DESKRIPSI SITE
consultant Project
TOWER BERSAMA GROUP
Site Name
KEBOMASDAHANREJO1
Site ID
1614231001
Tower Type
PT. WHIDIA BHARAYA SST 42M - TBI3
Jln KATALIA 1, NO 20, RT: 005, RW :008 Foundation Type
Kota Bambu Utara, Palmerah, Jakarta Barat Raft
NEW SITE
wb date
02 April 2024
v23.04.07 F
DESIGN CRITERIA
2.3 MATERIALS
TOWER DATA
SUPPORT REACTION
FOUNDATION DESCRIPTION
Foundation Type Raft
Depth of Foundation 1500 mm
Pedestal Dimension 600 x 600 mm
Pad Dimension 5200 x 5200 mm
REMARK
Catatan :
NEW SITE
ANALISA PONDASI
DESCRIPTION
Base Width (BW) = 3.4 m Slab
Concrete Cover = 50 mm Dimension (m) = 0 x 0 x 0
Number of Pedestal = 4
Pedestal Tie Beam Number of Beam = 4
Pedestal Dimension = 0.6 x 0.6 m Dimension = 0.2 x 0.3 m
Above Ground Level = 0.7 m Bottom Elv (-) = 1 m
H Pedestal Under Ground Level = 1.15 m
Pad Pile
Pad Dimension (B) = 5.20 x 5.20 x 0.35 m Total Number of Pile = 0
Depth of Foundation = 1.50 m Dimension = 0 m (Diameter)
Number of Pad = 1 Elevation (-) = 0 m
MATERIAL SPESIFIKASI
Soil
qc = 25 kgf/cm2
qall = qc / 15 = 1.67 kgf/cm
2
= 163.4 KN/m2
Concrete
Specified Compressive strength
K = 22.5 N/mm²
fc = 18.68 N/mm²
Unit weight of Concrete (submerge)
γcsm = 1400 kgf/m³
Concrete strength of factor
β1 = 0.85
Unit weight of Concrete (dry)
3
γcd = 2400 kgf/m³ = 23.54 KN/m
Rebar
3
Unit weight of Steel (γs) = 7850 kgf/m³ = 76.98 KN/m
Specified Yield strength
fy1 = 280 N/mm² ( to D 10 mm used steel screw U-28 or BJPT-28 )
fy2 = 420 N/mm² ( to D > 13 mm used steel screw U-42 or BJPT-42 )
fy3 = 240 N/mm² ( to Ø 8 mm used plain steel U-24 or BJPT-24 )
Diamater Pad rebar (Prd) = 16 mm D Beam Rebar = 16 mm
Diamater Ped. rebar (Pdrd) = 16 mm D Beam Stirrup = 10 mm
Diamater Ped.Stirrup (Pdsd) = 10 mm D Pile Rebar = 16 mm
Diamater Slab rebar (Srd) = 16 mm D Pile Stirrup = 10 mm
v23.04.07 1 4/2/2024
SITE NAME : KEBOMASDAHANREJO1 PROJECT : TOWER BERSAMA GROUP
NEW SITE
Pedestal Slab
Volume = 2.66 m3 Volume = 0.00 m3
H Dry = 1.85 m H Dry = 0.00 m
H Submerge = 0.00 m H Submerge = 0.00 m
Dry Weight = 6393.60 kgf Dry Weight = 0.00 kgf
Surmerge Weight = 0.00 kgf Surmerge Weight = 0.00 kgf
Total Weight = 6393.60 kgf Total Weight = 0.00 kgf
= 62.70 kN
Tie Beam
Pad Volume = 0.67 m3
3
Volume = 9.46 m H Dry = 0.30 m
H Dry = 0.35 m H Submerge = 0.00 m
H Submerge = 0.00 m Dry Weight = 1612.80 kgf
Dry Weight = 22713.60 kgf Surmerge Weight = 0.00 kgf
Surmerge Weight = 0.00 kgf Total Weight = 1612.80 kgf
Total Weight = 22713.60 kgf
