Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

10 9 8 7 6 5 4 3 2 1

G G

F F

E E

LOCATION MAP

D D

L SUB L2- SUB

PVC PIPE
C

CABLE TRAY
CABLE TRAY

PERSPECTIVE EXISTING INDUSTRIAL STRUCTURE LINE

SITE DEVELOPMENT PLAN


1
ITEM DESCRIPTION: MATERIALS TOTAL WT. REMARKS
QTY DIMENSIONS:
NO.: BoM Sub-DRW.NO. Sub-Term Unit wt. Size Code
MATERIAL
CODE

DRAWING TITLE:
B B
ENGINEERING DESIGN, SUPPLY AND INSTALLATION
OF NEW POWER CAPACITOR IN REFINERY L AND L2
SUBSTATION

SIZE: SCALE: LOCATION:


PASAR PLANT SITE, LIDE ISABEL LEYTE
UNITS: TOLERANCES: AUTHOR:

LANGUAGE: PROJECT NO.: SHEET


CONTENT: AS SHOWN

A DESIGNED BY: NOTED BY: Client's Drawing no. Type SHEET No. /SHEET A
ZALDY Y. IBAŃEZ JOHN EPHRAIM MARI REYES DATE: 01/20/2024 A-1
DRAWN BY: RECOMMENDED BY: DRAWING NO. rev. no.
ZALDY Y. IBAŃEZ ROCKY TRINIDAD

PROPOSED DRAWING
CHECKED BY: APPROVED BY: 1 0
NORMAN BAUTISTA DANIEL L.K CHING

10 9 8 7 6 5 4 3 2 1

You might also like