Professional Documents
Culture Documents
33117-Iqc-0006 Rev. A
33117-Iqc-0006 Rev. A
SHEET 1 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
1
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 2 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
1. GENERAL REQUIREMENTS:
API 560 5th Edition (2016) “FIRED HEATERS FOR GENERAL REFINERY SERVICE”.
API 530 7th Edition (2015) “CALCULATION OF HEATER TUBE THICKNESS IN
PETROLEUM REFINERIES”.
ASME B31.3 2016 Edition “PROCESS PIPING”.
2-12-7 (19 March 2015) “FIRED HEATER” – UOP Specification.
ASME II 2017 Edition (Part A, C, D).
ASME V 2017 Edition “NONDESTRUCTIVE EXAMINATION”.
ASME VIII Div. 1 2017 Edition “RULES FOR CONSTRUCTION OF PRESSSURE VESSELS”.
ASME IX 2017 Edition “QUALIFICATION STANDARD FOR WELDING, BRAZING AND
FUSING PROCEDURES; WELDERS; BRAZERS; AND WELDING, BRAZING AND FUSING
OPERATORS”.
EN 10204 2004 Edition “METALLIC PRODUCTS-TYPES OF INSPECTION DOCUMENTS”.
B034-0MN-80-45-SP-0002 Rev. 0 “JOB SPECIFICATION FOR FIRED HEATER
PACKAGE”.
B034-0MN-80-45-SP-0003 Rev.0 “SPECIFICATION FOR PROCUREMENT OF PRESSURE
PARTS”.
B034-9-1842-1001-R1 “INSPECTION METHODOLOGY FOR PACKAGE ITEMS”.
6-17-0001 Rev. 5 “STANDARD SPECIFICATION FOR EXECUTION OF FIRED HEATERS
AND APH SYSTEMS”.
6-17-0003 Rev. 4 “STANDARD SPECIFICATION OF COIL WORK FOR FIRED HEATERS”.
6-17-0017 Rev. 0 “STANDARD SPECIFICATION FOR QUALITY CHECKS FOR
FABRICATION ERECTION AND EXECUTION OF FIRED HEATERS”.
6-44-0051 Rev. 6 “TECHNICAL NOTES FOR PIPES”.
6-44-0053 Rev. 6 “TECHNICAL NOTES FOR FLANGES, SPECTACLE BLINDS AND DRIP
RINGS”.
2
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 3 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
6-44-0054 Rev. 6 “TECHNICAL NOTES FOR BUTT WELDED, SOCKET WELDED AND
SCREWED FITTINGS”.
6-78-0003 Rev. 1 “SPECIFICATION FOR DOCUMENTATION REQUIREMENTS FROM
SUPPLIERS”.
6-82-0002 Rev. 3 “STANDARD SPECIFICATION FOR POSITIVE MATERIAL
IDENTIFICATION AT CONSTRUCTION SITES”.
API 578 3rd Edition 2018 “MATERIAL VERIFICATION FOR NEW AND EXISTING ALLOY
PIPING SYSTEMS”.
6-82-0004 Rev. 1 “STANDARD SPECIFICATION FOR PIPING & HEATER (FIRED) COIL
MATERIAL TRACEABILITY AT CONSTRUCTION SITES”.
6-82-1010 Rev. 1 “INSPECTION AND TEST PLAN (ITP) FOR INCOMING MATERIAL
CHECKING FOR CONTRACTOR’S SUPPLIED MATERIALS”.
6-82-5000 Rev. 0 “INSPECTION & TEST PLAN FOR HEATER PACKAGES”.
B034-000-80-45-4404 Rev. 0 “GENERAL ARRANGEMENT DRAWINGS NOTES”.
B0340MN804501301 Rev. 0 “GENERAL ARRANGEMENT CROSS & LONG SECTION
NHT CHARGE HEATER (MN-H-01)”.
B0340MN804501302 Rev. 0 “GENERAL ARRANGEMENT PLANS-1”.
B0340MN804501303 Rev. 0 “GENERAL ARRANGEMENT PLANS-2”.
- No production welding shall be performed until the welding dossier (weld map with all
weld joints clearly marked, WPS and PQR) has been reviewed and returned to Vendor
either with minor comments or without comments.
- Welder performance qualifications as per clause 3.3 of 6-17-0003 Rev. 4. All Welders
and welding operators shall be qualified in accordance with ASME IX with the procedure,
materials and wall thickness range which are used for coils. Inspector shall witness the
test and certify the qualification of each welder. Only welders approved by the Inspector
shall be employed.