= 222.75 kN Existing Foundation
Weight of Concrete = 0 kgf
TOTAL BERAT BETON Weight of Backfill = 0 kgf
Total Volume = 12.80 m3
Total Weight = 30720.00 kgf Luas Lubang Pad = 0 m2
= 301.27 kN Volume = 0.00 m3
H Dry = 0.35 m
H Submerge = 0.00 m
Dry Weight = 0.00 kgf
Surmerge Weight = 0.00 kgf
Weight = 0.00 kgf
v23.04.07 2 4/2/2024
SITE NAME : KEBOMASDAHANREJO1 PROJECT : TOWER BERSAMA GROUP
NEW SITE
PERHITUNGAN VOLUME
v23.04.07 3 4/2/2024
SITE NAME : KEBOMASDAHANREJO1 PROJECT : TOWER BERSAMA GROUP
NEW SITE
Sliding Capacity
Friction Coefficient (∂fr) = 0.45
Horizontal Force
Fa = 19.30 kN
SFsliding = Fresisting
Fa
SF Overturning = M resisting
M overturning
= 1.60 > 1.5 (OK)
Bearing Capacity
PCAmats Output = 151.74 KN/m2
v23.04.07 4 4/2/2024
SITE NAME : KEBOMASDAHANREJO1 PROJECT : TOWER BERSAMA GROUP
NEW SITE
Punching Shear
SF Punch Shear = Φ Vc / Vu
= 1.71 > 1 (OK)
v23.04.07 5 4/2/2024
SITE NAME : KEBOMASDAHANREJO1 PROJECT : TOWER BERSAMA GROUP
NEW SITE
PENULANGAN PEDESTAL
Load Factor (µf) = 1.3
Stirrup Bar
Quantity of section (ns) = 2 strength reduction factor for shear
Horizontal force (Vn) = 25.09 kN Φsh = 0.75
Effective depth (Ef.d) = 532 mm
Nominal shear strength of the concrete
Vcon = Φsh*(bb/6)*Ef.d*√fc Stirrup Spacing
= 172.426 kN s = Av*fy*Ef.d/Vs
Minimum Stirrup Spacing = 933 mm
Flexure Bar
minimum reinforcement area minimum Number of bar
2
As.minp = 0.01*b.t*b.b Nbar = As.minp/((π/4)*Pdrd )
= 3600 mm² = 18 or 20
Trial 20
Pcacol Input
Pedestal Dimension = 600 x 600 mm Specified Yield Strength of Steel
Factored Tension = -409.617 kN fy = 420 N/mm²
Factored Compress = 479.444 kN
Factored Moment = 46.409 kN.m Specified Yield Strength of Conrete
fc = 18.675 N/mm²
From Pcacol Output
Recommendation :
Ped Bar 20 D 16
Stirrup D 10 - 150
(OK)
v23.04.07 6 4/2/2024
SITE NAME : KEBOMASDAHANREJO1 PROJECT : TOWER BERSAMA GROUP
NEW SITE
PENULANGAN PAD
Spacing Spacing
s = ( 1000 mm ) / ( n ) s = ( 1000 mm ) / ( n )
s = 287.35 mm s = 287.35 mm
s = 280 mm s = 280 mm
= 200 mm = 100 mm
digunakan tulangan, D16 - 200 mm digunakan tulangan, D16 - 100 mm
v23.04.07 7 4/2/2024
SITE NAME : KEBOMASDAHANREJO1 PROJECT : TOWER BERSAMA GROUP
NEW SITE
Material
Specified Yield Strength of Steel
fy = 420 N/mm2
Flexure Bar
Dimension = 0.2 x 0.3 x 2.8 m
Bar Diamater
D = 16 mm ; => Ab = 201.062 mm2
Minimum Reinforcement
r min = 1.4 / fy = 0.0033
Shear Bar
Effective depth = 232 mm
Spacing = Effective depth / 2
= 116 mm
(OK)
v23.04.07 8 4/2/2024