS)
0.0
1.0
2.0
3.0
4.0
5.0
6.0
0
20
DEGREE OF CONSOLIDATION (%)
40
60
80
100
120
Z:\1.1 Project TCL\JJ013 RAPID SI for UIO Technip\Design\Phase 2\GAR 2 - Utilities, Interconnecting, Offsites & Offplot\Section 1\Pad Foundation\Degree of Consolidation\Zone 1C 27/10/2015
RAPID SI FOR OUI JV (GAR 2 - SECTION 1)
GCU
ZONE 3&4
Degree of Consolidation
TIME (YEARS)
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
0.0
20
DEGREE OF CONSOLIDATION (%)
40
60
80
100
120
Z:\1.1 Project TCL\JJ013 RAPID SI for UIO Technip\Design\Phase 2\GAR 2 - Utilities, Interconnecting, Offsites & Offplot\Section 1\Pad Foundation\Degree of Consolidation\Zone 3&4 27/10/2015
ZONE 1A‐2
Secondary Settlement (Creep):
Layer 1a
Time, T
Thickness, End of Primary
(years) CR Cα' Settlement, Sα2 (mm)
H1a (m) Consolidation, tp (years)
0.0 0.00
3.0 2 0.200 0.008 0.25 17.27
5.0 2 0.200 0.008 0.25 20.82
10.0 2 0.200 0.008 0.25 25.63
15.0 2 0.200 0.008 0.25 28.45
20.0 2 0.200 0.008 0.25 30.45
30.0 2 0.200 0.008 0.25 33.27
40.0 2 0.200 0.008 0.25 35.27
50.0 2 0.200 0.008 0.25 36.82
SOIL MODEL:
LAYER 1a1
3
γ= 15 kN/m
CR = 0.2 H1a‐1 = 2 m
Cu = 15 kPa
LAYER 1
3
γ= 17 kN/m
N 7 H1= 11.5 m
RAPID FOR OUI JV (GAR 2 ‐ SECTION 1)
Time Vs. Secondary Settlement (Zone 1A‐2)
Time, T (years)
0 10 20 30 40 50 60
0
10
Secondary Settlement, Sα ( mm)
15
20
25
30
35
40
ZONE 1C
Secondary Settlement (Creep):
Layer 1a
Time, T
Thickness, End of Primary
(years) CR Cα' Settlement, Sα2 (mm)
H1a (m) Consolidation, tp (years)
0.0 0.00
3.0 3 0.200 0.008 0.25 25.90
5.0 3 0.200 0.008 0.25 31.22
10.0 3 0.200 0.008 0.25 38.45
15.0 3 0.200 0.008 0.25 42.68
20.0 3 0.200 0.008 0.25 45.67
30.0 3 0.200 0.008 0.25 49.90
40.0 3 0.200 0.008 0.25 52.90
50.0 3 0.200 0.008 0.25 55.22
SOIL MODEL:
LAYER 1
γ= 17 kN/m3
N= 7 H1‐1 = 7 m
LAYER 1a
γ= 15 kN/m3
CR = 0.2 H1a = 3 m
Cu = 15 kPa
LAYER 1
γ= 17 kN/m3
N 7 H1‐2 = 4.5 m
RAPID SI FOR OUI JV (GAR 2 ‐ SECTION 1)
Time Vs. Secondary Settlement (Zone 1C)
Time, T (years)
0 10 20 30 40 50 60
0.00
10.00
Secondary Settlement, Sα ( mm)
20.00
30.00
40.00
50.00
60.00
ZONE 3&4
Secondary Settlement (Creep):
Layer 1a
Time, T
Thickness, End of Primary
(years) CR Cα' Settlement, Sα2 (mm)
H1a (m) Consolidation, tp (years)
0.0 0.00
3.0 10.5 0.200 0.008 0.25 90.65
5.0 10.5 0.200 0.008 0.25 109.29
10.0 10.5 0.200 0.008 0.25 134.57
15.0 10.5 0.200 0.008 0.25 149.36
20.0 10.5 0.200 0.008 0.25 159.86
30.0 10.5 0.200 0.008 0.25 174.65
40.0 10.5 0.200 0.008 0.25 185.15
50.0 10.5 0.200 0.008 0.25 193.29
SOIL MODEL:
LAYER 1a1
3
γ= 15 kN/m
CR = 0.2 H1a‐1 = 10.5 m
Cu = 15 kPa
LAYER 1
3
γ= 17 kN/m
N 7 H1= 3.5 m
RAPID FOR OUI JV (GAR 2 ‐ SECTION 1)
Time Vs. Secondary Settlement (Zone 3&4)
Time, T (years)
0 10 20 30 40 50 60
0
50
Secondary Settlement, Sα ( mm)
100
150
200
250