3
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 4 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
- All PQR’s must be qualified in accordance with the requirements of ASME B31.3 2017
Edition, ASME IX 2017 Edition, API 560 5th Edition and applicable Project Specifications
6-17-0003 Rev. 4, 2-12-7 and B034-000-80-45-4404 Rev. 0.
- Welding consumables shall be selected in accordance with Appendix I & II of Project
Specification 6-17-0003 Rev. 4, Note 16 Section B of B034-000-80-45-4404 Rev. 0 and
Section 11.m of UOP Project Specification 2-12-7:
Material certificates (welding consumables) shall be certified as indicated in
section 3.4.3 of 6-17-0003:
a) Material certificate shall be EN 10204 3.1 in chemical and EN 10204 3.1 in
mechanical properties in accordance with the corresponding SFA of ASME II
Part C 2017 Edition.
Brand of welding consumables shall be is subjected to the approval of EIC, as
required in Section 3.7.7 of Project Specification 6-17-0003 Rev. 4.
In case of dissimilar metals to be welded together the composition of welding
consumables shall be at least similar to that of higher alloyed material, as per
Note 16 Section B of B034-000-80-45-4404 Rev. 0 and section 11.m of UOP
Project Specification 2-12-7.
Rutile type electrodes (E-3XX-17 or E-3XX-16) are strictly forbidden for any
kind of welding operation for stabilized stainless steel (347H material).
For Stainless steel material, ferrite value shall be reported in the corresponding
welding consumable certificate. Acceptance criteria shall be minimum 5 FN and
maximum 10 FN for type 347 weld deposit. For other weld deposit minimum FN
shall be 3 and maximum 10 FN.
- Permitted welding processes as per API 560 5th Edition (2016), applicable Code ASME
B31.3 2016 Edition and Section 3.7 of Project Specification 6-17-0003 Rev. 4.
GTAW process shall be used for root passes and GTAW or SMAW process for fill and
cap passes (See appendix II of 6-17-0003 Rev. 4).
As required in section 3.7.2 of 6-17-0003 Rev. 4, purging inside the tubes for GTAW
welding shall be done with Argon 99.98% purity. Shielding gas shall be Argon 99.99%
purity.
4
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 5 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
- Backing strips or consumable inserts shall not be used (section 3.7.4 of 6-17-0003 Rev.
4 and section 11.n of UOP Project Specification 2-12-7).
- Installation and welds of thermocouples on furnace tubes shall be carried out in
accordance with Appendix V of Project Specification 6-17-0003 Rev. 4 and also in
accordance with the applicable Codes.
- Preheating shall be as per section 3.8 and Appendix III of 6-17-0003 Rev. 4 and Section
330 of ASME B31.3 2016 Edition.
The preheat zone shall be at or above the specified minimum temperature in all
directions from the point of welding for a distance of the larger or 75 mm or 1.5 times
the greater nominal thickness.
Preheating shall be made using electrical resistances as required in section 7.4.5 of
B034-0MN-80-45-SP-0002 Rev. 0.
For welding in the case of dissimilar alloy combinations, the preheat temperature shall
be according to the alloy requiring the higher temperature.
Temperature measurement for preheating may be by thermocouple or temperature
sensitive crayons.
Minimum preheat temperature shall be in accordance with the requirements of the
specific Codes and applicable Project Specifications, the most stringent:
Welds between stainless steel material (ASME Number P8): 10ºC.
- Maximum interpass temperature shall be monitored by means of thermosticks or
thermocouples.
Maximum interpass temperature shall be in accordance with the requirements of the
specific Codes and applicable Project Specifications, the most stringent:
Welds between stainless steel material (ASME Number P8): 175ºC.
- Specific test of PQR’s:
PQR’s for stainless steel material (347H) shall be qualified with stabilization heat
treatment 900 ± 4 ºC during 4 hours rapidly cooled down by air, macrographic
test, chemical analysis, intergranular corrosion test, ferrite test (to be carried
out before stabilizing heat treatment) and the specific test required by ASME IX
2017 Edition.
5
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 6 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
- No welding repairs shall be carried out without the approval of Client and Owner
inspector.
6
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 7 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
2. NHT CHARGE HEATER MN-H-01, PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
CROSSOVERS, H2 SERVICE, MATERIAL 347H - ASME B31.3 2016 Ed.- MDMT = 15ºC:
- Required documentation:
Inspection and test plan in accordance with ITP 5011 Rev. 0 included in Project
Specification 6-82-5000 Rev. 0 and considering the requirements indicated in
these fabrication requirements. At least, 4 columns shall be included in each ITP:
MANUFACTURER, TECNICAS REUNIDAS, TPIA & EIL.
