Professional Documents
Culture Documents
Report
Report
Report
BIS_DataTemplate...xlsx
LRMSRIS.rar
RRReport9thcycle.xlsx
ATCCSamakhiyaliTollPlaza.Analysis638212375237632279.xlsx
SamakhialiGandhidhamRoughness_C9_R1_30052023.xlsx
Data_Templates638146497733849289.rar
Data_Templates9.rar
Roughness8Cycle.xlsx
ATCCSamakhiyaliTollPlaza.Analysis.xlsx
RRRoadSignsandRoadMarking.xlsx
FWDReport4thCycle.xlsx
MBIU7thCycle.xlsx
Data_Templates.rar
ATCCGandhidhamSamakhiyali.xlsx
RRGandhidhamSamakhiali.xlsx
MSVGandhidhamSamaikhialiRoughness.xlsx
MSVGhandidamSamakhiyaliNSVResultsC6R010112021.xlsx
MSVGhandidamSamakhiyaliNSVResultsC5R202062021637599509539683887.xlsx
FWDReportSamakhiyaliGandhidham3rdCycle.pdf
3. MSV-RR Report-C4-R1-07012021637457074560229096.pdf
NSV (Network Survey Vehicle) 4th Cycle637457938023865269.pdf
ATCC based Traffic Survey (4th Cycle)637457893291040195.pdf
AE Report
Samakhiali-Gandhidham- RR Report637605870073440436.pdf
MSV-Gandhidham Samakhiali-ATCC Report-5 Cycle637601502892190826.pdf
arding MBIU (Mobile Bridge Inspection Unit), 4th Cycle.)637491729319328064.pdf
MSV-Gandhidham Samakhiali-NSV Report-C5-R1-03062021637599517309034812.pdf
MSV-Gandhidham Samakhiali-NSV Report-C5-R1-03062021637599509541090084.pdf
NSVReport638373755913318086.pdf
NSVReport638366810905006202.pdf
NSVReport638319415692579675.pdf
NSVReport638313407272436763.pdf
NSVReport638297883100009846.pdf
NSVReport.pdf
MSVGandhidhamSamaikhialiNSVReport638146497734239298.pdf
MSVGandhidhamSamaikhialiNSVReport638048887613483035.pdf
MSVGandhidhamSamaikhialiNSVReport.pdf
637599509539683887.xlsx
Preview Video Contractor Letter No
601502892190826.pdf
319328064.pdf
2021637599517309034812.pdf
2021637599509541090084.pdf
Preview Video 1
Preview Video 1
Preview Video 1
Preview Video 1
Remarks By Contractor Contractor Submittion Date Contractor Document
PD Letter No Remarks By PD
Seen
Seen
Seen
Reject by RAMS Cell
Approved by RAMS Cell
Seen
Forwarded for verification to RAMS cell
Forwarded to RAMS Cell for verification.
OK
OK
compliance must be provided as per the RAMS cell
Please provide required information as per RAMS cell
already submitted once
Rejected by RAMS Cell
You are requested to resubmit the NSV report in the required format as per remarks by the RAMS cell.
Please submit NSV Survey Video of Complete Project stretch comprising every Lane of main carriageway.
ok
Pl submit compliance of RAMS cell.
