26th July, 2023

CLIENT: DANIEL MURUNGA SICHANGI

REF: QUOTATION FOR HYDROGEOLOGICAL SURVEY, DRILLING & EQUIPPING


OF 1 NO. BOREHOLE IN MARAFA AREA, KILIFI COUNTY

Bill No. 1: Hydrogeological survey, Drilling, Casing & Development


Client: Depth 180M
ITEM Description Unit Qty Rate Total

Kshs Kshs
Preliminaries and General items
1.1 Mobilization of staff and machinery to site Erecting, LS 1 80,000.00 80,000.00
dismantling, and demobilize upon completion

1.2 Provide all other plant, equipment and supervisory LS 1 50,000.00 50,000.00
staff
Drilling
1.3 Provide for drilling additives and water for all LS 1 10,000.00 10,000.00
requirements
1.4 Drilling of borehole 215mm from ground level to m 100 7,500.00 750,000.00
100m
1.5 Drilling of borehole 215mm from 101m to 200m m 100 7,000.00 700,000.00
1.6 Drilling of borehole 215mm from 201m to 220m m 20 6,700.00 134,000.00
1.7 Ditto item 1.6 but 221 and above m Rate 3,800.00 Rate Only
Only

Casings and screens


1.8 Supply & install 10'' surface permanent casing m Rate 8,500.00 Rate Only
Only
1.9 Supply and install 6'' Borehole plain casings m 154 2,200.00 338,800.00
1.10 Supply & install 6'' Borehole slotted casings m 66 2,400.00 158,400.00
1.11 Supply and install well graded gravel pack (size 2- Tons 8 6,000.00 48,000.00
4mm)
Development
1.12 Physical and chemical development of the borehole Hrs 2 5,500.00 11,000.00
TOTAL 2,280,200.00

Bill No.2: Test Pumping


1.1 Undertake constant discharge test to determine Hrs 24 2,500.00 60,000.00
borehole parameters
1.2 Undertake water level observation and record Hrs 2 5,500.00 11,000.00
recovery
1.3 Physical and chemical analysis of the water Item 1 10,000.00 10,000.00
1.4 Preparation of Borehole Completion Report LS 1 10,000.00 10,000.00
TOTAL 91,000.00