7
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 8 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
Welding dossier (Weld map marking clearly all weld joints, WPS, PQR) in
accordance with the specific Codes, Project Specifications and requirements of
section 1.2 of this document. Fabrication shall not commence until all the
involved documents have been reviewed and returned to Vendor either with
minor comments or without comments.
Welders Qualifications in accordance in accordance with the specific Codes,
Project Specifications and requirements of section 1.2 of this document.
Weld control sheets. Information there included shall be, at least, the following:
Heater number, Coil reference, Weld number/identification, Base Material
Specifications and base material heat number, WPS reference, Welding
Consumable specification and heat number, Welding date, Welder
identification, NDTs report number and date of test, PMI report number and
date of test, PWHT report number and date, Hardness report number and
date…. See an example in Annex I of this document.
Welding Repair Procedure (in accordance with the requirements of ASME B31.3
2016 Edition and Sections 3.6.7 & 5 of 6-17-0003 Rev. 4). Only two repairs per
joint are permitted. No welding repairs shall be carried out without the approval
of Client and TR inspector.
Material Certificates of welding consumables in accordance with EN 10204 3.1
(for chemical and mechanical properties).
Procedure for material inspection at reception and material traceability
procedure in accordance with ASME Code and Project Specifications 6-17-0003
Rev. 4 , 6-82-0004 Rev. 1 and ITP 6-82-1010 Rev. 1 “Inspection and test plan for
incoming material (checking for contractor’s supplied materials)”.
Positive Material Identification Procedure (PMI), quantitative and recordable
measure method in accordance with Project Specification 6-82-0002 Rev. 3, API
578 3rd Edition (2018) and API 560 5th Edition (2016). Acceptable PMI
instruments shall be “Optical Emission” type for the detection of Carbon
content.
Elements to be analyzed for 347H and 310H shall be:
8
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 9 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
9
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 10 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
10
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 11 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
11
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 12 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
12
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 13 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
consist of the welds between the pipe & reinforcement element (weldolet),
welds between weldolets and running pipes, welds between nozzle and flanges.
10% Radiographic test (RT) per welder and shift of butt-welds and branch
connections (welds between weldolets and pipes, welds between pipes and
flanges) before Stabilizing Heat treatment.
10% Ultrasonic examination per welder and shift, before PWHT, may be applied
instead of radiography when the configuration makes radiographic examination
difficult to interpret or impossible to perform (welds between weldolets and
manifolds, fillet welds). When ultrasonic examination is impractical, liquid
penetrant test may be permitted (see section 4.3.7 of 6-17-0003 Rev. 4).
100% ferrite test of welds before stabilizing heat treatment with ferritoscope.
100% PMI of base metal and welds before Stabilizing Heat Treatment in
accordance with Project Specification 6-82-0002.
Stabilizing heat treatment of welds at 900 ± 4 ºC during 4 hours rapidly cooled
down by air. Monitoring of Heat Treatment cycle and review of Heat treatment
graph and report.
100% visual examination after Stabilizing Heat Treatment.
100% liquid penetrant test of cover passes of branch welds (vent & drains,
including fillet welds), after Stabilizing Heat Treatment. Branch welds shall
consist of the welds between the pipe & reinforcement element (weldolet),
welds between weldolets and running pipes, welds between nozzle and flanges.
100% Radiographic test (RT) of all butt welds and branch connections (welds
between weldolet and pipes, welds between pipes and flanges) after Stabilizing
Heat Treatment in accordance with section 4.3.1 of 6-17-0003 Rev. 4, section
11.q, 11.r & 12.3.d of 2-12-7.
100% Ultrasonic examination after Stabilizing Heat Treatment may be applied
instead of radiography when the configuration makes radiographic examination
difficult to interpret or impossible to perform (welds between weldolets and
manifolds, fillet welds), see section 4.3.7 of 6-17-0003 Rev. 4, 12.3.d of 2-12-7
13
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 14 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
14
NHT CHARGE HEATER PRESSURE PARTS FABRICATION
SHEET 15 OF 16
REQUIREMENTS
PROJECT: BS-VI MS BLOCK PROJECT KOCHI REFINERY
EQUIPMENT: NHT CHARGE HEATER MN-H-01 EIL PROJECT Nº: B034
TRSA PROJECT Nº:
PROCESS RADIANT COIL, PROCESS CONVECTION COIL AND
33117
CROSSOVERS
15
NHT CHARGE HEATER PRESSURE PARTS FABRICATION REQUIREMENTS SHEET 16 OF 16