Retro - relectometer report has been checked and reviewed and action has been taken for the complianc
Report found in order
Report found in order
Rejected by RAMS Cell
Approved by RAMS Cell
Seen
Seen
Seen
Seen
already submitted by IE once
Seen
Reject by RAMS Cell
Seen
Seen
Seen
Seen
Seen
Seen
Report found in order
Report found in order
Report found in order
PD Action Taken date PD Document Year Cycle
2021 1
2021 1
2021 1
2021 1
0
24/01/2024 2023 2
20/01/2024 2023 2
2023 2
2023 1
2023 2
2023 1
0
0
equired format as per remarks by the RAMS cell. 2023 1
tretch comprising every Lane of main carriageway. It is requested to en 0
2023 1
0
ewed and action has been taken for the compliance of damaged 2023 1
2023 1
2023 1
2022 1
2022 2
2022 2
2022 2
2022 2
0
0
2022 1
2022 1
2022 1
2022 1
2022 1
2021 2
2021 2
0
Status Status by Rams Cell
Seen as Information
Seen as Information
Seen as Information
Seen as Information Reject
Seen as Information Accept
Seen as Information
Seen as Information
Seen as Information Accept
Seen as Information
Seen as Information
Instruction back to [AE or contractor] Reject
Instruction back to [AE or contractor] Reject
Instruction back to [AE or contractor] Reject
Instruction back to [AE or contractor] Reject
Instruction back to [AE or contractor] Reject
Instruction back to [AE or contractor] Reject
Seen as Information
Instruction back to [AE or contractor] Reject
Seen as Information
Seen as Information
Seen as Information
Seen as Information Reject
Seen as Information Accept
Seen as Information
Seen as Information
Seen as Information
Seen as Information
Seen as Information
Seen as Information
Seen as Information Reject
Seen as Information
Seen as Information
Seen as Information
Seen as Information
Seen as Information
Seen as Information
Seen as Information
Seen as Information Reject
Seen as Information
Remarks by Rams Cell
Improper NSV Survey Data. NSV Survey data is not in consonance with RAMS import template as available in Data Lake.
Reupload NSV survey data as stipulated in SOP and without alteration in Excel Import template.
NSV Data uploaded in RAMS
@ 28-04-2023 DOS, GIS coordinate are not provided lane wise. Video
Kindly upload the NSV data in excel format as per SOP issued on 14
Action Taken Date by Rams Cell
30/07/2021
12/07/2021
29/01/2024
02/12/2023
03/10/2023
30/09/2023
30/09/2023
14/09/2023
21/08/2023
16/07/2023
21/03/2023
29/11/2022
18/07/2022
18/03/2021
Interpretation
1.Thermoplasticonpainting
NSV Report
(RoadFindings NSV Report
Marking) are faded on various locations (PDF)
of Project Highway.
2.Retro reflectivity
(v)Average of Signisboards
Total vehicles -24054are not satisfactory as per IRC 67-2012. Hence cleaning of Sign boards are required as per R
(vi)Average Total PCU is -76082
The defect of project highway which has been highlighted in the NSV report are at follows potholes, rutting, ravelling are foun
The defect of project Highway which has been highlighted in the NSV report are at follows potholes, reveling, rutting are foun
NSV Report
Retro Reflectometer survey is carried out and same is hereby submitted for further scrutinized.
ATCC Traffic survey (9th Cycle) for the period from 15.04.2023 to 21.04.2023
The defect of project Highway which has been highlighted in the NSV report and roughness are found in the stretch.
The defect of project highway which has been highlighted in the NSV report. Concessionaire’s instructed to ratified as per IRC
The defect of project Highway which has been highlighted in the NSV report are at follows potholes, roughness and rutting ar
The defect of project highway which has been highlighted in the NSV report. Concessionaire’s instructed to ratified as per IRC
ATCC survey conducted on Samakhiali Gandhidham Project from 17.10.2022 to 23.10.2022. As per the ATCC survey conducte
The defects found as per RR Report submitted on 10.11.2022 are as under:- 1. Thermoplastic painting (Road Marking) are fad
erage total Tollable vehicles is -27951 (ii) Average total Tollable PCU is -91845 (iii) Average non-Tollable vehicles is -3423 (iv) Average non-
tic painting (Road Marking) are faded on various locations of Project Highway. 2. Retro reflectivity of Sign boards are not satisfactory as pe
ehicles is -3423 (iv) Average non-tollable PCU is -2023 (v) Average Total vehicles is -31374 (vi) Average Total PCU is -93867.
ctory at various locations of project highway as per IRC 67-2012. Hence cleaning of Sign Boards / replacement are required along with The
boards are not satisfactory as per IRC 67-2012. Hence cleaning of Sign boards are required as per RR Report.
al PCU is -93867.
ment are required along with Thermoplastic Painting (Road Marking) as per RR Report.